TGS | Powered by 4C Offshore

4C is now TGS

We are excited to announce a significant milestone in 4C Offshore's journey. Our integration into the TGS family marks the beginning of a new era in offshore wind market intelligence.


Learn what this means for you!

DolWin3 Converter

DolWin3 is a 162km long and a 900MW powerful high voltage DC connection. The underground cable is 79km and undersea cable 83km. The grid connection point is the Dorpen West converter station. TenneT will still build and operate DolWin 3. According to the April 2014 draft of the Offshore Network Development Plan, when Borkum Riffgrund I connects to DolWin3 the project will have a transmission capacity of 291MW available, despite the capacity of the wind farm being 312MW. DolWin3 will get an additional 250m cable connecting it to the DolWin1 platform by mid-2017. The cable will be attached to each platform by a steel bridge about 30m in length.
4C Offshore | Image Not Available
Name
DolWin3 Converter
Status
Operational
Latitude
53.996°
Longitude
6.421°

Premium

4C Offshore Premium, our most popular subscription, gives you full access to use the 4C Offshore WebApp which includes exclusive offshore wind, transmission and vessel reports, news and downloads.

Request a 30 minute Demo