Brindisi
0.08 MW Decommissioned Italy
Updated weekly to include the latest news, your feedback and other data.
35 Countries, 1173 Windfarms, 7307 Stakeholders, 2711 Events, 161 Vessels, 131 Turbines NEW, 35 Ports,
Filter Projects by Country
Featured Ports
Featured Port
Port of Aalborg, Denmark Image of <%# Eval("PortName") %> Maximum Trenched Depth: 9.3 m
Entrance Width: 110 m
Spring Tidal Range: 0.3 m
Quay Length: 200 m
Quay Loading Capability: 42 tonnes/m2
Land for Development: 300 ha
More details...



Who is generating power
Who's Generating Power?
1.  United Kingdom - 1858.40 MW
2.  Denmark - 874.48 MW
3.  China - 351.00 MW
More...
Whose Turbines are Generating?
Whose Turbines are Generating?
1.  Siemens Wind Power A/S (Siemens AG) - 1522.00 MW
2.  Vestas Offshore A/S (Vestas Wind Systems A/S) - 1404.12 MW
3.  REpower Systems AG (Suzlon Energy Limited) - 250.00 MW
Loading Map
Vessels & Equipment Available for Immediate Charter
Statistics for Brindisi
Wind Farm Name Brindisi correct
CountryItaly
Region Puglia correct
SeaName Adriatic Sea correct
Centre Latitude 39.959°
Centre Longitude 18.643°
Did you know? Its easy to add a map with this windfarm to your website! More...
Round, tender or call 
Development Status Decommissioned correct
Comments on the StatusDecommissioned after concession ran out at end of 2008
Status Documentation
Capacity 0.08 MW correct
Turbine Capacity 0.08 MW correct
Number of Turbines 1 correct
Turbine Model WES18 mk1 (WES) correct
10 Year Mean Wind Speed (2000-2009) Available online now
Other wind speed data at this location: 6 hr/day/month historic data..., BERR, NERL
(Now incorporating NERL models for USA Projects!)
Weather Forecast Services Weather Solutions For Offshore Wind Power
Rotor Diameter 18 m correct
Total Turbine Height 43 m correct
Hub Height 34 m correct
Other comments Located near the site of the future Tricase project.
Foundation type is based on a modified Tension Leg Platform (TLP) Floating Prototype known as Submerged Deepwater Platform (SDP) correct
Foundation Floating: Tension Leg Platform (SDP (Submerged Deepwater Platform)) correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Area 2 km2
Water Depth Min (Chart Datum) 113 m correct
Water Depth Max (Chart Datum) 113 m correct
Depth range stated by developer correct
Distance From Shore (reported) 21.3 km correct
Distance From Shore (computed from wind farm centre) 17.1 km
Export Cable Length correct
Infield Cable Length correct
Estimated Infield Cable Length This information is available in the purchased database - please enquire.
Export Cable Capacity correct
Infield Cable Capacity correct
Number of Export Cables correct
Export Cable Type correct
Cable Description correct
Number of Offshore Substations correct
Grid Connection Point correct
Cable Landing Point correct
Annual Capacity Factor correct
Expected Life correct
Estimated Capital Cost (CapEx) This information is available in the purchased database - please enquire.
Stated Project Cost correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Port For Installation Base correct
Port For Ops and Maintenance correct
Number of homes powered annually: 45 homes
CO2 Reduced Per Year 90 tonnes
SO2 Reduced Per Year 2 tonnes
Website Visit correct

Events on Brindisi
DateTypeDescriptionSourceCorrect
2009
Event Type: Decommissioning -                                                                                                                                                                                                                                              Decommissioning -
Decommissioned early 2009 after 6 months at sea Visit correct
Jul-2008
Event Type: Operation - Generating Power                                                                                                                                                                                                                                   Operation - Generating Power
Year Generation started - summer of 2008 Visit correct
Dec-2007
Event Type: Installation - Offshore Construction Starts                                                                                                                                                                                                                    Installation - Offshore Construction Starts
Blue H built and successfully launched into the water towards the end of 2007 a large-scale 75% size prototype SDP Visit correct
02-Jan-2007
Event Type: Planning - Consent Authorised                                                                                                                                                                                                                                  Planning - Consent Authorised
In January 2007 Blue H Skysaver obtained the final authorizations to install its large scale prototype in the water. Other correct
2007
Event Type: Installation - Other                                                                                                                                                                                                                                           Installation - Other
Prototype under construction. Other correct

Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.

Be the first to comment on Brindisi offshore wind farm Please note, your comment will take 1 hour to appear.

Your Name * :  
Web Site (optional) : http://  
Comment * :  
* required


Weather Forecast for Brindisi More weather tools available on 4C Interactive Map. More weather forecast tools