StatusName
Fully Commissioned Chenjiagang Xiangshui intertidal Project
Fully Commissioned Dafeng Intertidal Demonstration
Fully Commissioned Donghai Bridge 100 MW offshore wind power demonstration project
Fully Commissioned Huaneng Rongcheng Power Prototype Demonstration Project
Fully Commissioned Longyuan Rudong Intertidal Demonstration Project
Fully Commissioned Suizhong 36-1 Oil Field
Fully Commissioned Xiangshui Intertidal Pilot Project - Goldwind
Fully Commissioned Xiangshui Intertidal Pilot Project - Turbine 3
Fully Commissioned Xiangshui Intertidal Pilot Project- Shanghai Electric
Partial Generation/Under Construction Rudong Intertidal I Development Zone
Partial Generation/Under Construction Rudong Intertidal III Development Zone
Under Construction Bin Hai Offshore Concession Project
Under Construction Da Feng Intertidal Concession Project
Under Construction Datang Laizhou Wind Farm Phase III
Under Construction Dong Tai Intertidal Concession Project
Under Construction Donghai Bridge Offshore Wind Farm Phase II (Extension) project
Under Construction GD Leizhou East 49.5MW Wind Farm Project
Under Construction Guangdong Yudean - Xuwen offshore wind power demonstration project
Under Construction Huaneng Rongcheng Power Project
Under Construction Nuhai
Under Construction Sheyang Offshore Concession Project
Under Construction Xiangshui Offshore Demonstation Project
Under Construction Zhuhai Guishan Hai Demonstration Project
Consent Authorised Beibu Gulf offshore wind power project Beibu Gulf offshore wind power project
Consent Authorised Binhai Offshore Phase I - 300MW
Consent Authorised China Guangdong Nuclear Power Daishan 4 offshore wind farm
Consent Authorised China Guangdong Nuclear Power East China Sea
Consent Authorised CNOOC Weihai - phase I
Consent Authorised CNOOC Weihai - Roncheng - Northern Block
Consent Authorised CPI Jiangsu Dafeng offshore wind farm demonstration project (200MW intertidal)
Consent Authorised Dagang Intertidal
Consent Authorised Dongtai wind farm stage 3
Consent Authorised Fuqing Haitan Strait Intertidal wind farm
Consent Authorised Ganyu
Consent Authorised HEC Offshore Wind Farm
Consent Authorised Hong Kong Offshore Wind Farm
Consent Authorised Huadian Yuhuan Offshore Wind Farm - Phase 1
Consent Authorised Huaneng Dafeng Intertidal C4 Wind Power Demonstration Project
Consent Authorised Kaomen Haitang
Consent Authorised Linhai Offshore Wind Farm
123
Featured Ports
Featured Port
Able Humber Port, United Kingdom Image of <%# Eval("PortName") %> Maximum Trenched Depth: 11 m
Entrance Width: 840 m
Spring Tidal Range: 6.4 m
Quay Length: 1279 m
Quay Loading Capability: 20 tonnes/m2
Land for Development: 647 ha
More details...



Who is generating power
Who's Generating Power?
1.  United Kingdom - 1858.40 MW
2.  Denmark - 874.48 MW
3.  China - 351.00 MW
More...
Whose Turbines are Generating?
Whose Turbines are Generating?
1.  Siemens Wind Power A/S (Siemens AG) - 1522.00 MW
2.  Vestas Offshore A/S (Vestas Wind Systems A/S) - 1404.12 MW
3.  REpower Systems AG (Suzlon Energy Limited) - 250.00 MW
Loading Map
Vessels on Donghai Bridge Offshore Wind Farm Phase II (Extension) project
Vessels & Equipment Available for Immediate Charter
Statistics for Donghai Bridge Offshore Wind Farm Phase II (Extension) project
Wind Farm Name Donghai Bridge Offshore Wind Farm Phase II (Extension) project (also known as East China Sea Bridge Offshore Wind Farm Phase II 东海大桥海上风电场二期(扩建)工程项目) correct
CountryChina
Region Shanghai correct
SeaName East China Sea correct
Centre Latitude 30.768°
Centre Longitude 121.925°
Did you know? Its easy to add a map with this windfarm to your website! More...
Round, tender or call 
Development Status Under Construction correct
Comments on the Status 
Status Documentation
Capacity 102.2 MW correct
Turbine Capacity 3.6 MW correct
Number of Turbines 28 correct
Turbine Model SE 3.6/116 (Shanghai Electric), 1 x SL5000/LZ62/HH100 27 x SE3.6600/116/90 correct
10 Year Mean Wind Speed (2000-2009) Available online now
Other wind speed data at this location: 6 hr/day/month historic data..., BERR, NERL
(Now incorporating NERL models for USA Projects!)
Weather Forecast Services Weather Solutions For Offshore Wind Power
Rotor Diameter 116 m correct
Total Turbine Height 174 m correct
Hub Height 116 m correct
Other comments Project consists of 26 x 3.6MW turbines and two prototype turbines one 3.6MW the other being 5MW, the prototypes were installed in October 2011 correct
Foundation Grounded: High-Rise Pile Cap correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Area 31 km2
Water Depth Min (Chart Datum) 7 m correct
Water Depth Max (Chart Datum) 9 m correct
Depth range stated by developer correct
Distance From Shore (reported) 6 km correct
Distance From Shore (computed from wind farm centre) 12 km
Export Cable Length correct
Infield Cable Length correct
Estimated Infield Cable Length This information is available in the purchased database - please enquire.
Export Cable Capacity correct
Infield Cable Capacity correct
Number of Export Cables correct
Export Cable Type correct
Cable Description correct
Number of Offshore Substations correct
Grid Connection Point correct
Cable Landing Point correct
Annual Capacity Factor correct
Expected Life correct
Estimated Capital Cost (CapEx) This information is available in the purchased database - please enquire.
Stated Project Cost CNY(mill) 1910.00 correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Port For Installation Base Yangshan Port correct
Port For Ops and Maintenance correct
Number of homes powered annually: 57,145 homes
CO2 Reduced Per Year 115,490 tonnes
SO2 Reduced Per Year 2,686 tonnes
Website No Website correct

Events on Donghai Bridge Offshore Wind Farm Phase II (Extension) project
DateTypeDescriptionSourceCorrect
Oct-2011
Event Type: Installation - Turbine Installation                                                                                                                                                                                                                            Installation - Turbine Installation
Prototype SL5000 and SE3.6 turbines installed Visit correct
Aug-2011
Event Type: Planning - Consent Authorised                                                                                                                                                                                                                                  Planning - Consent Authorised
Approved for offshore construction to start Visit correct
15-Jun-2011
Event Type: Planning - Consent Authorised                                                                                                                                                                                                                                  Planning - Consent Authorised
China 12th 5year plan include the developing plan Visit correct
16-Mar-2011
Event Type: Installation - Met Mast                                                                                                                                                                                                                                        Installation - Met Mast
Met mast installation Other correct
2011
Event Type: Installation - Offshore Construction Starts                                                                                                                                                                                                                    Installation - Offshore Construction Starts
Prototype SL5000 and SE3.6 turbines installed Visit correct
11-Oct-2010
Event Type: Planning - Other Approval                                                                                                                                                                                                                                      Planning - Other Approval
Approved for cable installation Visit correct

Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.

Be the first to comment on Donghai Bridge Offshore Wind Farm Phase II (Extension) project offshore wind farm Please note, your comment will take 1 hour to appear.

Your Name * :  
Web Site (optional) : http://  
Comment * :  
* required


Weather Forecast for Donghai Bridge Offshore Wind Farm Phase II (Extension) project More weather tools available on 4C Interactive Map. More weather forecast tools