Developers/Owners/Operators (4)

Turbines (2)

Substations (5)

RoleOrganisation 
Designer-Substation
Babcock International Group Plc
Client: LogIn
correct
Main Contractor-Substation
Babcock International Group Plc
Client: LogIn
correct
Manufacturer-Onshore Substation
ABB A/S
Client: LogIn
correct
Manufacturer-Substation-Electrical
ABB A/S
Client: LogIn
correct
Manufacturer-Substation-Topside
Babcock International Group Plc
correct

Foundations (8)

RoleOrganisation 
Designer(Detailed)-Foundation(Turbine) correct
Installer-Foundation(turbine) correct
Manufacturer-Foundation(substation) correct
Manufacturer-Foundation(substation)
Babcock International Group Plc
Client: LogIn
correct
Manufacturer-Foundation(turbine) correct
Manufacturer-Transition Piece(turbine) correct
Supplier-Crane(Transition Piece)
Palfinger Marine- und Beteilungs-GmbH
correct
Supplier-Flanges
Euskal provided the flanges for the foundations. The project consisted of 3 types of flanges, The scope of the project consists in 3 type of flanges (Top and Bottom transition piece and monopile) starting at 5.000mm of external diameter and finished machined for each of the 116 foundations that will be installed off the Sussex coast in the UK. Under the term of the contract, Euskal Forging will roll, heat treat, machine and deliver to the client 348 flanges adapting the production to the customer needs, following Euskal Forging´s flexible manufacturing set up.
correct

Array Cabling (5)

RoleOrganisation 
Installer-Array Cable (Jointing/Termination) correct
Installer-Array Cabling correct
Manufacturer-Array Cabling correct
Supplier-Cable Protection Systems
Supply the TekLink cable protection system for the cabling.
correct
Supplier-Installation Equipment (Array Cable) correct

Export Cabling (4)

RoleOrganisation 
Installer-Export Cabling correct
Installer-Export Cabling(Horizontal Directional Drill)
VolkraInfra contracted to undertake Horizontal Directional Drilling. The works comprise of onshore major horizontal directional drills (HDDs) - under the A27, a railway crossing, the A283 and River Adur.
correct
Main Contractor-Onshore Cabling correct
Manufacturer-Export Cabling correct

Met Masts (8)

RoleOrganisation 
Designer-Met Mast
Atkins
Client: LogIn
correct
Installer(LEAD)-Met Mast correct
Main Contractor-Met Mast correct
Manufacturer-Foundation(metmast) correct
Manufacturer-Met Mast(Tower)
Supply of 93m Lattice Met Mast tower - height measured from platform to hub height anemometers (Lattice structure of 91m + 2m top head frame)
correct
Manufacturer-Transition Piece-Met Mast correct
Supplier-MetOcean Equipment correct
Supplier-MetOcean Equipment correct

Consultants (7)

RoleOrganisation 
Consultant-Certification
GoBe Consultants Ltd
correct
Consultant-EIA correct
Consultant-Other
GDG completed geotechnical interpretation for the Rampion offshore wind project. GDG undertook detailed geotechnical interpretation for the turbine monopile locations. They also assisted LicEnergy in site verification and monopile design optimisation.
correct
Consultant-Other correct
Consultant-Other correct
Consultant-Other
Vysiion
Client: LogIn
correct
Consultant-Other correct

Others (19)

RoleOrganisation 
Contractor-Other
Aertssen Kranen NV
Provided load in of the monopile sections and the load out of the completed monopiles for Verbrugge Terminals, between July 2015 - August 2016.
correct
Contractor-Other correct
Contractor-Other correct
Investor correct
Supplier-Hydraulic Hammer
S-800 Hydrohammer
Pile Diameter - 2.5m
Year - 2012
Met Mast Monopile

Number of piles driven in - Not number of foundations: LogIn
correct
Supplier-Other
E.ON awarded JECS Offshore a framework agreement to supply scaffolding access solutions for the project.
correct
Supplier-Other
Supplying the cathodic protection (by means of aluminum sacrificial anodes) for all 116 monopiles of the OWF Rampion.
correct
Supplier-Other
MC CONSTRUCTION (CLEVELAND) LTG
Client: LogIn
Fabrication and mobilisation of foundation sea fasteners including hydraulically operated monopile upending cradle for the MPI Discovery. The contract took place between September 2015 and January 2016.
correct
Supplier-Other correct
Supplier-Other correct
Supplier-Other
MC CONSTRUCTION (CLEVELAND) LTG
Client: LogIn
Fabrication and mobilisation of foundation sea fasteners and fabrication and installation of the Houlder pile gripper grillage for the Pacific Orca.
correct
Supplier-Other correct
Surveyor-Bird correct
Surveyor-Geophysical
Provided full geophysical surveys, the MV Chartwell was used in this process.
Value: LogIn
correct
Surveyor-Geotechnical correct
Surveyor-Maritime Traffic and Navigation Risk
Shipping and Navigation Services
correct
Surveyor-Other correct
Surveyor-UXO correct
Surveyor-UXO
The EGS Pioneer performed an UXO Survey at the site. The works lasted 2-3 months.
correct

Call +44 (0)1502 307 037 for more information

Keep on top of the market. Perform analysis. Make informed decisions.

CONTACT US

Did you know?

You get monthly updates with our Offshore Windfarm Subscription and receive even more detailed information about: turbines costs foundations substations converters cabling

Filter :
123
StatusName
Decommissioned Beatrice Demonstration Beatrice Demonstration
Decommissioned Blyth Blyth
Fully Commissioned Barrow Barrow
Fully Commissioned Burbo Bank Burbo Bank
Fully Commissioned Greater Gabbard Greater Gabbard
Fully Commissioned Gunfleet Sands Gunfleet Sands
Fully Commissioned Gunfleet Sands 3 - Demonstration Project Gunfleet Sands 3 - Demonstration Project
Fully Commissioned Gwynt y Môr Gwynt y Môr
Fully Commissioned Humber Gateway Humber Gateway
Fully Commissioned Hunterston Test Centre - Mitsubishi 7MW (onshore) Hunterston Test Centre - Mitsubishi 7MW (onshore)
Fully Commissioned Hunterston Test Centre - Siemens 6MW (onshore) Hunterston Test Centre - Siemens 6MW (onshore)
Fully Commissioned Hunterston Test Centre (onshore) Hunterston Test Centre (onshore)
Fully Commissioned Inner Dowsing Inner Dowsing
Fully Commissioned Kentish Flats Kentish Flats
Fully Commissioned Kentish Flats Extension Kentish Flats Extension
Fully Commissioned Levenmouth demonstration turbine Levenmouth demonstration turbine
Fully Commissioned Lincs Lincs
Fully Commissioned London Array London Array
Fully Commissioned Lynn Lynn
Fully Commissioned North Hoyle North Hoyle
Fully Commissioned Ormonde Ormonde
Fully Commissioned Rhyl Flats Rhyl Flats
Fully Commissioned Robin Rigg Robin Rigg
Fully Commissioned Scroby Sands Scroby Sands
Fully Commissioned Sheringham Shoal Sheringham Shoal
Fully Commissioned Teesside Teesside
Fully Commissioned Thanet Thanet
Fully Commissioned Walney Phase 1 Walney Phase 1
Fully Commissioned Walney Phase 2 Walney Phase 2
Fully Commissioned Wave Hub Wave Hub
Fully Commissioned West of Duddon Sands West of Duddon Sands
Fully Commissioned Westermost Rough Westermost Rough
Partial Generation/Under Construction Burbo Bank Extension Burbo Bank Extension
Partial Generation/Under Construction Dudgeon Dudgeon
Under Construction Beatrice Beatrice
Under Construction Galloper Galloper
Under Construction Race Bank Race Bank
Under Construction Rampion Rampion
Pre-Construction Aberdeen Offshore Wind Farm (EOWDC) Aberdeen Offshore Wind Farm (EOWDC)
Pre-Construction Blyth Offshore Demonstrator Project - Array 2 Blyth Offshore Demonstrator Project - Array 2
Pre-Construction East Anglia ONE East Anglia ONE
Pre-Construction Hornsea Project One Hornsea Project One
Pre-Construction Hywind Scotland Pilot Park Hywind Scotland Pilot Park
Pre-Construction Walney Extension Walney Extension
Consent Authorised Blyth Offshore Demonstrator Project - Array 3A & 4 Blyth Offshore Demonstrator Project - Array 3A & 4
Consent Authorised Dogger Bank - Creyke Beck A Dogger Bank - Creyke Beck A
Consent Authorised Dogger Bank - Creyke Beck B Dogger Bank - Creyke Beck B
Consent Authorised Dogger Bank - Teesside A Dogger Bank - Teesside A
Consent Authorised Dogger Bank - Teesside B Dogger Bank - Teesside B
Consent Authorised Dounreay Trì Dounreay Trì
123
Please LogIn to follow projects
Find quick and easy project and company information with our online search tool

This page is intended to be viewed online and may not be printed without a valid subscription.

Please view this page at http://www.4coffshore.com/windfarms/organisations.aspx?windfarmID=uk36.