HEC Offshore Wind Farm
100 MW Current Status: Concept/Early Planning China Maximum water depth: 21.00 m Distance from shore: 12 km
Updated weekly to include your feedback and new data.
34 Countries, 722 Windfarms, 2686 Stakeholders. 1227 Events.
Filter by Country OceanInsight Windfarm Risk Reports
Who is generating power
Who's Generating Power?
1.  United Kingdom - 1175.60 MW
2.  Denmark - 655.85 MW
3.  Netherlands - 246.80 MW
More...

Who's Building Offshore Wind Farms?
Who's Building Offshore Wind Farms?
1.  United Kingdom - 1155 MW
2.  Germany - 448 MW
3.  Denmark - 207 MW
More...

Whose Turbines are Generating?
Whose Turbines are Generating?
1.  Vestas Offshore A/S (Vestas Wind Systems A/S) - 1219.92 MW
2.  Siemens Wind Power A/S (Siemens AG) - 885.60 MW
3.  Bonus energy A/S (Siemens Wind Power A/S) - 244.15 MW
More...

How much infield cabling is needed for recently consented projects?
How much infield cabling is needed for projects that are consented (but not yet under construction) ?
1.  Germany - 1942 Km
2.  Netherlands - 884 Km
3.  United Kingdom - 687 Km
More...

More Analysis of Offshore Wind
And more ...
How much Infield Cabling will be needed?
Who is laying the foundations?
How deep will the water be?
How long did the consenting process take?
More ...

Your suggestions are welcome.
Location of HEC Offshore Wind Farm Loading Map
Organisations on HEC Offshore Wind Farm Database as spreadsheet Database as spreadsheet
Associate your organisation with this wind farm Associate your organisation
NEW Check Your Organisation's Entries in this Database

Vessels on HEC Offshore Wind Farm Database as spreadsheet Database as spreadsheet
Associate your Vessels with this wind farm Associate your vessels
NEW Check Your Organisation's Entries in this Database
Statistics for HEC Offshore Wind Farm Database as spreadsheet Database as spreadsheet
Associate your organisation with this wind farm Associate your organisation
Wind Farm Name HEC Offshore Wind Farm correct
Other Names Lamma correct
CountryChina
Region Hong Kong correct
SeaName South China Sea correct
Centre Latitude22.17°
Centre Longitude114.08°
Round (UK Only) 
Development Status Concept/Early Planning correct
Comments on the StatusSecured environmental permit
Status Documentation
Capacity 100 MW correct
Turbine Capacity 3.6 MW correct
Number of Turbines 35 correct
Turbine Model Not Decided correct
10 Year Mean Wind Speed (2000-2009) Available online now  (NEW)
23 Years of Wind Speed Observations 6 hr/day/month historic data... (NEW)
Weather Forecast Services Weather Solutions For Offshore Wind Power  (NEW)
Rotor Diameter 80 m correct
Total Turbine Height 115 m correct
Hub Height 75 m
Other comments on this dataThe number of turbines will be between 28 and 35. The turbine capacity will be between 2.3 and 3.6MW. The cost is expected to be between HK$2.5-3m (US$0.32-3.85m).
Foundation Not Decided correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Area 7 Km2
Water Depth Min 17 m correct
Water Depth Max 21 m correct
Distance From Shore (reported) 3.5 km correct
Distance From Shore (computed from wind farm centre) 11.6 km
Export Cable Length 2.5 km correct
Infield Cable Length correct
Estimated Infield Cable Length This information is available in the purchased database - please enquire.
Export Cable Capacity 275 kV correct
Infield Cable Capacity 22 kV correct
Number of Export Cables correct
Export Cable Type correct
Cable Description correct
Number of Offshore Substations 1 correct
Grid Connection Point Lamma Island correct
Cable Landing Point Lamma Island correct
Soil Types correct
Annual Capacity Factor correct
Expected Life 25 years correct
Estimated Capital Cost (CapEx) This information is available in the purchased database - please enquire.
Stated Project Cost HKD(mill) 3000.00 correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Jobs Created correct
Port For Installation Base correct
Port For Ops and Maintenance correct
Custom data Services Can't find what you need? Our Custom Data Services may answer your questions.
Number of homes powered annually: 55915 homes
CO2 Reduced Per Year 113004 tonnes
SO2 Reduced Per Year 2628 tonnes
Website No Website correct

Events on HEC Offshore Wind Farm Database as spreadsheet Database as spreadsheet
Associate your organisation with this wind farm Associate your organisation
DateTypeDescriptionSourceCorrect
2015
Event Type: Operation - Generating Power Operation - Generating Power
The expected commissioning date is in 2015. Visit correct
2015
Event Type: Operation - Generating Power Operation - Generating Power
The expected year for commissioning is 2015. Visit correct
2012
Event Type: Operation - Generating Power Operation - Generating Power
Year generation expected Visit correct
05-Feb-2010
Event Type: PrePlanning - Feasibility Study PrePlanning - Feasibility Study
The EIA study has concluded that this site is the best from 8 sites. A public consultation is scheduled from 08/02/2010 to 09/03/2010. Visit correct

Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.

Be the first to comment on HEC Offshore Wind Farm offshore wind farm
Your Name * :  
Web Site (optional) : http://  
Comment * :  
* required


Weather Forecast for HEC Offshore Wind Farm More weather tools available on 4C Interactive Map. More weather forecast tools