TGS | Powered by 4C Offshore

4C is now TGS

We are excited to announce a significant milestone in 4C Offshore's journey. Our integration into the TGS family marks the beginning of a new era in offshore wind market intelligence.


Learn what this means for you!

First transition piece in place at Hornsea

4C Offshore | Tom Russell
By: Tom Russell 02/03/2018 Twitter
ØrstedThe first transition piece has been installed at the Hornsea Project One offshore wind farm. Each one weighs 400 tons and is to be installed by A2Sea’s vessel SEA INSTALLER.

Offshore construction recently kicked off at Hornsea Project One with the installation of the first monopile at the end of January. The monopile installation is being carried out by GeoSea’s jack-up installation vessel,  Innovation. It can carry up to four monopiles at a time, each one is 65m long, weighs around 800t and has a diameter of 8.1m.

Poised to become the world’s biggest wind farm, the Ørsted owned project is anticipated to produce enough clean energy for well over one million UK homes. It is located 120km off the Yorkshire coast and will consist of 174 turbines due to be commissioned in 2020.

For more information please follow the links provided.
Click here for our interactive map.

Premium

4C Offshore Premium, our most popular subscription, gives you full access to use the 4C Offshore WebApp which includes exclusive offshore wind, transmission and vessel reports, news and downloads.

Request a 30 minute Demo

Trending News!