formal
Gunfleet Sands I + II
172.8 MW Fully Commissioned United Kingdom
Updated weekly to include the latest news, your feedback and other data.
38 Countries, 1323 Windfarms, 9111 Stakeholders, 4314 Events, 824 Vessels, 154 Turbines NEW, 42 Ports,
Filter Projects by Country
Featured Ports
Featured Port
Vlissingen - Verbrugge Terminals, The Netherlands Image of <%# Eval("PortName") %> Maximum Trenched Depth: 13.3 m
Entrance Width: 372 m
Spring Tidal Range: 5 m
Quay Length: 1200 m
Quay Loading Capability: 15 tonnes/m2
Land for Development: 70 ha
More details...



Who is generating power
Who's Generating Power?
1.  United Kingdom - 3321.2000 MW
2.  Denmark - 871.4800 MW
3.  China - 559.5000 MW
More...
Whose Turbines are Generating?
Whose Turbines are Generating?
1.  Siemens Wind Power A/S (Siemens AG) - 3084.8000 MW
2.  Vestas Offshore A/S (Vestas Wind Systems A/S) - 1401.1200 MW
3.  REpower Systems AG (Suzlon Energy Limited) - 434.5000 MW
Loading Map
RoleOrganisationDescription 
Developer Gunfleet Sands Ltd (DONG Wind (UK) Limited) Project company correct
Developer Gunfleet Sands II Ltd (DONG Wind (UK) Limited) Project company correct
Operator Gunfleet Sands Ltd (DONG Wind (UK) Limited) correct
Operator Dong Energy Power A/S (DONG Energy) correct
Owner DONG Wind (UK) Limited (DONG Energy) DONG bought project from GE Wind in December 2007.
DONG sold 49.9% stake to Marubeni Corporation in November 2011

Value: Subscribe
Percentage: Subscribe
correct
Owner Marubeni Corporation(丸紅株式会社) Entered into an agreement to purchase 49.9% of the project. The deal was concluded on 01/11/2011.
Value: Subscribe
Percentage: Subscribe
correct
Owner-Offshore Transmission TC Gunfleets Sands OFTO Limited (Transmission Capital Limited) Own the transmission assets after a divestment from DONG.
Licence granted on 19 July 2011

Value: Subscribe
correct
Equipment Available for Charter
Statistics for Gunfleet Sands I + II
General Information Name Gunfleet Sands I + II correct
Other names GFS correct
Country name United Kingdom correct
Region England, East of England correct
Comments correct
Round (or category) Round 1 correct
Development status Fully Commissioned correct
Comments on the status correct
Power & Turbines Notice any Errors? You can keep this an open resource by submitting corrections!
Project Capacity 172.8 MW correct
Turbine Model SWT-3.6-107 (Siemens) correct
Turbine Capacity 3.6 MW correct
Number of Turbines 48 correct
Total Turbine Height 128.5 m correct
Hub Height 75.00 m correct
Rotor Diameter 107 m correct
Foundation Grounded: Monopile correct
Windspeed 10 Year Mean Wind Speed (2000-2009) Available online now
Detailed wind speed data 6 hr/day/month historic data
Costs Stated Project Cost DKK(mill) 3900.00 correct
Location & Environment Sea name North Sea, Southern North Sea (Thames) correct
Centre latitude 51.730° correct
Centre longitude 1.229° correct
Area 16 km2 correct
Depth range (Chart Datum) 0 m - 13 m correct
Depth range stated by developer 2 m - 15 m correct
Distance From Shore (reported) 7 km correct
Distance From Shore (computed from centre) 7.4 km correct
Ports Installation base Harwich correct
Ops and maintenance Brightlingsea correct
Grid Converter platforms None correct
Offshore transformers Gunfleet Sands I + II Substation correct
Grid connection point Cooks Green correct
Cable landing point Holland Haven correct
Export Cables
Please note that export cables connect the offshore transformer (substation) to either; shore or an offshore HVAC-HVDC converter station for onward transmission via HVDC cabling. Please see the converters page for planned converter stations and transmission cables.

The export cable length does not generally include the onshore component. The exception is when the onshore substation is close to shore.
Number of Export Cables 1 correct
Average length per cable 9.3 km correct
Transmission type (e.g. HVAC) HVAC correct
Nominal voltage 132 kV correct
Maximum voltage 145 kV correct
Power rating 182 MVA correct
Number of cores 3 correct
Conductor type Cu correct
Section 800 mm2 correct
Insulation XLPE correct
Number fibre optics 48 correct
Minimum bend radius (MBR) 3 m correct
Burial depth 2 m correct
Comments correct
Onshore Cables (new) Number of onshore cables 3 correct
Average length per cable 3.8 km correct
Comments 132kV, 182MVA, buried to a depth of 1.2m. The cables have been pulled through the ducted section in approximately 400m lengths, in one trench. correct
Array Cables Array cable length 34 km correct
Estimated cable length In purchased database
Transmission type (e.g. MVAC) MVAC correct
Nominal voltage 33 kV correct
Maximum voltage correct
Burial depth correct
Number of cores 3 correct
Conductor type Cu correct
Section 500/150 mm2 correct
Insulation EPR correct
Power rating correct
Number of fibre optics 24 correct
Minimum bend radius (MBR) correct
Comments correct
Benefits Homes powered annually 96621 correct
CO2 reduced per year 195271 tonnes correct
SO2 reduced per year 4541 tonnes correct
Expected life 25.0 years correct
Other Website Visit correct

Events on Gunfleet Sands I + II
12
DateTypeDescriptionSourceCorrect
03-Oct-2012
Event Type: Operation - Service and Maintenance                                                                                                                                                                                                                            Operation - Service and Maintenance
Maintenance took place on the site which between October 2012 and March 2013. Visit correct
2012
Event Type: Operation - Service and Maintenance                                                                                                                                                                                                                            Operation - Service and Maintenance
Adjustment of J-tubes and tightening of immersed seals. DONG Energy expects the servicing to be performed on Gunfleet Sands I + II first and eventually on other offshore wind farms in DK and UK. The contract for the work was awarded as a one year framework agreement with an optional extension for three x one year contracts. Visit correct
19-Jul-2011
Event Type: Operation - Service and Maintenance                                                                                                                                                                                                                            Operation - Service and Maintenance
Transmission assets were sold to TC Gunfleet Sands OFTO Limited. Visit correct
11-Apr-2011
Event Type: Planning - Financing Agreement                                                                                                                                                                                                                                 Planning - Financing Agreement
Statkraft signed a Power Purchase Agreement (PPA) with DONG for half of the power from Burbo Bank, Gunfleet Sands, Walney & London Array. Visit correct
2011
Event Type: Operation - Service and Maintenance                                                                                                                                                                                                                            Operation - Service and Maintenance
Preventative maintenance was completed with the replacement of the pitch bearings for a set of turbines. Visit correct
15-Jun-2010
Event Type: Operation - Fully Commissioned                                                                                                                                                                                                                                 Operation - Fully Commissioned
The wind farm was inaugurated on this date although the site has been generating power since Oct 2009. Visit correct
23-Jan-2010
Event Type: Installation - Turbine Installation                                                                                                                                                                                                                            Installation - Turbine Installation
Turbine installation was completed. Other correct
21-Oct-2009
Event Type: Operation - Generating Power                                                                                                                                                                                                                                   Operation - Generating Power
Nine turbines generating of the 30 turbines installed so far Visit correct
20-Aug-2009
Event Type: Operation - Generating Power                                                                                                                                                                                                                                   Operation - Generating Power
First 2 turbines started to produce power. Visit correct
Apr-2009
Event Type: Installation - Turbine Installation                                                                                                                                                                                                                            Installation - Turbine Installation
First turbine installed on the 1st of April. Visit correct
12

Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.
Be the first to comment on Gunfleet Sands I + II offshore wind farm Please note, your comment will take 1 hour to appear.

Your Name * :  
Web Site (optional) : http://  
Comment * :  
* required