Deux Cotes
700 MW Failed Proposal France
Updated weekly to include the latest news, your feedback and other data.
35 Countries, 1173 Windfarms, 7307 Stakeholders, 2711 Events, 161 Vessels, 131 Turbines NEW, 35 Ports,
Filter Projects by Country
Featured Ports
Featured Port
Vlissingen - Verbrugge Terminals, The Netherlands Image of <%# Eval("PortName") %> Maximum Trenched Depth: 13.3 m
Entrance Width: 372 m
Spring Tidal Range: 5 m
Quay Length: 1200 m
Quay Loading Capability: 15 tonnes/m2
Land for Development: 70 ha
More details...



Who is generating power
Who's Generating Power?
1.  United Kingdom - 1858.40 MW
2.  Denmark - 874.48 MW
3.  China - 351.00 MW
More...
Whose Turbines are Generating?
Whose Turbines are Generating?
1.  Siemens Wind Power A/S (Siemens AG) - 1522.00 MW
2.  Vestas Offshore A/S (Vestas Wind Systems A/S) - 1404.12 MW
3.  REpower Systems AG (Suzlon Energy Limited) - 250.00 MW
Loading Map
Vessels & Equipment Available for Immediate Charter
Statistics for Deux Cotes
Wind Farm Name Deux Cotes correct
CountryFrance
Region Haute-Normandie correct
SeaName English Channel correct
Centre Latitude 50.147°
Centre Longitude 1.151°
Did you know? Its easy to add a map with this windfarm to your website! More...
Round, tender or call2011 Tender
Development Status Failed Proposal correct
Comments on the Status 
Status Documentation
Capacity 700 MW correct
Turbine Capacity 5 MW correct
Number of Turbines 140 correct
Turbine Model M5000-116 (Areva Wind) correct
10 Year Mean Wind Speed (2000-2009) Available online now
Other wind speed data at this location: 6 hr/day/month historic data..., BERR, NERL
(Now incorporating NERL models for USA Projects!)
Weather Forecast Services Weather Solutions For Offshore Wind Power
Rotor Diameter 116 m correct
Total Turbine Height 145 m correct
Hub Height 87 m correct
Other comments Phase 1 will consist of 47 turbines. correct
Foundation Not Decided correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Area 86 km2
Water Depth Min (Chart Datum) 9 m correct
Water Depth Max (Chart Datum) 24 m correct
Depth range stated by developer correct
Distance From Shore (reported) 18 km correct
Distance From Shore (computed from wind farm centre) 17.5 km
Export Cable Length correct
Infield Cable Length correct
Estimated Infield Cable Length This information is available in the purchased database - please enquire.
Export Cable Capacity correct
Infield Cable Capacity correct
Number of Export Cables correct
Export Cable Type correct
Cable Description correct
Number of Offshore Substations 1 correct
Grid Connection Point Penly correct
Cable Landing Point Penly correct
Annual Capacity Factor correct
Expected Life correct
Estimated Capital Cost (CapEx) This information is available in the purchased database - please enquire.
Stated Project Cost EUR(mill) 1800.00 correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Port For Installation Base correct
Port For Ops and Maintenance correct
Number of homes powered annually: 391,404 homes
CO2 Reduced Per Year 791,028 tonnes
SO2 Reduced Per Year 18,396 tonnes
Website Visit correct

Events on Deux Cotes
DateTypeDescriptionSourceCorrect
Apr-2015
Event Type: Planning - Consent Authorised                                                                                                                                                                                                                                  Planning - Consent Authorised
Authorities to grant concession to enable the operator to use the States property ("Concession d’utilisation du domaine public maritime") Visit correct
Subscribe
Event Type: Installation - Offshore Construction Starts                                                                                                                                                                                                                    Installation - Offshore Construction Starts
Construction to start from Subscribe Subscribe correct
Oct-2014
Event Type: Planning - Consent Application Submitted                                                                                                                                                                                                                       Planning - Consent Application Submitted
Must submit request to authorities for authorization to occupy the maritime public domain in accordance with article L.2124-3 of the Code général de la propriété des personnes publiques Visit correct
Jul-2011
Event Type: Installation - Met Mast                                                                                                                                                                                                                                        Installation - Met Mast
Predicted date for Met mast installation. Other correct

Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.

Be the first to comment on Deux Cotes offshore wind farm Please note, your comment will take 1 hour to appear.

Your Name * :  
Web Site (optional) : http://  
Comment * :  
* required


Weather Forecast for Deux Cotes More weather tools available on 4C Interactive Map. More weather forecast tools