Frederikshavn
7.6 MW Fully Commissioned Denmark
Updated weekly to include the latest news, your feedback and other data.
38 Countries, 1323 Windfarms, 9111 Stakeholders, 4314 Events, 824 Vessels, 154 Turbines NEW, 42 Ports,
Filter Projects by Country
Featured Ports
Featured Port
Harwich Navyard, United Kingdom Image of <%# Eval("PortName") %> Maximum Trenched Depth: 8.5 m
Entrance Width:
Spring Tidal Range: 4.8 m
Quay Length: 175 m
Quay Loading Capability:
Land for Development:
More details...



Who is generating power
Who's Generating Power?
1.  United Kingdom - 3321.2000 MW
2.  Denmark - 871.4800 MW
3.  China - 559.5000 MW
More...
Whose Turbines are Generating?
Whose Turbines are Generating?
1.  Siemens Wind Power A/S (Siemens AG) - 3084.8000 MW
2.  Vestas Offshore A/S (Vestas Wind Systems A/S) - 1401.1200 MW
3.  REpower Systems AG (Suzlon Energy Limited) - 434.5000 MW
Loading Map
Equipment Available for Charter
Statistics for Frederikshavn
General Information Name Frederikshavn correct
Other names correct
Country name Denmark correct
Region Frederikshavn correct
Comments Vestas and Nordex have Rotor diameters of 90m with Bonus having 82.4. The Vestas turbine uses the bucket foundation and the other turbines use the monopile foundation type. One of the two Vestas turbines is on shore. correct
Round (or category) correct
Development status Fully Commissioned correct
Comments on the status correct
Power & Turbines Notice any Errors? You can keep this an open resource by submitting corrections!
Project Capacity 7.6 MW correct
Turbine Model N90/2300 (Nordex), Vestas V90 3 MW, Bonus (Siemens) 82.4 2.3 MW correct
Turbine Capacity 2.3 MW correct
Number of Turbines 4 correct
Total Turbine Height 125 m correct
Hub Height 80.00 m correct
Rotor Diameter 90 m correct
Foundation Various (Monopile and Bucket) correct
Windspeed 10 Year Mean Wind Speed (2000-2009) Available online now
Detailed wind speed data 6 hr/day/month historic data
Costs Stated Project Cost correct
Location & Environment Sea name Kattegat correct
Centre latitude 57.443° correct
Centre longitude 10.562° correct
Area 0 km2 correct
Depth range (Chart Datum) 1 m - 4 m correct
Depth range stated by developer correct
Distance From Shore (reported) 3.2 km correct
Distance From Shore (computed from centre) 3.1 km correct
Ports Installation base Frederikshavn Harbour correct
Ops and maintenance Frederikshavn Harbour correct
Grid Converter platforms None correct
Offshore transformers None correct
Grid connection point correct
Cable landing point correct
Export Cables
Please note that export cables connect the offshore transformer (substation) to either; shore or an offshore HVAC-HVDC converter station for onward transmission via HVDC cabling. Please see the converters page for planned converter stations and transmission cables.

The export cable length does not generally include the onshore component. The exception is when the onshore substation is close to shore.
Number of Export Cables correct
Average length per cable correct
Transmission type (e.g. HVAC) correct
Nominal voltage correct
Maximum voltage correct
Power rating correct
Number of cores correct
Conductor type correct
Section correct
Insulation correct
Number fibre optics correct
Minimum bend radius (MBR) correct
Burial depth correct
Comments correct
Onshore Cables (new) Number of onshore cables correct
Average length per cable correct
Comments correct
Array Cables Array cable length correct
Estimated cable length In purchased database
Transmission type (e.g. MVAC) correct
Nominal voltage correct
Maximum voltage correct
Burial depth correct
Number of cores correct
Conductor type correct
Section correct
Insulation correct
Power rating correct
Number of fibre optics correct
Minimum bend radius (MBR) correct
Comments correct
Benefits Homes powered annually 4250 correct
CO2 reduced per year 8588 tonnes correct
SO2 reduced per year 200 tonnes correct
Expected life correct
Other Website correct

Events on Frederikshavn
DateTypeDescriptionSourceCorrect
Jun-2003
Event Type: Operation - Fully Commissioned                                                                                                                                                                                                                                 Operation - Fully Commissioned
Fully commissioned in June 2003 Other correct
Apr-2002
Event Type: Operation - Generating Power                                                                                                                                                                                                                                   Operation - Generating Power
First power produced. Other correct
Mar-2002
Event Type: Installation - Foundation Installation                                                                                                                                                                                                                         Installation - Foundation Installation
Installation of foundations Visit correct
2002
Event Type: Installation - Offshore Construction Starts                                                                                                                                                                                                                    Installation - Offshore Construction Starts
Under construction. Visit correct
2001
Event Type: Planning - Financial Close                                                                                                                                                                                                                                     Planning - Financial Close
Estimated year for financial close. Visit correct
2001
Event Type: Planning - Consent Authorised                                                                                                                                                                                                                                  Planning - Consent Authorised
Estimated year for planning consent authorisation. Visit correct
1999
Event Type: Planning - Consent Application Submitted                                                                                                                                                                                                                       Planning - Consent Application Submitted
Estimated year for planning application submission. Visit correct

Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.