Hywind 2 Demonstration (Maine)
15 MW Cancelled United States

"4C provides regular updates of in-depth data relative to our needs."

Reef Subsea

More Windfarms
Filter :
123456
StatusName
Decommissioned Keuka 1:125 scale 150kW Rim Drive Prototype
Fully Commissioned DeepCwind Consortium - VolturnUS - Dyces Head Test Site
Consent Authorised Block Island Wind Farm
Consent Authorised Cape Wind
Consent Authorised Fishermen's Atlantic City Windfarm Phase I
Consent Authorised Galveston Met Mast - Test Turbine
Consent Application Submitted Long Island New York City Offshore Wind Project Phase 1
Consent Application Submitted Offshore Wind Power Systems of Texas Titan Platform
Consent Application Submitted Rio Grande
Consent Application Submitted Rio Grande North
Consent Application Submitted Virginia Offshore Wind Technology Advancement Project
Concept/Early Planning Arcadia Offshore (Maryland Call Response)
Concept/Early Planning Arcadia Offshore Massachusetts (Massachusetts Call Response)
Concept/Early Planning Bluewater Wind (New Jersey Call Response)
Concept/Early Planning Condor Wind Energy Mass Call Response (Massachusetts Call Response(Also RFI))
Concept/Early Planning Deepwater ONE
Concept/Early Planning Deepwater Wind New England (Massachusetts Call Response)
Concept/Early Planning Energy Managament Inc(Long Island New York)
Concept/Early Planning Energy Management (Massachusetts Call Response(Also RFI))
Concept/Early Planning Energy Management Maryland (Maryland Call Response (Also RFI))
Concept/Early Planning enXco Development Corporation (Maryland Call Response)
Concept/Early Planning enXco Development Corporation (Massachusetts Call Response)
Concept/Early Planning enXco Development Corporation (New Jersey Call Response)
Concept/Early Planning First State Marine Wind
Concept/Early Planning Fishermen's Energy (Maryland Call Response (Also RFI))
Concept/Early Planning Fishermen's Energy (Massachusetts Call Response(Also RFI))
Concept/Early Planning Fishermen's Energy (New Jersey Call Response)
Concept/Early Planning Fishermen's Energy(Long Island New York)
Concept/Early Planning Galveston Offshore Wind Phase 1
Concept/Early Planning Galveston Offshore Wind Phase 2
Concept/Early Planning Garden State Offshore Energy (New Jersey Call Response)
Concept/Early Planning Georgia Interim Policy Lease Areas
Concept/Early Planning GOWind - (Gulf Offshore Wind Demonstrator)
Concept/Early Planning Hampton Roads Demonstration Project
Concept/Early Planning Hudson Canyon
Concept/Early Planning Iberdrola Renewables (Massachusetts Call Response(Also RFI))
Concept/Early Planning Iberdrola Renewables (New Jersey Call Response)
Concept/Early Planning Icebreaker
Concept/Early Planning Keuka 12.5MW Rim Drive Prototype
Concept/Early Planning Keuka 300kW Rim Drive Prototype
123456
map not available
Developers/Owners/Operators
RoleOrganisation 
Developer
Statoil North America (Statoil ASA)
correct
Owner
Statoil North America (Statoil ASA)
correct
Project Details for Hywind 2 Demonstration (Maine)
General Information Name Hywind 2 Demonstration (Maine) correct
Other names Hywind Maine Pilot, Boothbay Harbor correct
Country name United States correct
Region Maine correct
Comments Statoil intends to build upon the Hywind Demo experience in Norway, expand economies of scale, and further optimise the Hywind technological concept through the installation and operation of a multi turbine offshore wind park that incorporates larger turbine units.

It is more likely that the project will consist of four 3MW turbines, according to a presentation given in Q2 2013 by the American Wind Energy Association this will be the case.

One of seven projects selected for Offshore Wind Advanced Technology Demonstration Projects(OWATDP) initiative. Three of the seven will be selected to receive $47 funding.
correct
Round (or category) OWATDP, Unsolicited Lease Application, Maine RFI, correct
Development status Cancelled correct
Comments on the status In July 2013 Statoil has put the project on hold after new Maine legislation created uncertainty regarding on the final approval being given. The legislation reopens competition and allows the University of Maine to submit a rival bid.

BOEM issued the Request for Interest (RFI) as well as the Notice of Intent (NOI) to prepare an Environmental Impact Statement for the Statoil Project in the Federal Register in August 2012. The BOEM Notice of Determination of No Competitive Interest for the area requested by Statoil North America for a commercial lease was published in the Federal Register on December 19, 2012.

The next step consists of the publication of the Determination of No Competitive Interest (DNCI) by BOEM in the Federal Register. Then, the applicant (Statoil NA) has to submit the Constructions and Operations Plan (COP) and BOEM will analyse lease issuance and COP approval under NEPA and other laws (conduct EIS).
correct
Power & Turbines Notice any Errors? You can keep this an open resource by submitting corrections!
Project Capacity 12 MW - 15 MW correct
Turbine Model Not Decided correct
Turbine Capacity 3 MW correct
Number of Turbines 4 correct
Total Turbine Height correct
Hub Height correct
Rotor Diameter correct
Foundation Floating: Spar Floater correct
Windspeed 10 Year Mean Wind Speed (2000-2009) Available online now
Detailed wind speed data 6 hr/day/month historic data
Costs Stated Project Cost USD(mill) 120.00 correct
Location & Environment Sea name Atlantic Ocean correct
Centre latitude 43.524° correct
Centre longitude -69.534° correct
Area 58 km2 correct
Depth range (Chart Datum) 122 m - 174 m correct
Depth range stated by developer 140 m - 158 m correct
Distance From Shore (reported) 20 km correct
Distance From Shore (computed from centre) 31.9 km correct
Ports Installation base correct
Ops and maintenance correct
Grid Converter platforms correct
Offshore transformers correct
Grid connection point correct
Cable landing point correct
Export Cables
Please note that export cables connect the offshore transformer (substation) to either; shore or an offshore HVAC-HVDC converter station for onward transmission via HVDC cabling. Please see the converters page for planned converter stations and transmission cables.

The export cable length does not generally include the onshore component. The exception is when the onshore substation is close to shore.
Number of Export Cables correct
Average length per cable correct
Transmission type (e.g. HVAC) correct
Nominal voltage correct
Maximum voltage correct
Power rating correct
Number of cores correct
Conductor type correct
Section Area correct
Insulation correct
Number fibre optics correct
Export minimum bend radius (MBR) correct
Burial depth correct
Comments correct
Onshore Cables Number of onshore cables correct
Average length per cable correct
Comments correct
Array Cables Array cable length correct
Estimated cable length LogIn
Transmission type (e.g. MVAC) correct
Nominal voltage correct
Maximum voltage correct
Burial depth correct
Number of cores correct
Conductor type correct
Section correct
Insulation correct
Power rating correct
Number of fibre optics correct
Minimum bend radius (MBR) correct
Comments correct
Benefits Homes powered annually 8387 correct
CO2 reduced per year 16951 tonnes correct
SO2 reduced per year 394 tonnes correct
Expected life 25.0 years correct