4C Offshore Empowering Intelligence

Jiangsu Luneng Dongtai 200MW Concession Offshore Wind Farm

27 Feb 2019: The project archives passed the acceptance. A total of 1324 volumes of science and technology, audio and video, and electronic archives were formed. Jiangsu Guangheng New Energy Co., Ltd. compiled the implementation rules for project project archives management, and formed a project archive management plan with offshore wind power characteristics.
Location:
China
Status:
Fully Commissioned
Capacity:
200 MW
4C Offshore | Location Map: Lat(32.955) Lon(121.260)

Subscribers can track wind farms on their dashboard.

General Information
Name
Jiangsu Luneng Dongtai 200MW Concession
Other Names
鲁能江苏东台200兆瓦海上风电场项目 江苏东台海上风电场20万千瓦风电特许权项目 鲁能东台潮间带海上风电项目台(200MW)
Country
China
Development Status
Fully Commissioned
Category or Round
Unlock with a freemium account
Region
Unlock with a freemium account
Comments
Unlock with a freemium account
Website
Unlock with a freemium account

Developers/Owners/Operators
Type
Organisation

Developer

Jiangsu Guangheng New Energy Co., Ltd. (江苏广恒新能源有限公司)

Jiangsu Guangheng New Energy Co., Ltd. (江苏广恒新能源有限公司)

Operator

Jiangsu Guangheng New Energy Co., Ltd. (江苏广恒新能源有限公司)

Jiangsu Guangheng New Energy Co., Ltd. (江苏广恒新能源有限公司)

Owner

Shandong Luneng Group (鲁能集团有限公司)

Shandong Luneng Group (鲁能集团有限公司)

Owner

State Grid Corporation of China (国家电网)

State Grid Corporation of China (国家电网)


Offshore Construction Starts
Submitted For Consent
Consent Authorised
Financial Close
First Power
Full Commissioning
Unlock with a freemium account

Revenue Mechanism
Revenue Details
Revenue
/MWh (EUR /MWh)

How does the database work?

ForeSEE marine intelligence software provides you with exclusive access to a range of specialised services including the Global Offshore Wind Farm Database. ForeSEE grants you exclusive access to online and offline databases, reports, newsletters, online tools and more.

There are three levels of access: Free, Freemium and Full. Freemium allows you to personalise notifications, use the search function and access more data.

You will need Full access to use the ForeSEE interactive system, access reports, updates, news, downloads and more. To find out more about how ForeSEE software works and the benefits of Full access, enquire below.

Sign up to Freemium Enquire about ForeSEE
Power & Turbines
Windfarm Capacity
200 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
Eastern China Sea
Latitude
32.955097°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
1
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life