Baie de Seine
300 MW Dormant France
Updated weekly to include the latest news, your feedback and other data.
35 Countries, 1173 Windfarms, 7307 Stakeholders, 2711 Events, 161 Vessels, 131 Turbines NEW, 35 Ports,
Filter Projects by Country
Featured Ports
Featured Port
Vlissingen - Verbrugge Terminals, The Netherlands Image of <%# Eval("PortName") %> Maximum Trenched Depth: 13.3 m
Entrance Width: 372 m
Spring Tidal Range: 5 m
Quay Length: 1200 m
Quay Loading Capability: 15 tonnes/m2
Land for Development: 70 ha
More details...



Who is generating power
Who's Generating Power?
1.  United Kingdom - 1858.40 MW
2.  Denmark - 874.48 MW
3.  China - 351.00 MW
More...
Whose Turbines are Generating?
Whose Turbines are Generating?
1.  Siemens Wind Power A/S (Siemens AG) - 1522.00 MW
2.  Vestas Offshore A/S (Vestas Wind Systems A/S) - 1404.12 MW
3.  REpower Systems AG (Suzlon Energy Limited) - 250.00 MW
Loading Map
RoleOrganisationDescription 
Developer Poweo
Value: Subscribe
correct
Owner Poweo
Percentage: Subscribe
correct
Vessels & Equipment Available for Immediate Charter
Statistics for Baie de Seine
Wind Farm Name Baie de Seine correct
CountryFrance
Region Basse-Normandie correct
SeaName English Channel correct
Centre Latitude 49.471°
Centre Longitude -0.531°
Did you know? Its easy to add a map with this windfarm to your website! More...
Round, tender or call2011 Tender
Development Status Dormant correct
Comments on the Status 
Status Documentation
Capacity 300 MW correct
Turbine Capacity 6 MW correct
Number of Turbines 50 correct
Turbine Model Not Decided correct
10 Year Mean Wind Speed (2000-2009) Available online now
Other wind speed data at this location: 6 hr/day/month historic data..., BERR, NERL
(Now incorporating NERL models for USA Projects!)
Weather Forecast Services Weather Solutions For Offshore Wind Power
Rotor Diameter 130 m correct
Total Turbine Height 155 m correct
Hub Height 90 m correct
Other comments correct
Foundation Not Decided correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Area 30 km2
Water Depth Min (Chart Datum) 22 m correct
Water Depth Max (Chart Datum) 28 m correct
Depth range stated by developer 22 m - 28 m correct
Distance From Shore (reported) 10 km correct
Distance From Shore (computed from wind farm centre) 14 km
Export Cable Length correct
Infield Cable Length correct
Estimated Infield Cable Length This information is available in the purchased database - please enquire.
Export Cable Capacity 225 kV correct
Infield Cable Capacity 33 kV correct
Number of Export Cables 1 correct
Export Cable Type correct
Cable Description correct
Number of Offshore Substations 1 correct
Grid Connection Point Caen correct
Cable Landing Point correct
Annual Capacity Factor correct
Expected Life 20 years correct
Estimated Capital Cost (CapEx) This information is available in the purchased database - please enquire.
Stated Project Cost EUR(mill) 900.00 correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Port For Installation Base correct
Port For Ops and Maintenance correct
Number of homes powered annually: 167,745 homes
CO2 Reduced Per Year 339,012 tonnes
SO2 Reduced Per Year 7,884 tonnes
Website No Website correct

Events on Baie de Seine
DateTypeDescriptionSourceCorrect
Apr-2015
Event Type: Planning - Consent Authorised                                                                                                                                                                                                                                  Planning - Consent Authorised
Authorities to grant concession to enable the operator to use the States property ("Concession d’utilisation du domaine public maritime") Visit correct
Subscribe
Event Type: Installation - Offshore Construction Starts                                                                                                                                                                                                                    Installation - Offshore Construction Starts
Construction to start from Subscribe Subscribe correct
Subscribe
Event Type: Operation - Generating Power                                                                                                                                                                                                                                   Operation - Generating Power
Expected start of power generation Subscribe correct
Oct-2014
Event Type: Planning - Consent Application Submitted                                                                                                                                                                                                                       Planning - Consent Application Submitted
Must submit request to authorities for authorization to occupy the maritime public domain in accordance with article L.2124-3 of the Code général de la propriété des personnes publiques Visit correct
2009
Event Type: Planning - Consent Application Submitted                                                                                                                                                                                                                       Planning - Consent Application Submitted
Consent Application Submitted Other correct
2008
Event Type: Planning - Site Investigation                                                                                                                                                                                                                                  Planning - Site Investigation
Environmental Impact Assessment carried out between 2008 and 2009 Other correct
2005
Event Type: PrePlanning - Feasibility Study                                                                                                                                                                                                                                PrePlanning - Feasibility Study
Feasibility study carried out between 2005 and 2007 Other correct

Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.

Be the first to comment on Baie de Seine offshore wind farm Please note, your comment will take 1 hour to appear.

Your Name * :  
Web Site (optional) : http://  
Comment * :  
* required


Weather Forecast for Baie de Seine More weather tools available on 4C Interactive Map. More weather forecast tools