Bockstigen
2.75 MW Fully Commissioned Sweden
Updated weekly to include the latest news, your feedback and other data.
35 Countries, 1173 Windfarms, 7307 Stakeholders, 2711 Events, 161 Vessels, 131 Turbines NEW, 35 Ports,
Filter Projects by Country
Featured Ports
Featured Port
Able Middlesbrough Port, United Kingdom Image of <%# Eval("PortName") %> Maximum Trenched Depth: 8.5 m
Entrance Width: 84 m
Spring Tidal Range: 4.6 m
Quay Length: 250 m
Quay Loading Capability: 25 tonnes/m2
Land for Development: 16 ha
More details...



Who is generating power
Who's Generating Power?
1.  United Kingdom - 1858.40 MW
2.  Denmark - 874.48 MW
3.  China - 351.00 MW
More...
Whose Turbines are Generating?
Whose Turbines are Generating?
1.  Siemens Wind Power A/S (Siemens AG) - 1522.00 MW
2.  Vestas Offshore A/S (Vestas Wind Systems A/S) - 1404.12 MW
3.  REpower Systems AG (Suzlon Energy Limited) - 250.00 MW
Loading Map
RoleOrganisationDescription 
Developer OM O2 (formerly O2 Vindkompaniet) correct
VesselRoleOrganisationDescriptionCorrect
Deep Diver Vessel-Foundation Installation(turbine) Seacore Limited Installation of five 2.1m diameter monopile foundations More... correct
Deep Diver Vessel-Turbine Installation Seacore Limited Installation of five Wind World 550 kW turbines. More... correct
Vessels & Equipment Available for Immediate Charter
Statistics for Bockstigen
Wind Farm Name Bockstigen correct
CountrySweden
Region Gotland Kommun correct
SeaName Baltic Sea correct
Centre Latitude 57.036°
Centre Longitude 18.150°
Did you know? Its easy to add a map with this windfarm to your website! More...
Round, tender or call 
Development Status Fully Commissioned correct
Comments on the Status 
Status Documentation
Capacity 2.75 MW correct
Turbine Capacity 0.55 MW correct
Number of Turbines 5 correct
Turbine Model Wind World 550kW (Wind World A/S) correct
10 Year Mean Wind Speed (2000-2009) Available online now
Other wind speed data at this location: 6 hr/day/month historic data..., BERR, NERL
(Now incorporating NERL models for USA Projects!)
Weather Forecast Services Weather Solutions For Offshore Wind Power
Rotor Diameter 37 m correct
Total Turbine Height 60 m correct
Hub Height 42 m correct
Other comments correct
Foundation Grounded: Monopile correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Area 0 km2
Water Depth Min (Chart Datum) 5 m correct
Water Depth Max (Chart Datum) 6 m correct
Depth range stated by developer correct
Distance From Shore (reported) 4 km correct
Distance From Shore (computed from wind farm centre) 5.8 km
Export Cable Length correct
Infield Cable Length correct
Estimated Infield Cable Length This information is available in the purchased database - please enquire.
Export Cable Capacity correct
Infield Cable Capacity correct
Number of Export Cables correct
Export Cable Type correct
Cable Description correct
Number of Offshore Substations correct
Grid Connection Point Gotland-Valar correct
Cable Landing Point Gotland-Valar correct
Annual Capacity Factor correct
Expected Life correct
Estimated Capital Cost (CapEx) This information is available in the purchased database - please enquire.
Stated Project Cost EUR(mill) 4.00 correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Port For Installation Base Klintehamn, Burgvik correct
Port For Ops and Maintenance correct
Number of homes powered annually: 1,538 homes
CO2 Reduced Per Year 3,108 tonnes
SO2 Reduced Per Year 72 tonnes
Website No Website correct

Events on Bockstigen
DateTypeDescriptionSourceCorrect
1998
Event Type: Installation - Offshore Construction Starts                                                                                                                                                                                                                    Installation - Offshore Construction Starts
Likely Installation Year Visit correct
1998
Event Type: Operation - Generating Power                                                                                                                                                                                                                                   Operation - Generating Power
Started to generate power in 1998. Visit correct

Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.

Be the first to comment on Bockstigen offshore wind farm Please note, your comment will take 1 hour to appear.

Your Name * :  
Web Site (optional) : http://  
Comment * :  
* required


Weather Forecast for Bockstigen More weather tools available on 4C Interactive Map. More weather forecast tools