Anholt
399.6 MW Under Construction Denmark
Updated weekly to include the latest news, your feedback and other data.
35 Countries, 1173 Windfarms, 7307 Stakeholders, 2711 Events, 161 Vessels, 131 Turbines NEW, 35 Ports,
Filter Projects by Country
Featured Ports
Featured Port
Able Humber Port, United Kingdom Image of <%# Eval("PortName") %> Maximum Trenched Depth: 11 m
Entrance Width: 840 m
Spring Tidal Range: 6.4 m
Quay Length: 1279 m
Quay Loading Capability: 20 tonnes/m2
Land for Development: 647 ha
More details...



Who is generating power
Who's Generating Power?
1.  United Kingdom - 1858.40 MW
2.  Denmark - 874.48 MW
3.  China - 351.00 MW
More...
Whose Turbines are Generating?
Whose Turbines are Generating?
1.  Siemens Wind Power A/S (Siemens AG) - 1522.00 MW
2.  Vestas Offshore A/S (Vestas Wind Systems A/S) - 1404.12 MW
3.  REpower Systems AG (Suzlon Energy Limited) - 250.00 MW
Loading Map
12
VesselRoleOrganisationDescriptionCorrect
Stemat Spirit Vessel-Array Cable Installation(cable lay) Stemat Marine Services Stemat Spirit to be used ti install 111 array cables with a total length of 150km - Client:Visser & Smit Marine Contracting (VSMC) More... correct
Anholt Wind Vessel-Crew Transfer DONG Energy - Anholt Offshore A/S The Anholt Wind will act as a crew transfer vessel. More... correct
Svanen Vessel-Foundation Installation(turbine) Ballast Nedam Offshore B.V. Period: Dec-2011 to Sep-2012
Installation of 111 monopile foundations - Client: A2SEA More...
correct
SEA POWER Vessel-Substation Installation A2SEA Period: Apr-2012 to Apr-2012
Transport and install the transformers - Client: Energinet.dk
correct
Stanislav Yudin Vessel-Substation Installation Seaway Heavy Lifting Ltd Period: Apr-2012
The Stanislav Yudin installed the substation topside. More...
correct
Wind Perfection Vessel-Support C-bed Floating Hotels The Wind Perfection will act as a floating hotel at the project. correct
Jumbo Javelin Vessel-Transition Piece Installation(turbine) Jumbo Offshore V.o.F Period: Apr-2012
Jumbo Offshore will transport all 111 transition pieces. The Jumbo Javelin will transport and install the transition pieces. More...
correct
Vessel-Transportation Jumbo Offshore V.o.F Period: Apr-2012
Jumbo Offshore will transport all 111 transition pieces. One of Jumbo's DP2 Offshore Heavy Lift vessels will transport and install the transition pieces. More...
correct
SEA POWER Vessel-Turbine Installation A2SEA Period: Sep-2012 to 2013
The SEA POWER will install some of the turbines - Client: DONG Energy More...
correct
SEA INSTALLER Vessel-Turbine Installation A2SEA Period: Feb-2013 to 31-Mar-2013
The SEA INSTALLER will install some of the turbines - Client: DONG Energy More...
correct
12
Vessels & Equipment Available for Immediate Charter
Statistics for Anholt
Wind Farm Name Anholt (also known as Djursland Anholt) correct
CountryDenmark
Region Nørre Djurs correct
SeaName Kattegat correct
Centre Latitude 56.603°
Centre Longitude 11.209°
Did you know? Its easy to add a map with this windfarm to your website! More...
Round, tender or callTender (DK)
Development Status Under Construction correct
Comments on the Status 
Status Documentation
Capacity 399.6 MW correct
Turbine Capacity 3.6 MW correct
Number of Turbines 111 correct
Turbine Model SWT-3.6-120 (Siemens) correct
10 Year Mean Wind Speed (2000-2009) Available online now
Other wind speed data at this location: 6 hr/day/month historic data..., BERR, NERL
(Now incorporating NERL models for USA Projects!)
Weather Forecast Services Weather Solutions For Offshore Wind Power
Rotor Diameter 120 m correct
Total Turbine Height 141.6 m correct
Hub Height 82 m correct
Other comments Dong Energy A/S was the only bidder for the wind farm. correct
Foundation Grounded: Monopile correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Area 145 km2
Water Depth Min (Chart Datum) 14 m correct
Water Depth Max (Chart Datum) 17 m correct
Depth range stated by developer 15 m - 19 m correct
Distance From Shore (reported) 15 km correct
Distance From Shore (computed from wind farm centre) 23 km
Export Cable Length 25 km correct
Infield Cable Length 160 km correct
Estimated Infield Cable Length This information is available in the purchased database - please enquire.
Export Cable Capacity 220 kV correct
Infield Cable Capacity 36 kV correct
Number of Export Cables 1 correct
Export Cable Type 245kV AC 3 x 1600 mm2 Aluminium correct
Cable Description correct
Number of Offshore Substations 1 correct
Grid Connection Point correct
Cable Landing Point Grenaa correct
Annual Capacity Factor correct
Expected Life correct
Estimated Capital Cost (CapEx) This information is available in the purchased database - please enquire.
Stated Project Cost DKK(mill) 10000.00 correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Port For Installation Base Grenaa Harbour correct
Port For Ops and Maintenance Grenaa Harbour correct
Number of homes powered annually: 223,436 homes
CO2 Reduced Per Year 451,564 tonnes
SO2 Reduced Per Year 10,501 tonnes
Website Visit correct

Events on Anholt
12
DateTypeDescriptionSourceCorrect
Subscribe
Event Type: Operation - Generating Power                                                                                                                                                                                                                                   Operation - Generating Power
The farm must be fully commissioned by the end of Subscribe. Otherwise the tariff will be reduced and a penalty will be applied. Subscribe correct
Subscribe
Event Type: Operation - Generating Power                                                                                                                                                                                                                                   Operation - Generating Power
Under the agreement the farm must start producing power by the end of Subscribe. Subscribe correct
Sep-2012
Event Type: Installation - Turbine Installation                                                                                                                                                                                                                            Installation - Turbine Installation
Turbine installation will start. Visit correct
Sep-2012
Event Type: Installation - Foundation Installation                                                                                                                                                                                                                         Installation - Foundation Installation
Foundation installation is expected to finish. Visit correct
Aug-2012
Event Type: Installation - Offshore Substation                                                                                                                                                                                                                             Installation - Offshore Substation
The offshore substation will be fully operational. Visit correct
Jun-2012
Event Type: Installation - Cable installation                                                                                                                                                                                                                              Installation - Cable installation
Array cable installation will start. Visit correct
27-Apr-2012
Event Type: Installation - Foundation Installation                                                                                                                                                                                                                         Installation - Foundation Installation
The first transition piece has been installed. Visit correct
06-Apr-2012
Event Type: Installation - Offshore Substation                                                                                                                                                                                                                             Installation - Offshore Substation
Installation of the offshore substation completed. Visit correct
04-Apr-2012
Event Type: Installation - Foundation Installation                                                                                                                                                                                                                         Installation - Foundation Installation
37 monopiles are fully installed. Visit correct
Mar-2012
Event Type: Installation - Foundation Installation                                                                                                                                                                                                                         Installation - Foundation Installation
22 monopiles have been installed to date. Visit correct
12

Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.

Comments on Anholt offshore wind farm Please note, your comment will take 1 hour to appear.

Your Name * :  
Web Site (optional) : http://  
Comment * :  
* required

Added: Mon, 24 Jan 2011 14:20:00 GMT
Oestship is your local contact in Grenaa in relation to marine related services incl. a 24/7 setup for stevedoring, port agency, storage, office facilities and accommodation during project. Please visit us at www.oestship.dk for more details. On 01st January 2011 Oestship became a member of the Blue Water Shipping Group - pls. see more on www.bws.dk


Weather Forecast for Anholt More weather tools available on 4C Interactive Map. More weather forecast tools