Anholt
399.6 MW Partial Generation/Under Construction Denmark
Updated weekly to include the latest news, your feedback and other data.
38 Countries, 1317 Windfarms, 9090 Stakeholders, 4282 Events, 824 Vessels, 153 Turbines NEW, 42 Ports,
Filter Projects by Country
Featured Ports
Featured Port
Newhaven - Fendercare Marine, United Kingdom Image of <%# Eval("PortName") %> Maximum Trenched Depth:
Entrance Width: 55 m
Spring Tidal Range: 6.6 m
Quay Length: 330 m
Quay Loading Capability: 90 tonnes/m2
Land for Development: 14 ha
More details...



Who is generating power
Who's Generating Power?
1.  United Kingdom - 3321.2000 MW
2.  Denmark - 871.4800 MW
3.  China - 559.5000 MW
More...
Whose Turbines are Generating?
Whose Turbines are Generating?
1.  Siemens Wind Power A/S (Siemens AG) - 3084.8000 MW
2.  Vestas Offshore A/S (Vestas Wind Systems A/S) - 1401.1200 MW
3.  REpower Systems AG (Suzlon Energy Limited) - 434.5000 MW
Loading Map
Equipment Available for Charter
Statistics for Anholt
General Information Name Anholt correct
Other names Djursland Anholt correct
Country name Denmark correct
Region Nørre Djurs correct
Comments Dong Energy A/S was the only bidder for the wind farm. correct
Round (or category) Tender (DK) correct
Development status Partial Generation/Under Construction correct
Comments on the status For latest status please see events table. correct
Power & Turbines Notice any Errors? You can keep this an open resource by submitting corrections!
Project Capacity 399.6 MW correct
Turbine Model SWT-3.6-120 (Siemens) correct
Turbine Capacity 3.6 MW correct
Number of Turbines 111 correct
Total Turbine Height 141.6 m correct
Hub Height 81.60 m correct
Rotor Diameter 120 m correct
Foundation Grounded: Monopile correct
Windspeed 10 Year Mean Wind Speed (2000-2009) Available online now
Detailed wind speed data 6 hr/day/month historic data
Costs Stated Project Cost DKK(mill) 10000.00 correct
Location & Environment Sea name Kattegat correct
Centre latitude 56.603° correct
Centre longitude 11.209° correct
Area 145 km2 correct
Depth range (Chart Datum) 14 m - 17 m correct
Depth range stated by developer 15 m - 19 m correct
Distance From Shore (reported) 15 km correct
Distance From Shore (computed from centre) 23 km correct
Ports Installation base Grenaa Harbour correct
Ops and maintenance Grenaa Harbour correct
Grid Converter platforms None correct
Offshore transformers Anholt Substation correct
Grid connection point Trige correct
Cable landing point Saltbækken, Grenaa correct
Export Cables
Please note that export cables connect the offshore transformer (substation) to either; shore or an offshore HVAC-HVDC converter station for onward transmission via HVDC cabling. Please see the converters page for planned converter stations and transmission cables.

The export cable length does not generally include the onshore component. The exception is when the onshore substation is close to shore.
Number of Export Cables 1 correct
Average length per cable 24.5 km correct
Transmission type (e.g. HVAC) HVAC correct
Nominal voltage 220 kV correct
Maximum voltage 245 kV correct
Power rating correct
Number of cores 3 correct
Conductor type Al correct
Section 1600 mm2 correct
Insulation correct
Number fibre optics correct
Minimum bend radius (MBR) correct
Burial depth correct
Comments correct
Onshore Cables (new) Number of onshore cables correct
Average length per cable 56 km correct
Comments correct
Array Cables Array cable length 150 km correct
Estimated cable length In purchased database
Transmission type (e.g. MVAC) MVAC correct
Nominal voltage 36 kV correct
Maximum voltage correct
Burial depth correct
Number of cores correct
Conductor type correct
Section 500 mm2 correct
Insulation correct
Power rating correct
Number of fibre optics correct
Minimum bend radius (MBR) correct
Comments correct
Benefits Homes powered annually 223436 correct
CO2 reduced per year 451564 tonnes correct
SO2 reduced per year 10501 tonnes correct
Expected life correct
Other Website Visit correct

Events on Anholt
12345
DateTypeDescriptionSourceCorrect
Subscribe
Event Type: Unknown                                                                                                                                                                                                                                                        Unknown
The inauguration will be held on this date in attendance will be Her Majesty The Queen and His Royal Highness The Prince Consort. Subscribe correct
Subscribe
Event Type: Operation - Fully Commissioned                                                                                                                                                                                                                                 Operation - Fully Commissioned
Estimated date for full commissioning. The wind farm must be fully commissioned by the end of Subscribe, otherwise the tariff will be reduced and a penalty will be applied. As part of the offshore infrastructure, the Island of Anholt will be connected to the main land grid for the first time. Previously the island was dependent on generators for electricity supply. Subscribe correct
30-Apr-2013
Event Type: Installation - Turbine Installation                                                                                                                                                                                                                            Installation - Turbine Installation
Turbine Installation: 97 turbines have been installed and 14 ready to be installed. Power: 59 turbines are connected to the grid. Number of turbines installted by vessel: Sea Power 39, Sea Worker 31, Sea Installer 14 and Sea Jack 13. The Sea Installer and the Sea Jack have now left the project. Visit correct
31-Mar-2013
Event Type: Installation - Turbine Installation                                                                                                                                                                                                                            Installation - Turbine Installation
At the end of March 2013 75 turbines were installed, 68 were connected to the grid and 39 were producing electricity. During this month the 36th turbine that produced power meant that Denmark reached a total of 1GW of offshore wind power. Visit correct
18-Mar-2013
Event Type: Operation - Generating Power                                                                                                                                                                                                                                   Operation - Generating Power
The 36th turbine was connected to the grid and with that Denmark reached 1GW of offshore wind energy. Visit correct
06-Mar-2013
Event Type: Installation - Turbine Installation                                                                                                                                                                                                                            Installation - Turbine Installation
Half of the turbines were installed with the 56th of 111 being installed. Visit correct
28-Feb-2013
Event Type: Installation - Turbine Installation                                                                                                                                                                                                                            Installation - Turbine Installation
Construction update: 48 turbines installed, of those 44 are connected to the grid and 30 are producing power. Visit correct
19-Feb-2013
Event Type: Installation - Cable installation                                                                                                                                                                                                                              Installation - Cable installation
The flushing of the array cables was completed on the site. However at some positions the cables couldn't be flushed to the required depth therefore rock dumping will occur during the summer. Visit correct
15-Feb-2013
Event Type: Installation - Turbine Installation                                                                                                                                                                                                                            Installation - Turbine Installation
Construction Update - SEA POWER, SEA WORKER and SEA JACK have finished installation of 36 wind turbines and continue to install. Visit correct
04-Feb-2013
Event Type: Installation - Turbine Installation                                                                                                                                                                                                                            Installation - Turbine Installation
Construction Update: SEA POWER has now finished the installation of 22 wind turbines. She has now been joined by SEA WORKER and SEA JACK, which are aiding turbine installation. Visit correct
12345

Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.
Comments on Anholt offshore wind farm Please note, your comment will take 1 hour to appear.

Your Name * :
Web Site (optional) : http://
Comment * :
* required

Added: Mon, 24 Jan 2011 14:20:00 GMT
Oestship is your local contact in Grenaa in relation to marine related services incl. a 24/7 setup for stevedoring, port agency, storage, office facilities and accommodation during project. Please visit us at www.oestship.dk for more details. On 01st January 2011 Oestship became a member of the Blue Water Shipping Group - pls. see more on www.bws.dk