brings
Hywind 2 Demonstration (Maine)
15 MW Cancelled United States

"The team at 4C Offshore offer an excellent service - The team are very approachable and deal with any queries quickly and efficiently"

Barry Stolp, Marketing Manager IHC Hydrohammer

  • All Projects
  • Followed Projects
Filter :
123456
StatusName
Decommissioned Keuka 1:125 scale 150kW Rim Drive Prototype
Fully Commissioned DeepCwind Consortium - VolturnUS - Dyces Head Test Site
Consent Authorised Block Island Wind Farm
Consent Authorised Cape Wind
Consent Authorised Fishermen's Atlantic City Windfarm Phase I
Consent Authorised Offshore Wind Power Systems of Texas Titan Platform
Consent Application Submitted Long Island New York City Offshore Wind Project Phase 1
Consent Application Submitted Virginia Offshore Wind Technology Advancement Project
Concept/Early Planning Arcadia Offshore Massachusetts (Massachusetts Call Response)
Concept/Early Planning Bluewater Wind (New Jersey Call Response)
Concept/Early Planning Condor Wind Energy Mass Call Response (Massachusetts Call Response(Also RFI))
Concept/Early Planning Deepwater ONE
Concept/Early Planning Deepwater Wind New England (Massachusetts Call Response)
Concept/Early Planning Energy Managament Inc(Long Island New York)
Concept/Early Planning Energy Management (Massachusetts Call Response(Also RFI))
Concept/Early Planning enXco Development Corporation (Massachusetts Call Response)
Concept/Early Planning enXco Development Corporation (New Jersey Call Response)
Concept/Early Planning First State Marine Wind
Concept/Early Planning Fishermen's Energy (Massachusetts Call Response(Also RFI))
Concept/Early Planning Fishermen's Energy (New Jersey Call Response)
Concept/Early Planning Fishermen's Energy(Long Island New York)
Concept/Early Planning Galveston Offshore Wind Phase 1
Concept/Early Planning Galveston Offshore Wind Phase 2
Concept/Early Planning Garden State Offshore Energy (New Jersey Call Response)
Concept/Early Planning Georgia Interim Policy Lease Areas
Concept/Early Planning Hampton Roads Demonstration Project
Concept/Early Planning Hudson Canyon
Concept/Early Planning Iberdrola Renewables (Massachusetts Call Response(Also RFI))
Concept/Early Planning Iberdrola Renewables (New Jersey Call Response)
Concept/Early Planning Icebreaker
Concept/Early Planning Keuka 12.5MW Rim Drive Prototype
Concept/Early Planning Keuka 300kW Rim Drive Prototype
Concept/Early Planning Lake Erie Alternative Power
Concept/Early Planning Long Island New York City Offshore Wind Project Phase 2
Concept/Early Planning Maine Aqua Ventus I
Concept/Early Planning Maine Aqua Ventus II
Concept/Early Planning Maine Aqua Ventus III
Concept/Early Planning MAKANI Airborne Wind Turbine(AWT)
Concept/Early Planning Michigan Offshore Wind Pilot Project
Concept/Early Planning Nautica Windpower- Advanced Floating Turbine (AFT)
123456
Please LogIn to follow projects
Search for Projects or Companies

Latest Windfarm News
WTG transport and installation deal
Maritime Journal
Dudgeon Offshore Wind Limited, which holds the licenses and consents to enable it to construct the Dudgeon offshore wind farm, is owned by two Norwegian companies, Statoil and Statkraft, and Abu Dhabi's renewable energy company, Masdar. Statoil holds ...
Source: news.google.com
20/10/2014 15:24:45

Work Starts on Kentish Flats Offshore Extension
Industrialinfo.com (subscription)
GALWAY, IRELAND--October 20, 2014 --Written by Martin Lynch, European News Editor for Industrial Info (Galway, Ireland) Work will start this week on the €207 million ($264 million) extension to the Kentish Flats offshore windfarm in the U.K.. Owner ...
Source: news.google.com
20/10/2014 13:00:16

Investigating The Environmental Impact Of Offshore Wind Farms
CleanTechnica
Despite my well-publicised love for offshore wind farms and wind technology in general, the reality is that pursuing such a technology to the detriment of the environment almost completely undermines the supposed benefits we reap from such renewable ...
Source: news.google.com
20/10/2014 12:25:08

U.K. Green Investment Bank's Wind Fund Raise 'Going Well'
Bloomberg
The U.K. Green Investment Bank is set to tie up the first investments in a $1.6 billion fund by the end of March, part of Britain's push to cement its dominance in offshore wind power. The lender has interest from two potential cornerstone investors, each for ...
Source: news.google.com
20/10/2014 11:30:26

Spotlight shines on the Humber's offshore wind activities
Grimsby Telegraph
CHANGING TIDE: The rapidly changing face of Grimsby Fish Docks, or Port of Grimsby East, where up to 50 boats are now serving the renewable energy industry. Half of the UK's current offshore wind farm construction is taking place out of Grimsby, with ...
Source: news.google.com
20/10/2014 09:47:59

2 Sembcorp Marine subsidiaries awarded contracts worth S$222m
Channel News Asia
One of its units, Sembmarine SLP, has been awarded a contract by Siemens Transmission & Distribution to design and build the offshore substation platform for the Dudgeon Offshore Wind Farm. Meanwhile, Sembmarine's other subsidiary Jurong Shipyard ...
Source: news.google.com
20/10/2014 09:32:40

A2SEA signs contract for Dudgeon offshore wind farm
Renewable Energy Magazine (press release)
Danish installation contractor A2SEA will install 67 Siemens 6MW turbines at Dudgeon Offshore Wind Farm, located off the coast of the seaside town of Cromer in North Norfolk, using their specialist, purpose-built, offshore installation vessel Sea Installer.
Source: news.google.com
20/10/2014 09:06:33

A2SEA wins contract to support Dudgeon offshore wind farm in UK
CleanTechnology News, Industry Analysis, Market Research Reports - Clean Technology Business Review
"We are very pleased to continue our cooperation and partnership with Statoil for installation of turbines, which started on their first offshore wind project Sheringham Shoal, and now continues on the Dudgeon project." The Dudgeon wind farm, which is ...
Source: news.google.com
20/10/2014 06:36:19

SMM bags double order
TradeWinds
In a second deal Sembmarine SLP Ltd, which is 70% owned by Sembcorp Marine, has won the contract to design and build the offshore substation platform for the UK's Dudgeon Offshore Wind Farm. The contract has been granted by Siemens Transmission ...
Source: news.google.com
20/10/2014 03:39:27




4C Offshore Ltd. has achieved certification to the ISO 9001, ISO 14001 and OHSAS 18001 standards for quality, environmental, and health & safety management.
map not available
Developers/Owners/Operators
RoleOrganisation 
Developer
Statoil North America (Statoil ASA)
correct
Owner
Statoil North America (Statoil ASA)
correct
Project Details for Hywind 2 Demonstration (Maine)
General Information Name Hywind 2 Demonstration (Maine) correct
Other names Hywind Maine Pilot, Boothbay Harbor correct
Country name United States correct
Region Maine correct
Comments Statoil intends to build upon the Hywind Demo experience in Norway, expand economies of scale, and further optimise the Hywind technological concept through the installation and operation of a multi turbine offshore wind park that incorporates larger turbine units.

It is more likely that the project will consist of four 3MW turbines, according to a presentation given in Q2 2013 by the American Wind Energy Association this will be the case.

One of seven projects selected for Offshore Wind Advanced Technology Demonstration Projects(OWATDP) initiative. Three of the seven will be selected to receive $47 funding.
correct
Round (or category) OWATDP, Unsolicited Lease Application, Maine RFI, correct
Development status Cancelled correct
Comments on the status In July 2013 Statoil has put the project on hold after new Maine legislation created uncertainty regarding on the final approval being given. The legislation reopens competition and allows the University of Maine to submit a rival bid.

BOEM issued the Request for Interest (RFI) as well as the Notice of Intent (NOI) to prepare an Environmental Impact Statement for the Statoil Project in the Federal Register in August 2012. The BOEM Notice of Determination of No Competitive Interest for the area requested by Statoil North America for a commercial lease was published in the Federal Register on December 19, 2012.

The next step consists of the publication of the Determination of No Competitive Interest (DNCI) by BOEM in the Federal Register. Then, the applicant (Statoil NA) has to submit the Constructions and Operations Plan (COP) and BOEM will analyse lease issuance and COP approval under NEPA and other laws (conduct EIS).
correct
Power & Turbines Notice any Errors? You can keep this an open resource by submitting corrections!
Project Capacity 12 MW - 15 MW correct
Turbine Model Not Decided correct
Turbine Capacity 3 MW correct
Number of Turbines 4 correct
Total Turbine Height correct
Hub Height correct
Rotor Diameter correct
Foundation Floating: Spar Floater correct
Windspeed 10 Year Mean Wind Speed (2000-2009) Available online now
Detailed wind speed data 6 hr/day/month historic data
Costs Stated Project Cost USD(mill) 120.00 correct
Location & Environment Sea name Atlantic Ocean correct
Centre latitude 43.524° correct
Centre longitude -69.534° correct
Area 58 km2 correct
Depth range (Chart Datum) 122 m - 174 m correct
Depth range stated by developer 140 m - 158 m correct
Distance From Shore (reported) 20 km correct
Distance From Shore (computed from centre) 32 km correct
Ports Installation base correct
Ops and maintenance correct
Grid Converter platforms correct
Offshore transformers correct
Grid connection point correct
Cable landing point correct
Export Cables
Please note that export cables connect the offshore transformer (substation) to either; shore or an offshore HVAC-HVDC converter station for onward transmission via HVDC cabling. Please see the converters page for planned converter stations and transmission cables.

The export cable length does not generally include the onshore component. The exception is when the onshore substation is close to shore.
Number of Export Cables correct
Average length per cable correct
Transmission type (e.g. HVAC) correct
Nominal voltage correct
Maximum voltage correct
Power rating correct
Number of cores correct
Conductor type correct
Section Area correct
Insulation correct
Number fibre optics correct
Export minimum bend radius (MBR) correct
Burial depth correct
Comments correct
Onshore Cables Number of onshore cables correct
Average length per cable correct
Comments correct
Array Cables Array cable length correct
Estimated cable length LogIn
Transmission type (e.g. MVAC) correct
Nominal voltage correct
Maximum voltage correct
Burial depth correct
Number of cores correct
Conductor type correct
Section correct
Insulation correct
Power rating correct
Number of fibre optics correct
Minimum bend radius (MBR) correct
Comments correct
Benefits Homes powered annually 9785 correct
CO2 reduced per year 19776 tonnes correct
SO2 reduced per year 460 tonnes correct
Expected life 25.0 years correct
Other Website correct