Anholt
399.6 MW
Updated weekly to include the latest news, your feedback and other data.
38
Countries,
1317
Windfarms
,
9090
Stakeholders,
4282
Events,
824
Vessels
,
153
Turbines
NEW
,
42
Ports
,
Subscribe!
Filter Projects by Country
Albania
Australia
Azerbaijan
Bangladesh
Belgium
Brazil
Canada
China
Croatia
Denmark
Estonia
Finland
France
Germany
Greece
India
Ireland
Italy
Japan
Latvia
Lithuania
Maldives
Malta
Netherlands
Norway
Poland
Portugal
Romania
Russia
South Korea
Spain
Sri Lanka
Sweden
Taiwan
Tunisia
United Kingdom
United States
Vietnam
1
2
Status
Name
Avedøre Holme
Frederikshavn
Horns Rev 1
Horns Rev 2
Middelgrunden
Nysted
Poseidon
Rødsand 2
Rønland
Samsø
Sprogø
Tunø Knob
Vindeby
Anholt
NearshoreLAB
DanTysk DK
Horns Rev 3
Kriegers Flak
Mejlflak
Nissum Bredning
Pilot Projects
Rønland III
Rønne Bakke
Bornholm
Horns Rev A HR5
Horns Rev B HR6
Horns Rev B HR7
Horns Rev Reserved Area
Jammerbugt A J3
Jammerbugt A J4
Jammerbugt B J1
Jammerbugt B J2
Jammerbugt Reserved Area
Kriegers Flak B K1
Kriegers Flak Reserved Area
Ringkøbing Fjord A RK1
Ringkøbing Fjord A RK2
Ringkøbing Fjord B RK3
Ringkøbing Fjord B RK4
Ringkøbing Fjord C RK5
1
2
Featured Port
Newhaven - Fendercare Marine, United Kingdom
Maximum Trenched Depth:
Entrance Width: 55 m
Spring Tidal Range: 6.6 m
Quay Length: 330 m
Quay Loading Capability: 90 tonnes/m
2
Land for Development: 14 ha
More details...
Offshore Wind Ports
Aalborg Port
Able Humber Port
Able Middlesbrough Port
Able Seaton Port
BOW Terminal Vlissingen
EastPort UK
Great Yarmouth - Fendercare Marine Equipment & Lifting Services
Harwich Navyard
Lyness - Fendercare Marine
Newhaven - Fendercare Marine
Port of Wilhelmshaven
Rebo terminal, port of Oostende
Rønne Havn
Vlissingen - Verbrugge Terminals
More ports...
Who's Generating Power?
1.
United Kingdom
-
3321.2000 MW
2.
Denmark
-
871.4800 MW
3.
China
-
559.5000 MW
More...
Whose Turbines are Generating?
1.
Siemens Wind Power A/S (Siemens AG)
-
3084.8000 MW
2.
Vestas Offshore A/S (Vestas Wind Systems A/S)
-
1401.1200 MW
3.
REpower Systems AG (Suzlon Energy Limited)
-
434.5000 MW
Subscribe!
This is the 1st latest news item.
This is the 2nd latest news item.
This is the 3rd latest news item.
This is the 4th latest news item.
Developers/Owners/Operators
Database as Excel
|
Add Your Organisation
|
Check Your 4C Entries
Role
Organisation
Description
Developer
DONG Energy - Anholt Offshore A/S
(DONG Energy)
Awarded the concession to build the wind farm by the Danish Energy Agency.
Operator
DONG Energy - Anholt Offshore A/S
(DONG Energy)
Owner
DONG Energy
Owns 50%.
Percentage:
Subscribe
Owner
Pensionskassernes Administration (PKA) A/S
Owns 20% of the project. On 01/04/2014 take over responsibility of for operation and earnings in proportion of its investment.
Value:
Subscribe
Percentage:
Subscribe
Owner
PensionDanmark
Owns 30% of the project. On 01/04/2014 take over responsibility of for operation and earnings in proportion of its investment.
Value:
Subscribe
Percentage:
Subscribe
Click here to view the Supply Chain!
Click here to view all Vessels!
Equipment Available for Charter
Statistics for Anholt
Database in Excel
General Information
Name
Anholt
Other names
Djursland Anholt
Country name
Denmark
Region
Nørre Djurs
Comments
Dong Energy A/S was the only bidder for the wind farm.
Round (or category)
Tender (DK)
Development status
Partial Generation/Under Construction
Comments on the status
For latest status please see events table.
Power & Turbines
Notice any Errors?
You can keep this an open resource by submitting corrections!
Project Capacity
399.6 MW
Turbine Model
SWT-3.6-120 (Siemens)
Turbine Capacity
3.6 MW
Number of Turbines
111
Total Turbine Height
141.6 m
Hub Height
81.60 m
Rotor Diameter
120 m
Foundation
Grounded: Monopile
Download Database for Excel
Windspeed
10 Year Mean Wind Speed (2000-2009)
Available online now
Detailed wind speed data
6 hr/day/month historic data
Costs
Stated Project Cost
DKK(mill) 10000.00
Location & Environment
Sea name
Kattegat
Centre latitude
56.603°
Centre longitude
11.209°
Area
145 km
2
Depth range (Chart Datum)
14 m - 17 m
Depth range stated by developer
15 m - 19 m
Distance From Shore (reported)
15 km
Distance From Shore (computed from centre)
23 km
Ports
Installation base
Grenaa Harbour
Ops and maintenance
Grenaa Harbour
Grid
Converter platforms
None
Offshore transformers
Anholt Substation
Grid connection point
Trige
Cable landing point
Saltbækken, Grenaa
Export Cables
Please note that export cables connect the offshore transformer (substation) to either; shore or an offshore HVAC-HVDC converter station for onward transmission via HVDC cabling. Please see the
converters page
for planned converter stations and transmission cables.
The export cable length does not generally include the onshore component. The exception is when the onshore substation is close to shore.
Number of Export Cables
1
Average length per cable
24.5 km
Transmission type (e.g. HVAC)
HVAC
Nominal voltage
220 kV
Maximum voltage
245 kV
Power rating
Number of cores
3
Conductor type
Al
Section
1600 mm
2
Insulation
Number fibre optics
Minimum bend radius (MBR)
Burial depth
Comments
Onshore Cables
(new)
Number of onshore cables
Average length per cable
56 km
Comments
Array Cables
Array cable length
150 km
Estimated cable length
In purchased database
Transmission type (e.g. MVAC)
MVAC
Nominal voltage
36 kV
Maximum voltage
Burial depth
Number of cores
Conductor type
Section
500 mm
2
Insulation
Power rating
Number of fibre optics
Minimum bend radius (MBR)
Comments
Benefits
Homes powered annually
223436
CO
2
reduced per year
451564 tonnes
SO
2
reduced per year
10501 tonnes
Expected life
Other
Website
Visit
Events on Anholt
Database in Excel
1
2
3
4
5
Date
Type
Description
Source
Correct
Subscribe
Unknown
The inauguration will be held on this date in attendance will be Her Majesty The Queen and His Royal Highness The Prince Consort.
Subscribe
Subscribe
Operation - Fully Commissioned
Estimated date for full commissioning. The wind farm must be fully commissioned by the end of
Subscribe
, otherwise the tariff will be reduced and a penalty will be applied. As part of the offshore infrastructure, the Island of Anholt will be connected to the main land grid for the first time. Previously the island was dependent on generators for electricity supply.
Subscribe
30-Apr-2013
Installation - Turbine Installation
Turbine Installation: 97 turbines have been installed and 14 ready to be installed. Power: 59 turbines are connected to the grid. Number of turbines installted by vessel: Sea Power 39, Sea Worker 31, Sea Installer 14 and Sea Jack 13. The Sea Installer and the Sea Jack have now left the project.
Visit
31-Mar-2013
Installation - Turbine Installation
At the end of March 2013 75 turbines were installed, 68 were connected to the grid and 39 were producing electricity. During this month the 36th turbine that produced power meant that Denmark reached a total of 1GW of offshore wind power.
Visit
18-Mar-2013
Operation - Generating Power
The 36th turbine was connected to the grid and with that Denmark reached 1GW of offshore wind energy.
Visit
06-Mar-2013
Installation - Turbine Installation
Half of the turbines were installed with the 56th of 111 being installed.
Visit
28-Feb-2013
Installation - Turbine Installation
Construction update: 48 turbines installed, of those 44 are connected to the grid and 30 are producing power.
Visit
19-Feb-2013
Installation - Cable installation
The flushing of the array cables was completed on the site. However at some positions the cables couldn't be flushed to the required depth therefore rock dumping will occur during the summer.
Visit
15-Feb-2013
Installation - Turbine Installation
Construction Update - SEA POWER, SEA WORKER and SEA JACK have finished installation of 36 wind turbines and continue to install.
Visit
04-Feb-2013
Installation - Turbine Installation
Construction Update: SEA POWER has now finished the installation of 22 wind turbines. She has now been joined by SEA WORKER and SEA JACK, which are aiding turbine installation.
Visit
1
2
3
4
5
Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.
Comments on Anholt offshore wind farm
Please note,
your comment will take 1 hour to appear
.
Your Name *
:
Please provide your name
Web Site (optional)
:
http://
Invalid website (omit http://)
Comment *
:
Please provide a comment
* required
Added:
Mon, 24 Jan 2011 14:20:00 GMT
Oestship is your local contact in Grenaa in relation to marine related services incl. a 24/7 setup for stevedoring, port agency, storage, office facilities and accommodation during project. Please visit us at www.oestship.dk for more details. On 01st January 2011 Oestship became a member of the Blue Water Shipping Group - pls. see more on www.bws.dk
Jacob Kjærgaard
<< Newer Comments
Older Comments >>