Den Haag II
255 MW Dormant Netherlands
Updated weekly to include the latest news, your feedback and other data.
35 Countries, 1173 Windfarms, 7307 Stakeholders, 2711 Events, 161 Vessels, 131 Turbines NEW, 35 Ports,
Filter Projects by Country
Featured Ports
Featured Port
Port of Wilhelmshaven, Germany Image of <%# Eval("PortName") %> Maximum Trenched Depth: 18 m
Entrance Width: 60 m
Spring Tidal Range: 3.5 m
Quay Length: 5377 m
Quay Loading Capability: 84 tonnes/m2
Land for Development: 59 ha
More details...



Who is generating power
Who's Generating Power?
1.  United Kingdom - 1858.40 MW
2.  Denmark - 874.48 MW
3.  China - 351.00 MW
More...
Whose Turbines are Generating?
Whose Turbines are Generating?
1.  Siemens Wind Power A/S (Siemens AG) - 1522.00 MW
2.  Vestas Offshore A/S (Vestas Wind Systems A/S) - 1404.12 MW
3.  REpower Systems AG (Suzlon Energy Limited) - 250.00 MW
Loading Map
RoleOrganisationDescription 
Developer WEOM Weom initially owned by Shell and Nuon correct
Owner Nuon (Vattenfall AB)
Percentage: Subscribe
correct
Vessels & Equipment Available for Immediate Charter
Statistics for Den Haag II
Wind Farm Name Den Haag II (also known as 6 (ID assigned by authority)) correct
CountryNetherlands
Region Zuid-Holland correct
SeaName North Sea correct
Centre Latitude 52.126°
Centre Longitude 3.401°
Did you know? Its easy to add a map with this windfarm to your website! More...
Round, tender or call 
Development Status Dormant correct
Comments on the StatusNot included in current approval process.(04/10/2007 - Draft refusal due to negative effect on the safety of shipping)
Status Documentation This is the Draft Decision Document
Capacity 255 MW correct
Turbine Capacity 3 MW correct
Number of Turbines 85 correct
Turbine Model Not Decided correct
10 Year Mean Wind Speed (2000-2009) Available online now
Other wind speed data at this location: 6 hr/day/month historic data..., BERR, NERL
(Now incorporating NERL models for USA Projects!)
Weather Forecast Services Weather Solutions For Offshore Wind Power
Rotor Diameter 90 m correct
Total Turbine Height 115 m correct
Hub Height 70 m correct
Other comments correct
Foundation Grounded: Monopile correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Area 35 km2
Water Depth Min (Chart Datum) 24 m correct
Water Depth Max (Chart Datum) 35 m correct
Depth range stated by developer correct
Distance From Shore (reported) 42 km correct
Distance From Shore (computed from wind farm centre) 45.4 km
Export Cable Length correct
Infield Cable Length correct
Estimated Infield Cable Length This information is available in the purchased database - please enquire.
Export Cable Capacity 150 kV correct
Infield Cable Capacity correct
Number of Export Cables correct
Export Cable Type correct
Cable Description correct
Number of Offshore Substations 1 correct
Grid Connection Point correct
Cable Landing Point Maasvlakte or IJmuiden correct
Annual Capacity Factor correct
Expected Life correct
Estimated Capital Cost (CapEx) This information is available in the purchased database - please enquire.
Stated Project Cost correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Port For Installation Base correct
Port For Ops and Maintenance correct
Number of homes powered annually: 142,583 homes
CO2 Reduced Per Year 288,160 tonnes
SO2 Reduced Per Year 6,701 tonnes
Website No Website correct

Events on Den Haag II
DateTypeDescriptionSourceCorrect
04-Oct-2007
Event Type: Planning - Consent Application Declined                                                                                                                                                                                                                        Planning - Consent Application Declined
Draft refusal - Due to negative effect on the safety of shipping Visit correct
22-May-2006
Event Type: Planning - Consent Application Submitted                                                                                                                                                                                                                       Planning - Consent Application Submitted
Consent Application Submitted Visit correct

Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.

Be the first to comment on Den Haag II offshore wind farm Please note, your comment will take 1 hour to appear.

Your Name * :  
Web Site (optional) : http://  
Comment * :  
* required


Weather Forecast for Den Haag II More weather tools available on 4C Interactive Map. More weather forecast tools