Borkum Phase 2
200 MW Consent Authorised Germany
Updated weekly to include the latest news, your feedback and other data.
35 Countries, 1173 Windfarms, 7307 Stakeholders, 2711 Events, 161 Vessels, 131 Turbines NEW, 35 Ports,
Filter Projects by Country
Featured Ports
Featured Port
Harwich Navyard, United Kingdom Image of <%# Eval("PortName") %> Maximum Trenched Depth: 8.5 m
Entrance Width:
Spring Tidal Range: 4.8 m
Quay Length: 175 m
Quay Loading Capability:
Land for Development:
More details...



Who is generating power
Who's Generating Power?
1.  United Kingdom - 1858.40 MW
2.  Denmark - 874.48 MW
3.  China - 351.00 MW
More...
Whose Turbines are Generating?
Whose Turbines are Generating?
1.  Siemens Wind Power A/S (Siemens AG) - 1522.00 MW
2.  Vestas Offshore A/S (Vestas Wind Systems A/S) - 1404.12 MW
3.  REpower Systems AG (Suzlon Energy Limited) - 250.00 MW
Loading Map
VesselRoleOrganisationDescriptionCorrect
Offshore BHV Vessel-Transportation BLG AutoTerminal Bremerhaven GmbH & Co. KG Transportation of 70 tripods with the new heavy-duty pontoon OFFSHORE BHV from Weserwind in Bremerhan to the production facility in at offshore terminal ABC-Halbinsel in Bremerhaven. More... correct
Vessels & Equipment Available for Immediate Charter
Statistics for Borkum Phase 2
Wind Farm Name Borkum Phase 2 (also known as Borkum West II Phase 1) correct
CountryGermany
Region Exclusive Economic Zone (DolWin) correct
SeaName North Sea correct
Centre Latitude 54.050°
Centre Longitude 6.466°
Did you know? Its easy to add a map with this windfarm to your website! More...
Round, tender or call 
Development Status Consent Authorised correct
Comments on the Status 
Status Documentation This is the Approval Document
Capacity 200 MW correct
Turbine Capacity 5 MW correct
Number of Turbines 40 correct
Turbine Model M5000-116 (Areva Wind) correct
10 Year Mean Wind Speed (2000-2009) Available online now
Other wind speed data at this location: 6 hr/day/month historic data..., BERR, NERL
(Now incorporating NERL models for USA Projects!)
Weather Forecast Services Weather Solutions For Offshore Wind Power
Rotor Diameter 116 m correct
Total Turbine Height 148 m correct
Hub Height 90 m correct
Other comments Site now split into two stages. Stage one due to be operational by end of 2012. Depending on financial situation, stage 2 will follow shortly after.
The wind farm will be connected to the DolWin1 grid connection. correct
Foundation Grounded: Tripod correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Area 33 km2
Water Depth Min (Chart Datum) 28 m correct
Water Depth Max (Chart Datum) 33 m correct
Depth range stated by developer 29 m - 33 m correct
Distance From Shore (reported) 45 km correct
Distance From Shore (computed from wind farm centre) 65.6 km
Export Cable Length 7.5 km correct
Infield Cable Length correct
Estimated Infield Cable Length This information is available in the purchased database - please enquire.
Export Cable Capacity 320 kV correct
Infield Cable Capacity correct
Number of Export Cables correct
Export Cable Type correct
Cable Description correct
Number of Offshore Substations correct
Grid Connection Point DolWin1 (alpha) offshore platform - Dörpen West (Onshore) correct
Cable Landing Point Hilgenriedersiel correct
Annual Capacity Factor correct
Expected Life 25 years correct
Estimated Capital Cost (CapEx) This information is available in the purchased database - please enquire.
Stated Project Cost EUR(mill) 720.00 correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Port For Installation Base correct
Port For Ops and Maintenance correct
Number of homes powered annually: 111,830 homes
CO2 Reduced Per Year 226,008 tonnes
SO2 Reduced Per Year 5,256 tonnes
Website Visit correct

Events on Borkum Phase 2
DateTypeDescriptionSourceCorrect
Subscribe
Event Type: Installation - Offshore Construction Starts                                                                                                                                                                                                                    Installation - Offshore Construction Starts
Estimated Installation Start Subscribe correct
13-Jun-2008
Event Type: Planning - Consent Authorised                                                                                                                                                                                                                                  Planning - Consent Authorised
Consent authorised Visit correct
10-Apr-2006
Event Type: Planning - Consent Application Submitted                                                                                                                                                                                                                       Planning - Consent Application Submitted
Date of application to authorities Visit correct

Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.

Be the first to comment on Borkum Phase 2 offshore wind farm Please note, your comment will take 1 hour to appear.

Your Name * :  
Web Site (optional) : http://  
Comment * :  
* required


Weather Forecast for Borkum Phase 2 More weather tools available on 4C Interactive Map. More weather forecast tools