Asa Branca 12
480 MW Consent Application Submitted Brazil
Updated weekly to include the latest news, your feedback and other data.
35 Countries, 1173 Windfarms, 7307 Stakeholders, 2711 Events, 161 Vessels, 131 Turbines NEW, 35 Ports,
Filter Projects by Country
Featured Ports
Featured Port
Able Humber Port, United Kingdom Image of <%# Eval("PortName") %> Maximum Trenched Depth: 11 m
Entrance Width: 840 m
Spring Tidal Range: 6.4 m
Quay Length: 1279 m
Quay Loading Capability: 20 tonnes/m2
Land for Development: 647 ha
More details...



Who is generating power
Who's Generating Power?
1.  United Kingdom - 1858.40 MW
2.  Denmark - 874.48 MW
3.  China - 351.00 MW
More...
Whose Turbines are Generating?
Whose Turbines are Generating?
1.  Siemens Wind Power A/S (Siemens AG) - 1522.00 MW
2.  Vestas Offshore A/S (Vestas Wind Systems A/S) - 1404.12 MW
3.  REpower Systems AG (Suzlon Energy Limited) - 250.00 MW
Loading Map
RoleOrganisationDescription 
Developer Asa Branca 12 (Asa Branca) correct
Owner Eolica Brasil Ltda
Percentage: Subscribe
correct
Vessels & Equipment Available for Immediate Charter
Statistics for Asa Branca 12
Wind Farm Name Asa Branca 12 correct
CountryBrazil
Region Brazil's North Coast - CearĂ¡ State correct
SeaName Atlantic Ocean correct
Centre Latitude -2.732°
Centre Longitude -40.167°
Did you know? Its easy to add a map with this windfarm to your website! More...
Round, tender or call 
Development Status Consent Application Submitted correct
Comments on the StatusProject awaiting for the Federal Asset Secretariat to sign usage agreement.
Status Documentation
Capacity 480 MW correct
Turbine Capacity 5 MW correct
Number of Turbines 96 correct
Turbine Model Not Decided correct
10 Year Mean Wind Speed (2000-2009) Available online now
Other wind speed data at this location: 6 hr/day/month historic data..., BERR, NERL
(Now incorporating NERL models for USA Projects!)
Weather Forecast Services Weather Solutions For Offshore Wind Power
Rotor Diameter correct
Total Turbine Height correct
Hub Height correct
Other comments Due to environmental issues a floating island may have to be used instead of a land based port. correct
Foundation Not Decided (Monopile or Gravity Base) correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Area 150 km2
Water Depth Min (Chart Datum) 2 m correct
Water Depth Max (Chart Datum) 7 m correct
Depth range stated by developer correct
Distance From Shore (reported) correct
Distance From Shore (computed from wind farm centre) 10 km
Export Cable Length correct
Infield Cable Length 85 km correct
Estimated Infield Cable Length This information is available in the purchased database - please enquire.
Export Cable Capacity 390 kV correct
Infield Cable Capacity 33 kV correct
Number of Export Cables 2 correct
Export Cable Type 800mm 390kV Cable correct
Cable Description 95mm33kV - 20,0 km, 240mm33kV - 13,3 km, 400mm33kV - 26,3 km, 800mm33kV - 25,4 km correct
Number of Offshore Substations 2 correct
Grid Connection Point correct
Cable Landing Point correct
Annual Capacity Factor correct
Expected Life correct
Estimated Capital Cost (CapEx) This information is available in the purchased database - please enquire.
Stated Project Cost correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Port For Installation Base correct
Port For Ops and Maintenance correct
Number of homes powered annually: 268,391 homes
CO2 Reduced Per Year 542,419 tonnes
SO2 Reduced Per Year 12,614 tonnes
Website Visit correct

Events on Asa Branca 12
DateTypeDescriptionSourceCorrect
Subscribe
Event Type: Operation - Generating Power                                                                                                                                                                                                                                   Operation - Generating Power
Estimated start of generation Subscribe correct
Subscribe
Event Type: Installation - Offshore Construction Starts                                                                                                                                                                                                                    Installation - Offshore Construction Starts
Estimated start of construction Subscribe correct

Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.

Be the first to comment on Asa Branca 12 offshore wind farm Please note, your comment will take 1 hour to appear.

Your Name * :  
Web Site (optional) : http://  
Comment * :  
* required


Weather Forecast for Asa Branca 12 More weather tools available on 4C Interactive Map. More weather forecast tools