01 Apr 2024: Update (February 2024): Offshore construction is expected to start in Q2 2024. Orsted is focussed on keeping monopiles and vessels timely. 20% of the monopiles for Revolution Wind are delivered by the same European supplier who has the ramp-up challenges in the German Programme [Bladt]. It is prioritising monopiles for the offshore substation to ensure timely power to shore. Jack up Scylla has been brought in along with a Jones-Act compliant barge. Previous: Offshore construction is due to start in 2024. This is unlikely to include foundation installation until 2025.
Location:
United States
Status:
Pre-Construction
Capacity:
704 MW
4C Offshore | Location Map: Lat(41.154) Lon(-71.080)

Subscribers can track wind farms on their dashboard.

General Information
Name
Revolution Wind
Other Names
Lease OCS-A 0486, Deepwater Wind Energy Center (DWEC); Revolution Wind 1
Country
United States
Development Status
Pre-Construction
Category or Round
Unlock with a freemium account
Region
Unlock with a freemium account
Comments
Unlock with a freemium account
Website
Unlock with a freemium account

Developers/Owners/Operators
Type
Organisation

Developer

Ørsted US Offshore Wind (formerly Deepwater Wind LLC)

Ørsted US Offshore Wind (formerly Deepwater Wind LLC)

Operator

Ørsted US Offshore Wind

Ørsted US Offshore Wind

Owner

Ørsted US Offshore Wind (formerly Deepwater Wind LLC)

Ørsted US Offshore Wind (formerly Deepwater Wind LLC)

Owner

Eversource Energy

Eversource Energy


Offshore Construction Starts
Submitted For Consent
Consent Authorised
Financial Close
First Power
Full Commissioning
Unlock with a freemium account

Revenue Mechanism
Revenue Details
Revenue
USD 98.89/MWh (EUR 90.39/MWh)

How does the database work?

4C Offshore marine intelligence software provides you with exclusive access to a range of specialised services including the Global Offshore Wind Farm Database. 4C Offshore grants you exclusive access to online and offline databases, reports, newsletters, online tools and more.

There are three levels of access: Free, Freemium and Full. Freemium allows you to personalise notifications, use the search function and access more data.

You will need Full access to use the 4C Offshore interactive system, access reports, updates, news, downloads and more. To find out more about how 4C Offshore software works and the benefits of Full access, enquire below.

Sign up to Freemium Enquire about 4C Offshore
Power & Turbines
Windfarm Capacity
704 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
North Atlantic Ocean
Latitude
41.153925°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
2
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
1
Average Length per Cable
Comments
Expected Life