4C Offshore Empowering Intelligence

Breman delivers delivers second monopile gripper

4C Offshore | Tom Russell
By: Tom Russell 24/06/2015 Bremen Machinery
Breman Machinery recently delivered a second Mono-pile Gripper on behalf of Van Oord Ship Management.

After success with the first gripper, Van Oord ordered a second gripper by the end of October 2014. The second gripper, measuring 14,5x29x13,5m and with a weight of 560 mT was assembled and tested at Bremans facility in Ijmuiden. This new facility, built in 2013, is located in the port of IJmuiden and has an open connection to the North Sea.


The gripper was partially welded, machined and painted at Bremans facility in Genemuiden.

According to Breman in order to reach a short delivery time like on this gripper, they re-examined the whole production process of Gripper 1.0 and made, wherever possible, changes to improve the quality and shorten the lead time.

Premium

ForeSEE Premium, our most popular subscription, gives you full access to use the ForeSEE WebApp which includes exclusive offshore wind, transmission and vessel reports, news and downloads.

Request a 30 minute Demo

Trending News!