Gunfleet Sands I + II
172.8 MW Fully Commissioned United Kingdom

"The 4C database is much more comprehensive than we expected – it is easily accessible, updated regularly and contains a wealth of relevant up to date information. This has been a very good investment for us and we recommend it as a must for the Wind Farm Vessel Supply Chain."

David Symon, Humber Work Boats Ltd

Latest Windfarm News
Answers blowing in the wind: High-tech buoys in Sequim to aid energy research ...
Peninsula Daily
Will Shaw, an atmospheric scientist with Pacific Northwest National Laboratory, explains how lasers will shoot into the sky to measure wind conditions for potential power development aboard one of two $1.3 million research buoys that will be deployed in ...
Source: news.google.com
16/09/2014 07:30:54

Wind turbines kill fewer birds than cats, cell towers
9NEWS.com
Wind turbines kill between 214,000 and 368,000 birds annually — a small fraction compared with the estimated 6.8 million fatalities from collisions with cell and radio towers and the 1.4 billion to 3.7 billion deaths from cats, according to the peer-reviewed ...
Source: news.google.com
16/09/2014 02:17:39

Cape Wind signs lease for New Bedford staging area
The Republican - masslive.com
NEW BEDFORD - Announcing a lease deal with Cape Wind, state officials expect the offshore wind farm developers, who are still fighting lawsuits and assembling financing, to begin operations at the South Coast Marine Terminal in New Bedford in January.
Source: news.google.com
16/09/2014 02:31:07

Scottish vote may freeze 5.7GW-plus in wind
Business Spectator
The Contract-for-Difference, or CfD, support scheme is currently being phased in, and in April the 664MW Beatrice offshore wind project in Scottish waters, costing an estimated $3.4 billion*, was selected by the UK Department of Energy and Climate Change ...
Source: news.google.com
16/09/2014 00:46:51

Chafee sees state as future leader in wind energy
Charlotte Observer
PROVIDENCE, R.I. Rhode Island will have a major role to play in the offshore wind industry, even though a developer chose to use a Massachusetts port to build a large wind farm, Gov. Lincoln Chafee said Monday. Rhode Island officials had hoped Cape ...
Source: news.google.com
15/09/2014 22:00:11

Iberdrola SA (IBE)'s ScottishPower unit is nearing completion of a 389-megawatt...
Mynextfone
Iberdrola Nears Completion of $2.6 Billion Offshore Wind Farm. Iberdrola SA (IBE)'s ScottishPower unit is nearing completion of a 389-megawatt offshore wind project. The 1.6 billion-pound ($2.6 billion) wind farm will be ready to start full commercial ...
Source: news.google.com
15/09/2014 17:34:45

U.K.'s first two-bladed offshore wind turbine approved for Scotland
High Performance Composites
Two-bladed designs at this scale are a major innovation for the offshore wind industry and the deployment offshore of these 6 MW turbines at Methil will be the first in the world of their kind. 2-B Energy has received grant support from the Department of Energy ...
Source: news.google.com
15/09/2014 17:19:27

Report concludes that Bicker Fen best option
Sleaford Today
RWE Innogy has published a report outlining the results of a study undertaken with National Grid which they say clearly highlights why a location at Bicker Fen overlooking Little Hale is the best option to connect the proposed Triton Knoll offshore wind farm to ...
Source: news.google.com
15/09/2014 17:32:11

Cape Wind offshore renewable energy project to be built in New Bedford
PennEnergy (press release)
NEW BEDFORD, Mass. (AP) — The developers of a proposed wind farm off the coast of Cape Cod have signed a lease agreement with the state to use New Bedford for staging and construction of the 130-turbine project, officials announced Friday. Gov.
Source: news.google.com
15/09/2014 16:01:28



map not available
Developers/Owners/Operators
RoleOrganisation 
Developer correct
Developer correct
Operator correct
Operator correct
Operator-Offshore Transmission correct
Owner correct
Owner correct
Owner correct
Owner-Offshore Transmission
TC Gunfleets Sands OFTO Limited (Transmission Capital Limited)
correct
Project Details for Gunfleet Sands I + II
General Information Name Gunfleet Sands I + II correct
Other names GFS correct
Country name United Kingdom correct
Region England, East of England correct
Comments Dong have submitted a contingency for emergency array cable repairs. The permission sought is for a period between 01/05/2014 and 01/07/2036 this will reduce the time waiting for permission to be granted. correct
Round (or category) Round 1 correct
Development status Fully Commissioned correct
Comments on the status correct
Power & Turbines Notice any Errors? You can keep this an open resource by submitting corrections!
Project Capacity 172.8 MW correct
Turbine Model SWT-3.6-107 (Siemens) correct
Turbine Capacity 3.6 MW correct
Number of Turbines 48 correct
Total Turbine Height 128.5 m correct
Hub Height 75.00 m correct
Rotor Diameter 107 m correct
Foundation Grounded: Monopile correct
Windspeed 10 Year Mean Wind Speed (2000-2009) Available online now
Detailed wind speed data 6 hr/day/month historic data
Costs Stated Project Cost DKK(mill) 3900.00 correct
Location & Environment Sea name North Sea, Southern North Sea (Thames) correct
Centre latitude 51.730° correct
Centre longitude 1.229° correct
Area 16 km2 correct
Depth range (Chart Datum) 0 m - 13 m correct
Depth range stated by developer 2 m - 15 m correct
Distance From Shore (reported) 7 km correct
Distance From Shore (computed from centre) 7.4 km correct
Ports Installation base Harwich correct
Ops and maintenance Brightlingsea correct
Grid Converter platforms None correct
Offshore transformers Gunfleet Sands I + II Substation correct
Grid connection point Cooks Green correct
Cable landing point Holland Haven correct
Export Cables
Please note that export cables connect the offshore transformer (substation) to either; shore or an offshore HVAC-HVDC converter station for onward transmission via HVDC cabling. Please see the converters page for planned converter stations and transmission cables.

The export cable length does not generally include the onshore component. The exception is when the onshore substation is close to shore.
Number of Export Cables 1 correct
Average length per cable 9.3 km correct
Transmission type (e.g. HVAC) HVAC correct
Nominal voltage 132 kV correct
Maximum voltage 145 kV correct
Power rating 182 MVA correct
Number of cores 3 correct
Conductor type Cu correct
Section Area 800 mm2 correct
Insulation XLPE correct
Number fibre optics 48 correct
Export minimum bend radius (MBR) 3 m correct
Burial depth 2 m correct
Comments correct
Onshore Cables Number of onshore cables 3 correct
Average length per cable 3.8 km correct
Comments 132kV, 182MVA, buried to a depth of 1.2m. The cables have been pulled through the ducted section in approximately 400m lengths, in one trench. correct
Array Cables Array cable length 36 km correct
Estimated cable length LogIn
Transmission type (e.g. MVAC) MVAC correct
Nominal voltage 33 kV correct
Maximum voltage correct
Burial depth correct
Number of cores 3 correct
Conductor type Cu correct
Section 500/150 mm2 correct
Insulation EPR correct
Power rating correct
Number of fibre optics 24 correct
Minimum bend radius (MBR) correct
Comments correct
Benefits Homes powered annually 112724 correct
CO2 reduced per year 227816 tonnes correct
SO2 reduced per year 5298 tonnes correct
Expected life 25.0 years correct
Other Website Visit correct