spirits
Beatrice Demonstration
10 MW Fully Commissioned United Kingdom
Updated weekly to include the latest news, your feedback and other data.
38 Countries, 1317 Windfarms, 9090 Stakeholders, 4282 Events, 824 Vessels, 153 Turbines NEW, 42 Ports,
Filter Projects by Country
Featured Ports
Featured Port
Able Seaton Port, United Kingdom Image of <%# Eval("PortName") %> Maximum Trenched Depth: 15 m
Entrance Width: 125 m
Spring Tidal Range: 4.6 m
Quay Length: 791 m
Quay Loading Capability: 60 tonnes/m2
Land for Development: 45 ha
More details...



Who is generating power
Who's Generating Power?
1.  United Kingdom - 3321.2000 MW
2.  Denmark - 871.4800 MW
3.  China - 559.5000 MW
More...
Whose Turbines are Generating?
Whose Turbines are Generating?
1.  Siemens Wind Power A/S (Siemens AG) - 3084.8000 MW
2.  Vestas Offshore A/S (Vestas Wind Systems A/S) - 1401.1200 MW
3.  REpower Systems AG (Suzlon Energy Limited) - 434.5000 MW
Loading Map
Equipment Available for Charter
Statistics for Beatrice Demonstration
General Information Name Beatrice Demonstration correct
Other names correct
Country name United Kingdom correct
Region Scotland, Highland correct
Comments correct
Round (or category) Deepwater Demonstration correct
Development status Fully Commissioned correct
Comments on the status correct
Power & Turbines Notice any Errors? You can keep this an open resource by submitting corrections!
Project Capacity 10 MW correct
Turbine Model 5M (REpower) correct
Turbine Capacity 5.08 MW correct
Number of Turbines 2 correct
Total Turbine Height 170 m correct
Hub Height 107.00 m correct
Rotor Diameter 126 m correct
Foundation Grounded: Jacket correct
Windspeed 10 Year Mean Wind Speed (2000-2009) Available online now
Detailed wind speed data 6 hr/day/month historic data
Costs Stated Project Cost EUR(mill) 41.00 correct
Location & Environment Sea name North Sea, Northern North Sea (Cromarty) correct
Centre latitude 58.098° correct
Centre longitude -3.078° correct
Area 1 km2 correct
Depth range (Chart Datum) 45 m - 45 m correct
Depth range stated by developer correct
Distance From Shore (reported) 23 km correct
Distance From Shore (computed from centre) 24.2 km correct
Ports Installation base Nigg, Cromarty Firth correct
Ops and maintenance Buckie correct
Grid Converter platforms None correct
Offshore transformers None correct
Grid connection point Via existing 33kV cable from Tallsman Beatrice A Platform Complex correct
Cable landing point correct
Export Cables
Please note that export cables connect the offshore transformer (substation) to either; shore or an offshore HVAC-HVDC converter station for onward transmission via HVDC cabling. Please see the converters page for planned converter stations and transmission cables.

The export cable length does not generally include the onshore component. The exception is when the onshore substation is close to shore.
Number of Export Cables 1 correct
Average length per cable 1.92 km correct
Transmission type (e.g. HVAC) MVAC correct
Nominal voltage 33 kV correct
Maximum voltage correct
Power rating correct
Number of cores 3 correct
Conductor type correct
Section 70 mm2 correct
Insulation correct
Number fibre optics correct
Minimum bend radius (MBR) correct
Burial depth correct
Comments correct
Onshore Cables (new) Number of onshore cables correct
Average length per cable correct
Comments 33kV correct
Array Cables Array cable length 0.97 km correct
Estimated cable length In purchased database
Transmission type (e.g. MVAC) MVAC correct
Nominal voltage 33 kV correct
Maximum voltage correct
Burial depth 1 m correct
Number of cores 3 correct
Conductor type Cu correct
Section 70 mm2 correct
Insulation correct
Power rating correct
Number of fibre optics correct
Minimum bend radius (MBR) correct
Comments 970 m between the turbines and 1920 m from WTG A to the platform. correct
Benefits Homes powered annually 5591 correct
CO2 reduced per year 11300 tonnes correct
SO2 reduced per year 263 tonnes correct
Expected life 5.0 years correct
Other Website Visit correct

Events on Beatrice Demonstration
DateTypeDescriptionSourceCorrect
Sep-2007
Event Type: Operation - Fully Commissioned                                                                                                                                                                                                                                 Operation - Fully Commissioned
Fully commissioned Visit correct
08-Jul-2007
Event Type: Installation - Turbine Installation                                                                                                                                                                                                                            Installation - Turbine Installation
Installation of turbine B. Visit correct
Feb-2007
Event Type: Operation - Generating Power                                                                                                                                                                                                                                   Operation - Generating Power
First power supplied from the wind farm. Visit correct
11-Sep-2006
Event Type: Installation - Turbine Installation                                                                                                                                                                                                                            Installation - Turbine Installation
One of the turbine blades was damaged during assembly at Nigg yard. Other correct
Aug-2006
Event Type: Installation - Turbine Installation                                                                                                                                                                                                                            Installation - Turbine Installation
Installation of turbine A. Visit correct
2006
Event Type: Installation - Foundation Installation                                                                                                                                                                                                                         Installation - Foundation Installation
Foundations were installed in 2006. Visit correct
2006
Event Type: Planning - Consent Authorised                                                                                                                                                                                                                                  Planning - Consent Authorised
Estimated date for consent authorisation Other correct
2005
Event Type: Planning - Consent Application Submitted                                                                                                                                                                                                                       Planning - Consent Application Submitted
Estimated date for submission of consent Visit correct

Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.
Be the first to comment on Beatrice Demonstration offshore wind farm Please note, your comment will take 1 hour to appear.

Your Name * :  
Web Site (optional) : http://  
Comment * :  
* required