Icebreaker
20 MW Concept/Early Planning United States
Updated weekly to include the latest news, your feedback and other data.
35 Countries, 1173 Windfarms, 7307 Stakeholders, 2711 Events, 161 Vessels, 131 Turbines NEW, 35 Ports,
Filter Projects by Country
12345
StatusName
Consent Authorised Cape Wind
Consent Authorised Galveston Test
Consent Authorised Offshore Wind Power Systems of Texas Titan Platform
Consent Application Submitted Rio Grande
Consent Application Submitted Rio Grande North
Concept/Early Planning Apex Offshore Wind North Carolina Phase 1
Concept/Early Planning Apex Offshore Wind North Carolina Phase 2
Concept/Early Planning Apex Virginia Offshore Wind (Virginia Call Response)
Concept/Early Planning Arcadia (Virginia Call Response)
Concept/Early Planning Arcadia Offshore (Maryland Call Response)
Concept/Early Planning Arcadia Offshore Massachusetts (Massachusetts Call Response)
Concept/Early Planning Block Island Wind Farm
Concept/Early Planning Bluewater Wind (New Jersey Call Response)
Concept/Early Planning Bluewater Wind Interim Policy Lease
Concept/Early Planning Bluewater Wind Michigan
Concept/Early Planning Bluewater Wind Rhode Island
Concept/Early Planning Boon Island
Concept/Early Planning Cirrus (Virginia Call Response)
Concept/Early Planning Cleveland Project Phase 2
Concept/Early Planning Condor Wind Energy Mass Call Response (Massachusetts Call Response(Also RFI))
Concept/Early Planning Damariscove Island
Concept/Early Planning Deepwater Wind (RI and MA Call Response)
Concept/Early Planning Deepwater Wind Interim Policy Lease
Concept/Early Planning Deepwater Wind New England (Massachusetts Call Response)
Concept/Early Planning Dominion (Virginia Call Response)
Concept/Early Planning Energy Management (Massachusetts Call Response(Also RFI))
Concept/Early Planning Energy Management (RI and MA Call Response)
Concept/Early Planning Energy Management Maryland (Maryland Call Response (Also RFI))
Concept/Early Planning enXco (RI and MA Call Response)
Concept/Early Planning enXco (Virginia Call Response)
Concept/Early Planning enXco Development Corporation (Maryland Call Response)
Concept/Early Planning enXco Development Corporation (Massachusetts Call Response)
Concept/Early Planning enXco Development Corporation (New Jersey Call Response)
Concept/Early Planning Evanston
Concept/Early Planning First State Marine Wind
Concept/Early Planning Fisherman's Energy (Virginia Call Response)
Concept/Early Planning Fishermen's Atlantic City Wind Farm Phase II
Concept/Early Planning Fishermen's Atlantic City Windfarm Phase I
Concept/Early Planning Fishermen's Energy (Maryland Call Response (Also RFI))
Concept/Early Planning Fishermen's Energy (Massachusetts Call Response(Also RFI))
12345
Featured Ports
Featured Port
Able Middlesbrough Port, United Kingdom Image of <%# Eval("PortName") %> Maximum Trenched Depth: 8.5 m
Entrance Width: 84 m
Spring Tidal Range: 4.6 m
Quay Length: 250 m
Quay Loading Capability: 25 tonnes/m2
Land for Development: 16 ha
More details...



Who is generating power
Who's Generating Power?
1.  United Kingdom - 1858.40 MW
2.  Denmark - 874.48 MW
3.  China - 351.00 MW
More...
Whose Turbines are Generating?
Whose Turbines are Generating?
1.  Siemens Wind Power A/S (Siemens AG) - 1522.00 MW
2.  Vestas Offshore A/S (Vestas Wind Systems A/S) - 1404.12 MW
3.  REpower Systems AG (Suzlon Energy Limited) - 250.00 MW
Loading Map
Vessels & Equipment Available for Immediate Charter
Statistics for Icebreaker
Wind Farm Name Icebreaker (also known as Great Lakes Wind Energy Center, LEEDCO, cleveland Pilot Wind Project) correct
CountryUnited States
Region Ohio correct
SeaName Lake Erie correct
Centre Latitude 41.608°
Centre Longitude -81.809°
Did you know? Its easy to add a map with this windfarm to your website! More...
Round, tender or call 
Development Status Concept/Early Planning correct
Comments on the StatusJurisdiction for this projects resides at the state, not federal level.
Status Documentation Details of Request For Proposals
Capacity 20 MW correct
Turbine Capacity 4.1 MW correct
Number of Turbines 5 correct
Turbine Model GE 4.1-113 (GE Energy) correct
10 Year Mean Wind Speed (2000-2009) Available online now
Other wind speed data at this location: 6 hr/day/month historic data..., BERR, NERL
(Now incorporating NERL models for USA Projects!)
Weather Forecast Services Weather Solutions For Offshore Wind Power
Rotor Diameter 113 m correct
Total Turbine Height correct
Hub Height correct
Other comments Project will have between 5-7 turbines and be 3-5 miles offshore. The project is intended to lower the cost of future wind farms in Lake Erie and the project is not expected to turn a profit. Lease renewal depends on the site being live by September 2016.
The vision is that this project will be followed by subsequent projects with a long-term goal of 1,000 megawatts distributed over several industrial projects in the Ohio waters of Lake Erie by 2020 correct
Foundation Not Decided correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Area 2 km2
Water Depth Min (Chart Datum) 16.4 m correct
Water Depth Max (Chart Datum) 18.8 m correct
Depth range stated by developer correct
Distance From Shore (reported) 7 km correct
Distance From Shore (computed from wind farm centre) 14.2 km
Export Cable Length correct
Infield Cable Length correct
Estimated Infield Cable Length This information is available in the purchased database - please enquire.
Export Cable Capacity correct
Infield Cable Capacity correct
Number of Export Cables correct
Export Cable Type correct
Cable Description correct
Number of Offshore Substations correct
Grid Connection Point correct
Cable Landing Point correct
Annual Capacity Factor correct
Expected Life correct
Estimated Capital Cost (CapEx) This information is available in the purchased database - please enquire.
Stated Project Cost USD(mill) 120.00 correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Port For Installation Base correct
Port For Ops and Maintenance correct
Number of homes powered annually: 11,183 homes
CO2 Reduced Per Year 22,601 tonnes
SO2 Reduced Per Year 526 tonnes
Website Visit correct

Events on Icebreaker
DateTypeDescriptionSourceCorrect
Subscribe
Event Type: Operation - Generating Power                                                                                                                                                                                                                                   Operation - Generating Power
Start producing power in Subscribe at the latest. Subscribe correct
Subscribe
Event Type: Installation - Offshore Construction Starts                                                                                                                                                                                                                    Installation - Offshore Construction Starts
Offshore installation is expected to start in Subscribe. Subscribe correct
Nov-2011
Event Type: Planning - Site Investigation                                                                                                                                                                                                                                  Planning - Site Investigation
Expect results of seabed mapping studies Visit correct
07-Jan-2011
Event Type: PrePlanning - Strategy Development                                                                                                                                                                                                                             PrePlanning - Strategy Development
Signed an Option-to-Lease with the State of Ohio. Have exclusive rights to apply and negotiate a final lease. Visit correct
2011
Event Type: Planning - Financing Agreement                                                                                                                                                                                                                                 Planning - Financing Agreement
An MOU with Cleveland Public Power is in place for 25% of the project output. For the remaining 75%, LEEDCo & Freshwater are partnered in on-going discussions with other utilities, municipal power systems, and PUCO. Visit correct
2011
Event Type: Planning - Other Approval                                                                                                                                                                                                                                      Planning - Other Approval
A Submerged Land Lease Option obtained. The option holds the site and allows for further geotechnical investigation to optimally site the turbines. Visit correct
Sep-2010
Event Type: Planning - Site Investigation                                                                                                                                                                                                                                  Planning - Site Investigation
Start of Lakebed Mapping and Soil Sampling Visit correct

Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.

Be the first to comment on Icebreaker offshore wind farm Please note, your comment will take 1 hour to appear.