Arkona-Becken Südost
480 MW Consent Authorised Germany
Updated weekly to include the latest news, your feedback and other data.
35 Countries, 1173 Windfarms, 7307 Stakeholders, 2711 Events, 161 Vessels, 131 Turbines NEW, 35 Ports,
Filter Projects by Country
Featured Ports
Featured Port
EastPort UK, United Kingdom Image of <%# Eval("PortName") %> Maximum Trenched Depth: 11 m
Entrance Width: 210 m
Spring Tidal Range: 1.96 m
Quay Length: 1400 m
Quay Loading Capability: 3 tonnes/m2
Land for Development: 12 ha
More details...



Who is generating power
Who's Generating Power?
1.  United Kingdom - 1858.40 MW
2.  Denmark - 874.48 MW
3.  China - 351.00 MW
More...
Whose Turbines are Generating?
Whose Turbines are Generating?
1.  Siemens Wind Power A/S (Siemens AG) - 1522.00 MW
2.  Vestas Offshore A/S (Vestas Wind Systems A/S) - 1404.12 MW
3.  REpower Systems AG (Suzlon Energy Limited) - 250.00 MW
Loading Map
Vessels on Arkona-Becken Südost
VesselRoleOrganisationDescriptionCorrect
SEA ENERGY (Formally Ocean Ady) Vessel-Foundation Installation(met mast) DBB Salvage - Dansk Bjergning og Bugsering A/S Period: Nov-2006 to 30-Nov-2006
Transportation and installation of metmastgravity foundation - Client: Ed.Züblin More...
correct
SEA ENERGY (Formally Ocean Ady) Vessel-Met Mast Installation A2SEA Period: Nov-2006 to 30-Nov-2006
Transportation and installation of metmast - Client: Ed. Züblin AG Offshore Wind More...
correct
Excalibur(formerly the Wijslift 6) Vessel-Survey(Geotechnical) Fugro Consult GmbH Excalibur performed geotechnical surveys at the site. More... correct
FUGRO Commander Vessel-Survey(Geotechnical) Fugro Consult GmbH Fugro Commander performed geotechnical surveys at the site. More... correct
SEA ENERGY (Formally Ocean Ady) Vessel-Transportation A2SEA Period: Nov-2006 to 30-Nov-2006
Transportation and installation of metmast - Client: Ed. Züblin AG Offshore Wind More...
correct
Vessels & Equipment Available for Immediate Charter
Statistics for Arkona-Becken Südost
Wind Farm Name Arkona-Becken Südost correct
CountryGermany
Region Exclusive Economic Zone (Baltic) correct
SeaName Baltic Sea correct
Centre Latitude 54.782°
Centre Longitude 14.121°
Did you know? Its easy to add a map with this windfarm to your website! More...
Round, tender or call 
Development Status Consent Authorised correct
Comments on the Status 
Status Documentation This is the Approval Document
Capacity 480 MW correct
Turbine Capacity 6 MW correct
Number of Turbines 80 correct
Turbine Model Not Decided correct
10 Year Mean Wind Speed (2000-2009) Available online now
Other wind speed data at this location: 6 hr/day/month historic data..., BERR, NERL
(Now incorporating NERL models for USA Projects!)
Weather Forecast Services Weather Solutions For Offshore Wind Power
Rotor Diameter correct
Total Turbine Height correct
Hub Height correct
Other comments correct
Foundation Not Decided correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Area 39 km2
Water Depth Min (Chart Datum) 21 m correct
Water Depth Max (Chart Datum) 27 m correct
Depth range stated by developer correct
Distance From Shore (reported) 35 km correct
Distance From Shore (computed from wind farm centre) 37.6 km
Export Cable Length correct
Infield Cable Length correct
Estimated Infield Cable Length This information is available in the purchased database - please enquire.
Export Cable Capacity correct
Infield Cable Capacity correct
Number of Export Cables correct
Export Cable Type correct
Cable Description correct
Number of Offshore Substations correct
Grid Connection Point Lubmin correct
Cable Landing Point Lubmin correct
Annual Capacity Factor correct
Expected Life correct
Estimated Capital Cost (CapEx) This information is available in the purchased database - please enquire.
Stated Project Cost correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Port For Installation Base correct
Port For Ops and Maintenance correct
Number of homes powered annually: 268,391 homes
CO2 Reduced Per Year 542,419 tonnes
SO2 Reduced Per Year 12,614 tonnes
Website No Website correct

Events on Arkona-Becken Südost
DateTypeDescriptionSourceCorrect
Subscribe
Event Type: Installation - Offshore Construction Starts                                                                                                                                                                                                                    Installation - Offshore Construction Starts
The BSH has extended the construction start to Subscribe. The project must start construction by this date. Subscribe correct
Subscribe
Event Type: Installation - Offshore Construction Starts                                                                                                                                                                                                                    Installation - Offshore Construction Starts
Estimated Installation Start Year (Grid connection now approved) Subscribe correct
15-Mar-2006
Event Type: Planning - Consent Authorised                                                                                                                                                                                                                                  Planning - Consent Authorised
Installation of wind farm approved by BSH Visit correct
2006
Event Type: Installation - Met Mast                                                                                                                                                                                                                                        Installation - Met Mast
Met mast installed in 2006. Visit correct
Oct-2001
Event Type: PrePlanning - Strategy Development                                                                                                                                                                                                                             PrePlanning - Strategy Development
Scoping conference in Stralsund Visit correct
12-May-2000
Event Type: Planning - Consent Appeal Submitted                                                                                                                                                                                                                            Planning - Consent Appeal Submitted
Date of Application Visit correct

Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.

Be the first to comment on Arkona-Becken Südost offshore wind farm Please note, your comment will take 1 hour to appear.

Your Name * :  
Web Site (optional) : http://  
Comment * :  
* required


Weather Forecast for Arkona-Becken Südost More weather tools available on 4C Interactive Map. More weather forecast tools