ENOVA Offshore Project Ems Emden
4.5 MW Fully Commissioned Germany
Updated weekly to include the latest news, your feedback and other data.
35 Countries, 1173 Windfarms, 7307 Stakeholders, 2711 Events, 161 Vessels, 131 Turbines NEW, 35 Ports,
Filter Projects by Country
Featured Ports
Featured Port
Able Seaton Port, United Kingdom Image of <%# Eval("PortName") %> Maximum Trenched Depth: 15 m
Entrance Width: 125 m
Spring Tidal Range: 4.6 m
Quay Length: 791 m
Quay Loading Capability: 60 tonnes/m2
Land for Development: 45 ha
More details...



Who is generating power
Who's Generating Power?
1.  United Kingdom - 1858.40 MW
2.  Denmark - 874.48 MW
3.  China - 351.00 MW
More...
Whose Turbines are Generating?
Whose Turbines are Generating?
1.  Siemens Wind Power A/S (Siemens AG) - 1522.00 MW
2.  Vestas Offshore A/S (Vestas Wind Systems A/S) - 1404.12 MW
3.  REpower Systems AG (Suzlon Energy Limited) - 250.00 MW
Loading Map
RoleOrganisationDescription 
Developer ENOVA Energieanlagen GmbH Main developer correct
Developer ENERCON GmbH correct
Developer EWE AG correct
Operator EWE AG correct
Owner EWE AG
Percentage: Subscribe
correct
Vessels on ENOVA Offshore Project Ems Emden
Vessels & Equipment Available for Immediate Charter
Statistics for ENOVA Offshore Project Ems Emden
Wind Farm Name ENOVA Offshore Project Ems Emden (also known as Emden) correct
CountryGermany
Region 12nm zone (Lower Saxony Niedersachsen) correct
SeaName North Sea correct
Centre Latitude 53.332°
Centre Longitude 7.211°
Did you know? Its easy to add a map with this windfarm to your website! More...
Round, tender or call 
Development Status Fully Commissioned correct
Comments on the Status 
Status Documentation
Capacity 4.5 MW correct
Turbine Capacity 4.5 MW correct
Number of Turbines 1 correct
Turbine Model Enercon E-112 (Enercon) correct
10 Year Mean Wind Speed (2000-2009) Available online now
Other wind speed data at this location: 6 hr/day/month historic data..., BERR, NERL
(Now incorporating NERL models for USA Projects!)
Weather Forecast Services Weather Solutions For Offshore Wind Power
Rotor Diameter 114 m correct
Total Turbine Height 157 m correct
Hub Height 100 m correct
Other comments correct
Foundation Grounded: Monopile correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Area 0 km2
Water Depth Min (Chart Datum) 0 m correct
Water Depth Max (Chart Datum) 2 m correct
Depth range stated by developer correct
Distance From Shore (reported) 0 km correct
Distance From Shore (computed from wind farm centre) 0.6 km
Export Cable Length correct
Infield Cable Length correct
Estimated Infield Cable Length This information is available in the purchased database - please enquire.
Export Cable Capacity correct
Infield Cable Capacity correct
Number of Export Cables correct
Export Cable Type correct
Cable Description correct
Number of Offshore Substations correct
Grid Connection Point correct
Cable Landing Point Emden correct
Annual Capacity Factor correct
Expected Life correct
Estimated Capital Cost (CapEx) This information is available in the purchased database - please enquire.
Stated Project Cost correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Port For Installation Base correct
Port For Ops and Maintenance correct
Number of homes powered annually: 2,516 homes
CO2 Reduced Per Year 5,085 tonnes
SO2 Reduced Per Year 118 tonnes
Website Visit correct

Events on ENOVA Offshore Project Ems Emden
DateTypeDescriptionSourceCorrect
15-Oct-2004
Event Type: Operation - Generating Power                                                                                                                                                                                                                                   Operation - Generating Power
On October 15th the ENOVA Offshore Ems-Emden started its test run and since October 20th it is running in regular operation. Other correct
Jun-2004
Event Type: Installation - Foundation Installation                                                                                                                                                                                                                         Installation - Foundation Installation
Start-up of building the substructure was in June. It is set in a dried-out basin, as a piling foundation divided by steel sheets from the river Ems. Other correct
27-Nov-2003
Event Type: Planning - Consent Authorised                                                                                                                                                                                                                                  Planning - Consent Authorised
Consent Authorised Other correct

Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.

Be the first to comment on ENOVA Offshore Project Ems Emden offshore wind farm Please note, your comment will take 1 hour to appear.