90 MW Consent Application Submitted Germany

"4C provides regular updates of in-depth data relative to our needs."

Reef Subsea

  • All Projects
  • Followed Projects

Latest Windfarm News
JDR pockets Sandbank cables
reNews
JDR has won a contract to supply inter-array cabling at Vattenfall's 288MW Sandbank offshore wind farm in the German North Sea. Under the deal with contractor VBMS, the UK-based company will design and manufacture 105km of lines and a range of cable ...
Source: news.google.com
23/09/2014 12:16:16

JDR gets Sandbank inter-array
Recharge
"Sandbank is JDR's third German wind farm win and another important step forward in the development of offshore wind energy in Northern Europe," states JDR executive chairman Pat Herbert. "Our new coilable design is another JDR initiative to help drive ...
Source: news.google.com
23/09/2014 11:38:16

Scottish wind could fix UK energy woes – don't let Westminster blow it
The Conversation UK
For a windy island nation, offshore wind power generation is vital; it not only complements traditional generation methods but does so in a more sustainable way. And yet projections have been significantly scaled back: UK government estimates of expected ...
Source: news.google.com
23/09/2014 12:00:30

A climate change answer in the wind
New York Daily News
To envision the potential of offshore wind power, all one needs to do is look to Europe. Today, roughly 60,000 people are employed by Europe's still-growing, multibillion-dollar offshore wind industry, with dozens of wind farms off the coasts of the United ...
Source: news.google.com
23/09/2014 09:00:16

DECC prepares Burbo 2 verdict
reNews
The UK government is due to make a final determination before the end of this week on Dong Energy's 256MW Burbo 2 wind farm in the Irish Sea. DECC secretary Ed Davey is coming to the end of his statutory three-month review of a Planning Inspectorate ...
Source: news.google.com
22/09/2014 23:35:03

Lightning strikes for Vattenfall
reNews
Vattenfall is to replace a blade on one of the turbines at the 90MW Kentish Flats offshore wind farm that was damaged in lightning strikes. The Swedish company said it decided to act after routine maintenance inspections at the project (pictured) off England's ...
Source: news.google.com
22/09/2014 17:03:11

Trelleborg kit to protect worlds largest floating windfarm
European Rubber Journal (subscription)
Stockholm - Trelleborg's offshore uint is to supply a range of cable protection products, for phase two of the major offshore windfarm Fukushima Forward project in Japan. The Swedish company is to provide distributed buoyancy modules (DBM), bend ...
Source: news.google.com
22/09/2014 16:49:10

New campaign hails UK offshore wind
Energy Live News - Energy Made Easy
DONG Energy's 'Offshore Wind Works' advert suggests offshore wind is “Britain's greatest untapped energy resource”. Platform posters across the London underground network and advertisements are being used to get the message across in the next few ...
Source: news.google.com
22/09/2014 15:43:18

Video: Tuco Marine Debuts Wind Farm Service Boat
MarineLink
The ProZero 13m WIND FARM SERVICE BOAT is constructed from carbon fiber composites due to the industry's focus on fuel efficiency obtained by less operational power needed. Further the low weight achieved by this construction, also makes it possible ...
Source: news.google.com
22/09/2014 13:44:55

OrbisEnergy and WAB to collaborate on North Sea offshore wind projects
CleanTechnology News, Industry Analysis, Market Research Reports - Clean Technology Business Review
OrbisEnergy business development manager Johnathan Reynolds said: "We hope there will be stronger relationships for our business communities, collaborative relationships between OrbisEnergy and WAB, and new projects that will help the offshore wind ...
Source: news.google.com
22/09/2014 11:40:49




4C Offshore Ltd. has achieved certification to the ISO 9001, ISO 14001 and OHSAS 18001 standards for quality, environmental, and health & safety management.
map not available
Developers/Owners/Operators
RoleOrganisation 
Developer correct
Developer correct
Owner correct
Project Details for Gode Wind 03
General Information Name Gode Wind 03 correct
Other names Gode Wind III correct
Country name Germany correct
Region Exclusive Economic Zone (DolWin) (BSH Cluster 3 in Draft Network Plan) correct
Comments All agreements to use Vestas or Repower turbines no longer stand after DONG acquired the project. Turbines went out to tender for all three phases and it was decided that Siemens' 6MW model will be used. DONG have contracted 154 6MW turbines with Siemens for the four phases of Gode Wind. correct
Round (or category) correct
Development status Consent Application Submitted correct
Comments on the status correct
Power & Turbines Notice any Errors? You can keep this an open resource by submitting corrections!
Project Capacity 90 MW correct
Turbine Model SWT-6.0-154 (Siemens) correct
Turbine Capacity 6 MW correct
Number of Turbines 15 correct
Total Turbine Height correct
Hub Height correct
Rotor Diameter 154 m correct
Foundation Grounded: Monopile correct
Windspeed 10 Year Mean Wind Speed (2000-2009) Available online now
Detailed wind speed data 6 hr/day/month historic data
Costs Stated Project Cost correct
Location & Environment Sea name North Sea correct
Centre latitude 54.037° correct
Centre longitude 7.110° correct
Area 12 km2 correct
Depth range (Chart Datum) 30 m - 34 m correct
Depth range stated by developer correct
Distance From Shore (reported) 39 km correct
Distance From Shore (computed from centre) 41 km correct
Ports Installation base correct
Ops and maintenance correct
Grid Converter platforms Nordsee Cluster 3 Converter 3 -Estimated DolWin6 correct
Offshore transformers correct
Grid connection point May connect to either Nordsee Cluster 3 Converter 2 or Nordsee Cluster 3 Converter 3 correct
Cable landing point correct
Export Cables
Please note that export cables connect the offshore transformer (substation) to either; shore or an offshore HVAC-HVDC converter station for onward transmission via HVDC cabling. Please see the converters page for planned converter stations and transmission cables.

The export cable length does not generally include the onshore component. The exception is when the onshore substation is close to shore.
Number of Export Cables 1 correct
Average length per cable 14.8 km correct
Transmission type (e.g. HVAC) correct
Nominal voltage correct
Maximum voltage correct
Power rating correct
Number of cores correct
Conductor type correct
Section Area correct
Insulation correct
Number fibre optics correct
Export minimum bend radius (MBR) correct
Burial depth correct
Comments Cable length and number of cables has been estimated where it is not yet decided by the developer. correct
Onshore Cables Number of onshore cables correct
Average length per cable correct
Comments correct
Array Cables Array cable length correct
Estimated cable length LogIn
Transmission type (e.g. MVAC) correct
Nominal voltage correct
Maximum voltage correct
Burial depth correct
Number of cores correct
Conductor type correct
Section correct
Insulation correct
Power rating correct
Number of fibre optics correct
Minimum bend radius (MBR) correct
Comments correct
Benefits Homes powered annually 58711 correct
CO2 reduced per year 118654 tonnes correct
SO2 reduced per year 2759 tonnes correct
Expected life correct
Other Website correct