spirits
Label
uk46
GB
Beatrice Demonstration offshore wind farm
Label
Label
images/wfmaps/UK46.jpg
Offshore Wind Farms
Vessels
Turbines
News
Reports
(new)
Downloads
Equipment
Ports
Contact
Advertise
Login
Subscribe
Project Database
Timeline Chart
Converters
Substations
Global Map
Maps For Your Website
(improved!)
Wind Speeds
Power Data
Beatrice Demonstration
10 MW
Updated weekly to include the latest news, your feedback and other data.
38
Countries,
1317
Windfarms
,
9090
Stakeholders,
4282
Events,
824
Vessels
,
153
Turbines
NEW
,
42
Ports
,
Subscribe!
Filter Projects by Country
Albania
Australia
Azerbaijan
Bangladesh
Belgium
Brazil
Canada
China
Croatia
Denmark
Estonia
Finland
France
Germany
Greece
India
Ireland
Italy
Japan
Latvia
Lithuania
Maldives
Malta
Netherlands
Norway
Poland
Portugal
Romania
Russia
South Korea
Spain
Sri Lanka
Sweden
Taiwan
Tunisia
United Kingdom
United States
Vietnam
1
2
3
4
Status
Name
Barrow
Beatrice Demonstration
Blyth
Burbo Bank
Greater Gabbard
Gunfleet Sands 3 - Demonstration Project
Gunfleet Sands I + II
Inner Dowsing
Kentish Flats
London Array Phase 1
Lynn
North Hoyle
Ormonde
Rhyl Flats
Robin Rigg
Scroby Sands
Sheringham Shoal
Thanet
Walney Phase 1
Walney Phase 2
Lincs
Teesside
Gwynt y Môr
Hunterston Test Centre (onshore)
West of Duddon Sands
2-B Energy Test Site
Dudgeon
European Offshore Wind Deployment Centre - EOWDC
Fife Energy Park
Humber Gateway
Kentish Flats Extension
London Array Phase 2
Race Bank
Westermost Rough
Beatrice
Burbo Bank Extension
East Anglia One
Firth of Forth Phase 1 Alpha
Firth of Forth Phase 1 Bravo
Galloper Wind Farm
1
2
3
4
Featured Port
Able Seaton Port, United Kingdom
Maximum Trenched Depth: 15 m
Entrance Width: 125 m
Spring Tidal Range: 4.6 m
Quay Length: 791 m
Quay Loading Capability: 60 tonnes/m
2
Land for Development: 45 ha
More details...
Offshore Wind Ports
Aalborg Port
Able Humber Port
Able Middlesbrough Port
Able Seaton Port
BOW Terminal Vlissingen
EastPort UK
Great Yarmouth - Fendercare Marine Equipment & Lifting Services
Harwich Navyard
Lyness - Fendercare Marine
Newhaven - Fendercare Marine
Port of Wilhelmshaven
Rebo terminal, port of Oostende
Rønne Havn
Vlissingen - Verbrugge Terminals
More ports...
Who's Generating Power?
1.
United Kingdom
-
3321.2000 MW
2.
Denmark
-
871.4800 MW
3.
China
-
559.5000 MW
More...
Whose Turbines are Generating?
1.
Siemens Wind Power A/S (Siemens AG)
-
3084.8000 MW
2.
Vestas Offshore A/S (Vestas Wind Systems A/S)
-
1401.1200 MW
3.
REpower Systems AG (Suzlon Energy Limited)
-
434.5000 MW
Subscribe!
This is the 1st latest news item.
This is the 2nd latest news item.
This is the 3rd latest news item.
This is the 4th latest news item.
Developers/Owners/Operators
Database as Excel
|
Add Your Organisation
|
Check Your 4C Entries
Role
Organisation
Description
Developer
Scottish and Southern Energy (SSE)
Joint venture with Talisman UK
Developer
Talisman Energy (UK) Ltd
Joint venture with Scottish and Southern Energy.
Operator
Scottish and Southern Energy (SSE)
Joint venture with Talisman UK
Operator
Talisman Energy (UK) Ltd
Joint venture with Scottish and Southern Energy.
Owner
Scottish and Southern Energy (SSE)
Joint venture with Talisman UK
Percentage:
Subscribe
Owner
Talisman Energy (UK) Ltd
Joint venture with Scottish and Southern Energy.
Percentage:
Subscribe
Click here to view the Supply Chain!
Click here to view all Vessels!
Equipment Available for Charter
Statistics for Beatrice Demonstration
Database in Excel
General Information
Name
Beatrice Demonstration
Other names
Country name
United Kingdom
Region
Scotland, Highland
Comments
Round (or category)
Deepwater Demonstration
Development status
Fully Commissioned
Comments on the status
Power & Turbines
Notice any Errors?
You can keep this an open resource by submitting corrections!
Project Capacity
10 MW
Turbine Model
5M (REpower)
Turbine Capacity
5.08 MW
Number of Turbines
2
Total Turbine Height
170 m
Hub Height
107.00 m
Rotor Diameter
126 m
Foundation
Grounded: Jacket
Download Database for Excel
Windspeed
10 Year Mean Wind Speed (2000-2009)
Available online now
Detailed wind speed data
6 hr/day/month historic data
Costs
Stated Project Cost
EUR(mill) 41.00
Location & Environment
Sea name
North Sea, Northern North Sea (Cromarty)
Centre latitude
58.098°
Centre longitude
-3.078°
Area
1 km
2
Depth range (Chart Datum)
45 m - 45 m
Depth range stated by developer
Distance From Shore (reported)
23 km
Distance From Shore (computed from centre)
24.2 km
Ports
Installation base
Nigg, Cromarty Firth
Ops and maintenance
Buckie
Grid
Converter platforms
None
Offshore transformers
None
Grid connection point
Via existing 33kV cable from Tallsman Beatrice A Platform Complex
Cable landing point
Export Cables
Please note that export cables connect the offshore transformer (substation) to either; shore or an offshore HVAC-HVDC converter station for onward transmission via HVDC cabling. Please see the
converters page
for planned converter stations and transmission cables.
The export cable length does not generally include the onshore component. The exception is when the onshore substation is close to shore.
Number of Export Cables
1
Average length per cable
1.92 km
Transmission type (e.g. HVAC)
MVAC
Nominal voltage
33 kV
Maximum voltage
Power rating
Number of cores
3
Conductor type
Section
70 mm
2
Insulation
Number fibre optics
Minimum bend radius (MBR)
Burial depth
Comments
Onshore Cables
(new)
Number of onshore cables
Average length per cable
Comments
33kV
Array Cables
Array cable length
0.97 km
Estimated cable length
In purchased database
Transmission type (e.g. MVAC)
MVAC
Nominal voltage
33 kV
Maximum voltage
Burial depth
1 m
Number of cores
3
Conductor type
Cu
Section
70 mm
2
Insulation
Power rating
Number of fibre optics
Minimum bend radius (MBR)
Comments
970 m between the turbines and 1920 m from WTG A to the platform.
Benefits
Homes powered annually
5591
CO
2
reduced per year
11300 tonnes
SO
2
reduced per year
263 tonnes
Expected life
5.0 years
Other
Website
Visit
Events on Beatrice Demonstration
Database in Excel
Date
Type
Description
Source
Correct
Sep-2007
Operation - Fully Commissioned
Fully commissioned
Visit
08-Jul-2007
Installation - Turbine Installation
Installation of turbine B.
Visit
Feb-2007
Operation - Generating Power
First power supplied from the wind farm.
Visit
11-Sep-2006
Installation - Turbine Installation
One of the turbine blades was damaged during assembly at Nigg yard.
Other
Aug-2006
Installation - Turbine Installation
Installation of turbine A.
Visit
2006
Installation - Foundation Installation
Foundations were installed in 2006.
Visit
2006
Planning - Consent Authorised
Estimated date for consent authorisation
Other
2005
Planning - Consent Application Submitted
Estimated date for submission of consent
Visit
Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.
Be the first to comment on Beatrice Demonstration offshore wind farm
Please note,
your comment will take 1 hour to appear
.
Your Name *
:
Web Site (optional)
:
http://
Comment *
:
* required
<< Newer Comments
Older Comments >>