Havsul I Phase 2
300 MW Consent Authorised Norway
Updated weekly to include the latest news, your feedback and other data.
35 Countries, 1173 Windfarms, 7307 Stakeholders, 2711 Events, 161 Vessels, 131 Turbines NEW, 35 Ports,
Filter Projects by Country
Featured Ports
Featured Port
Able Humber Port, United Kingdom Image of <%# Eval("PortName") %> Maximum Trenched Depth: 11 m
Entrance Width: 840 m
Spring Tidal Range: 6.4 m
Quay Length: 1279 m
Quay Loading Capability: 20 tonnes/m2
Land for Development: 647 ha
More details...



Who is generating power
Who's Generating Power?
1.  United Kingdom - 1858.40 MW
2.  Denmark - 874.48 MW
3.  China - 351.00 MW
More...
Whose Turbines are Generating?
Whose Turbines are Generating?
1.  Siemens Wind Power A/S (Siemens AG) - 1522.00 MW
2.  Vestas Offshore A/S (Vestas Wind Systems A/S) - 1404.12 MW
3.  REpower Systems AG (Suzlon Energy Limited) - 250.00 MW
Loading Map
Vessels & Equipment Available for Immediate Charter
Statistics for Havsul I Phase 2
Wind Farm Name Havsul I Phase 2 correct
CountryNorway
Region Møre og Romsdal correct
SeaName Norwegian Sea correct
Centre Latitude 62.829°
Centre Longitude 6.384°
Did you know? Its easy to add a map with this windfarm to your website! More...
Round, tender or call 
Development Status Consent Authorised correct
Comments on the Status 
Status Documentation Latest status information from the NVE
Capacity 300 MW correct
Turbine Capacity 5 MW correct
Number of Turbines 60 correct
Turbine Model Not Decided correct
10 Year Mean Wind Speed (2000-2009) Available online now
Other wind speed data at this location: 6 hr/day/month historic data..., BERR, NERL
(Now incorporating NERL models for USA Projects!)
Weather Forecast Services Weather Solutions For Offshore Wind Power
Rotor Diameter 120 m correct
Total Turbine Height 150 m correct
Hub Height 90 m correct
Other comments Consent given for 350MW wind farm with 44-117 3-8MW turbines. Currently envisaged as a 2 phase development.
Cost is for both phases.
Propose the complete assembly and testing of wind turbines on land. Chassis, tower and turbine are assembled at the quay and in calm waters, instead of the open sea. The goal is that the final installation in the field can be done in one operation as opposed to several. correct
Foundation Not Decided correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Area 24 km2
Water Depth Min (Chart Datum) 1 m correct
Water Depth Max (Chart Datum) 100 m correct
Depth range stated by developer 20 m - 60 m correct
Distance From Shore (reported) 20.2 km correct
Distance From Shore (computed from wind farm centre) 19.1 km
Export Cable Length 52 km correct
Infield Cable Length correct
Estimated Infield Cable Length This information is available in the purchased database - please enquire.
Export Cable Capacity 132 kV correct
Infield Cable Capacity 33 kV correct
Number of Export Cables correct
Export Cable Type correct
Cable Description correct
Number of Offshore Substations 1 correct
Grid Connection Point Ormen Lange correct
Cable Landing Point Småge correct
Annual Capacity Factor correct
Expected Life 25 years correct
Estimated Capital Cost (CapEx) This information is available in the purchased database - please enquire.
Stated Project Cost NOK(mill) 7000.00 correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Port For Installation Base correct
Port For Ops and Maintenance correct
Number of homes powered annually: 167,745 homes
CO2 Reduced Per Year 339,012 tonnes
SO2 Reduced Per Year 7,884 tonnes
Website Visit correct

Events on Havsul I Phase 2
DateTypeDescriptionSourceCorrect
Subscribe
Event Type: Operation - Generating Power                                                                                                                                                                                                                                   Operation - Generating Power
Start year of generation power Subscribe correct
Subscribe
Event Type: Installation - Offshore Construction Starts                                                                                                                                                                                                                    Installation - Offshore Construction Starts
Estimated Start Offshore Installation after the installation of Havsul I Phase 1 Subscribe correct

Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.

Be the first to comment on Havsul I Phase 2 offshore wind farm Please note, your comment will take 1 hour to appear.

Your Name * :  
Web Site (optional) : http://  
Comment * :  
* required


Weather Forecast for Havsul I Phase 2 More weather tools available on 4C Interactive Map. More weather forecast tools