Developers/Owners/Operators (4)

RoleOrganisation 
Developer
Beatrice Offshore Windfarm Limited
correct
Owner correct
Owner correct
Owner
Red Rock Power Limited (State Development & Investment Corporation (SDIC) (国家开发投资公司))
correct

Turbines (3)

Substations (7)

RoleOrganisation 
Installer-Substation correct
Installer-Substation
Subsea 7 (Subsea 7)
Client: LogIn
correct
Main Contractor-Onshore Substation correct
Main Contractor-Substation correct
Manufacturer-Onshore Substation correct
Manufacturer-Substation
Babcock International Group Plc
Client: LogIn
correct
Manufacturer-Substation-Electrical correct

Foundations (14)

RoleOrganisation 
Designer-Foundation(substation)
Atkins
Client: LogIn
correct
Designer-Foundation(turbine)
Atkins
Client: LogIn
correct
Main Contractor-Foundation(turbine)
Subsea 7 (Subsea 7)
Client: LogIn
correct
Main Contractor-Foundation(turbine) correct
Manufacturer-Foundation(piles)
As well as all steel pipes for the jacket foundations EEW will produce 208 piles for Seaway Heavy lifting. The piles will be produced in its Rostock and Erndtebruck plants. The piles are expected to be produced in October 2016.
Number of piles manufactured: LogIn
correct
Manufacturer-Foundation(substation)
BiFab is responsible for the manufacture of two jacket foundations and eight piles to support the offshore transformer module.
Number of foundations: LogIn
correct
Manufacturer-Foundation(turbine) correct
Manufacturer-Foundation(turbine) correct
Manufacturer-Foundation(turbine)
Smulders will be manufacturing 28 jacket foundations for the wind farm
Number of foundations: LogIn
correct
Manufacturer-Foundation-Primary Steel(turbine)
EEW will be providing all three foundation manufacturers with structural pipes for the jacket foundations. Six production centres will be used. Alongside the German plants in Erndtebrück, Rostock and Siegen, two Korean plants as well as an assembly centre in Vlissingen (the Netherlands) which has been established purely for this order will be producing steel pipes.
The first pipes started being produced in August 2016 with the first delivery planned for September 2016.

Number of foundations: LogIn
correct
Manufacturer-Foundation-Secondary Steel(turbine) correct
Supplier-Crane(Transition Piece) correct
Supplier-Crane(Transition Piece)
Granada are commissioned to design, supply, third party certify, deliver and commission 26 davit crane units for Burntisland Fabrications Limited.
correct
Supplier-Crane(Transition Piece) correct

Array Cabling (6)

RoleOrganisation 
Installer-Array Cabling correct
Main Contractor-Array Cabling
Subsea 7 (Subsea 7)
Client: LogIn
correct
Main Contractor-Array Cabling correct
Main Contractor-Array Cabling correct
Manufacturer-Array Cabling
JDR will design, manufacture and supply around 163km of 33kV inner array cables for the project. The cables will be manufactured at JDR's Hartlepool facility where they will be loaded directly on to Siem's cable lay vessel Siem Aimery.
Cable Length km: LogIn
correct
Supplier-Cable Protection Systems correct

Export Cabling (4)

RoleOrganisation 
Installer-Export Cabling correct
Main Contractor-Export Cabling correct
Manufacturer-Export Cabling correct
Manufacturer-Onshore Cabling correct

Met Masts (0)

Consultants (8)

RoleOrganisation 
Consultant-EIA correct
Consultant-Financial correct
Consultant-Other
6 Alpha Associates are managing a comprehensive unexploded ordnance risk study for the project.
correct
Consultant-Other correct
Consultant-Other correct
Consultant-Other
Technical due diligence, focusing on schedule and construction risk
for a potential investor.
correct
Consultant-Project Management
SgurrEnergy Ltd
correct
Contractor-Marine Coordinator correct

Others (26)

RoleOrganisation 
Contractor-Other
Danske Commodities
Danske Commodities have signed a 15-year Power Purchase Agreement (PPA) for the wind farm. Under the agreement, Danske Commodities will handle all forecasting and trading for 294 MW, equivalent to 50% of the park’s production.
correct
Designer-FEED
Provided Advanced FEED packages including coupled analysis with Siemens Wind Power, clustering strategy and grouted connection design.
correct
Investor correct
Port correct
Project Management-Other correct
Project Management-Other correct
Supplier-Helicopter
NHV UK
Client: LogIn
correct
Supplier-Hydraulic Hammer
IHC IQIP will provide the Hydrohammer S-2500 for Seaway to use.
Number of piles driven in - Not number of foundations: LogIn
correct
Supplier-Navigation Aids
Pharos Marine ltd
Client: LogIn
Manufactured navigational aids between 2006-2007.
correct
Supplier-Other
Seatools BV
Client: LogIn
correct
Supplier-Other correct
Supplier-Other correct
Supplier-Other correct
Surveyor-Bird
Performed bird and mammal surveys.
correct
Surveyor-Geophysical correct
Surveyor-Geophysical
Provided full geophysical surveys.
Value: LogIn
correct
Surveyor-Geophysical correct
Surveyor-Geotechnical correct
Surveyor-Maritime Traffic and Navigation Risk
Performed a Navigation Risk Assessment.
correct
Surveyor-Metocean correct
Surveyor-Metocean
Partrac Ltd
Client: LogIn
Metocean surveys for the Beatrice Scottish Territorial Waters site. Period: 2009
correct
Surveyor-Other correct
Surveyor-Other correct
Surveyor-Other correct
Surveyor-Other correct
Surveyor-Other
Aberdeen University
Client: LogIn
Aberdeen University carried out a four study of dolphins and purpoises in the area.
correct

Call +44 (0)1502 307 037 for more information

Keep on top of the market. Perform analysis. Make informed decisions.

CONTACT US

Did you know?

You get monthly updates with our Offshore Windfarm Subscription and receive even more detailed information about: turbines costs foundations substations converters cabling

Filter :
123
StatusName
Decommissioned Beatrice Demonstration Beatrice Demonstration
Decommissioned Blyth Blyth
Fully Commissioned Barrow Barrow
Fully Commissioned Burbo Bank Burbo Bank
Fully Commissioned Greater Gabbard Greater Gabbard
Fully Commissioned Gunfleet Sands Gunfleet Sands
Fully Commissioned Gunfleet Sands 3 - Demonstration Project Gunfleet Sands 3 - Demonstration Project
Fully Commissioned Gwynt y Môr Gwynt y Môr
Fully Commissioned Humber Gateway Humber Gateway
Fully Commissioned Hunterston Test Centre - Mitsubishi 7MW (onshore) Hunterston Test Centre - Mitsubishi 7MW (onshore)
Fully Commissioned Hunterston Test Centre - Siemens 6MW (onshore) Hunterston Test Centre - Siemens 6MW (onshore)
Fully Commissioned Hunterston Test Centre (onshore) Hunterston Test Centre (onshore)
Fully Commissioned Inner Dowsing Inner Dowsing
Fully Commissioned Kentish Flats Kentish Flats
Fully Commissioned Kentish Flats Extension Kentish Flats Extension
Fully Commissioned Levenmouth demonstration turbine Levenmouth demonstration turbine
Fully Commissioned Lincs Lincs
Fully Commissioned London Array London Array
Fully Commissioned Lynn Lynn
Fully Commissioned North Hoyle North Hoyle
Fully Commissioned Ormonde Ormonde
Fully Commissioned Rhyl Flats Rhyl Flats
Fully Commissioned Robin Rigg Robin Rigg
Fully Commissioned Scroby Sands Scroby Sands
Fully Commissioned Sheringham Shoal Sheringham Shoal
Fully Commissioned Teesside Teesside
Fully Commissioned Thanet Thanet
Fully Commissioned Walney Phase 1 Walney Phase 1
Fully Commissioned Walney Phase 2 Walney Phase 2
Fully Commissioned Wave Hub Wave Hub
Fully Commissioned West of Duddon Sands West of Duddon Sands
Fully Commissioned Westermost Rough Westermost Rough
Partial Generation/Under Construction Burbo Bank Extension Burbo Bank Extension
Partial Generation/Under Construction Dudgeon Dudgeon
Under Construction Galloper Galloper
Under Construction Race Bank Race Bank
Under Construction Rampion Rampion
Pre-Construction Aberdeen Offshore Wind Farm (EOWDC) Aberdeen Offshore Wind Farm (EOWDC)
Pre-Construction Beatrice Beatrice
Pre-Construction Blyth Offshore Demonstrator Project - Array 2 Blyth Offshore Demonstrator Project - Array 2
Pre-Construction East Anglia ONE East Anglia ONE
Pre-Construction Hornsea Project One Hornsea Project One
Pre-Construction Hywind Scotland Pilot Park Hywind Scotland Pilot Park
Pre-Construction Walney Extension Walney Extension
Consent Authorised Blyth Offshore Demonstrator Project - Array 3A & 4 Blyth Offshore Demonstrator Project - Array 3A & 4
Consent Authorised Dogger Bank - Creyke Beck A Dogger Bank - Creyke Beck A
Consent Authorised Dogger Bank - Creyke Beck B Dogger Bank - Creyke Beck B
Consent Authorised Dogger Bank - Teesside A Dogger Bank - Teesside A
Consent Authorised Dogger Bank - Teesside B Dogger Bank - Teesside B
Consent Authorised Dounreay Trì Dounreay Trì
123
Please LogIn to follow projects
Find quick and easy project and company information with our online search tool

This page is intended to be viewed online and may not be printed without a valid subscription.

Please view this page at http://www.4coffshore.com/windfarms/organisations.aspx?windfarmID=uk53.