Gode Wind 03
90 MW Consent Application Submitted Germany

"I like the breadth and depth of the data contained in the database and the fact information is kept up-to-date."

Industry Analyst, Government

  • All Projects
  • Followed Projects
map not available
Developers/Owners/Operators
RoleOrganisation 
Developer correct
Developer correct
Owner correct
Project Details for Gode Wind 03
General Information Name Gode Wind 03 correct
Other names Gode Wind III correct
Country name Germany correct
Region Exclusive Economic Zone (DolWin) (BSH Cluster 3 in Draft Network Plan) correct
Comments All agreements to use Vestas or Repower turbines no longer stand after DONG acquired the project. Turbines went out to tender for all three phases and it was decided that Siemens' 6MW model will be used. DONG have contracted 154 6MW turbines with Siemens for the four phases of Gode Wind. correct
Round (or category) correct
Development status Consent Application Submitted correct
Comments on the status correct
Power & Turbines Notice any Errors? You can keep this an open resource by submitting corrections!
Project Capacity 90 MW correct
Turbine Model SWT-6.0-154 (Siemens) correct
Turbine Capacity 6 MW correct
Number of Turbines 15 correct
Total Turbine Height correct
Hub Height correct
Rotor Diameter 154 m correct
Foundation Grounded: Monopile correct
Windspeed 10 Year Mean Wind Speed (2000-2009) Available online now
Detailed wind speed data 6 hr/day/month historic data
Costs Stated Project Cost correct
Location & Environment Sea name North Sea correct
Centre latitude 54.037° correct
Centre longitude 7.110° correct
Area 12 km2 correct
Depth range (Chart Datum) 30 m - 34 m correct
Depth range stated by developer correct
Distance From Shore (reported) 39 km correct
Distance From Shore (computed from centre) 41 km correct
Ports Installation base correct
Ops and maintenance correct
Grid Converter platforms Nordsee Cluster 3 Converter 3 -Estimated DolWin6 correct
Offshore transformers correct
Grid connection point May connect to either Nordsee Cluster 3 Converter 2 or Nordsee Cluster 3 Converter 3 correct
Cable landing point correct
Export Cables
Please note that export cables connect the offshore transformer (substation) to either; shore or an offshore HVAC-HVDC converter station for onward transmission via HVDC cabling. Please see the converters page for planned converter stations and transmission cables.

The export cable length does not generally include the onshore component. The exception is when the onshore substation is close to shore.
Number of Export Cables 1 correct
Average length per cable 14.8 km correct
Transmission type (e.g. HVAC) correct
Nominal voltage correct
Maximum voltage correct
Power rating correct
Number of cores correct
Conductor type correct
Section Area correct
Insulation correct
Number fibre optics correct
Export minimum bend radius (MBR) correct
Burial depth correct
Comments Cable length and number of cables has been estimated where it is not yet decided by the developer. correct
Onshore Cables Number of onshore cables correct
Average length per cable correct
Comments correct
Array Cables Array cable length correct
Estimated cable length LogIn
Transmission type (e.g. MVAC) correct
Nominal voltage correct
Maximum voltage correct
Burial depth correct
Number of cores correct
Conductor type correct
Section correct
Insulation correct
Power rating correct
Number of fibre optics correct
Minimum bend radius (MBR) correct
Comments correct
Benefits Homes powered annually 58711 correct
CO2 reduced per year 118654 tonnes correct
SO2 reduced per year 2759 tonnes correct
Expected life correct
Other Website correct
Jess