TGS | Powered by 4C Offshore

4C is now TGS

We are excited to announce a significant milestone in 4C Offshore's journey. Our integration into the TGS family marks the beginning of a new era in offshore wind market intelligence.


Learn what this means for you!

DolWin4 Converter

Implementation of 66-kV direct connection concept. DolWin4 is a connection around 215km long. About 60km of it are at sea.  Grid connection at Hanekenfähr. The connection systems will go into operation in 2028. A cable will connect the DolWin Delta and DolWin Gamma platforms. Wind farms will connect via 66-kV direct connection concept.
4C Offshore | Image Not Available
Name
DolWin4 Converter
Status
Planned
Latitude
54.041°
Longitude
6.804°

Premium

4C Offshore Premium, our most popular subscription, gives you full access to use the 4C Offshore WebApp which includes exclusive offshore wind, transmission and vessel reports, news and downloads.

Request a 30 minute Demo
Transmission Cable
Name
Number of Cables
Minimum Cable Length
Nominal Voltage
Comments