Kemi Ajos II
15 MW Fully Commissioned Finland
Updated weekly to include the latest news, your feedback and other data.
35 Countries, 1173 Windfarms, 7307 Stakeholders, 2711 Events, 161 Vessels, 131 Turbines NEW, 35 Ports,
Filter Projects by Country
Featured Ports
Featured Port
Able Seaton Port, United Kingdom Image of <%# Eval("PortName") %> Maximum Trenched Depth: 15 m
Entrance Width: 125 m
Spring Tidal Range: 4.6 m
Quay Length: 791 m
Quay Loading Capability: 60 tonnes/m2
Land for Development: 45 ha
More details...



Who is generating power
Who's Generating Power?
1.  United Kingdom - 1858.40 MW
2.  Denmark - 874.48 MW
3.  China - 351.00 MW
More...
Whose Turbines are Generating?
Whose Turbines are Generating?
1.  Siemens Wind Power A/S (Siemens AG) - 1522.00 MW
2.  Vestas Offshore A/S (Vestas Wind Systems A/S) - 1404.12 MW
3.  REpower Systems AG (Suzlon Energy Limited) - 250.00 MW
Loading Map
Vessels & Equipment Available for Immediate Charter
Statistics for Kemi Ajos II
Wind Farm Name Kemi Ajos II correct
CountryFinland
Region Lappi correct
SeaName Gulf of Bothnia correct
Centre Latitude 65.655°
Centre Longitude 24.512°
Did you know? Its easy to add a map with this windfarm to your website! More...
Round, tender or call 
Development Status Fully Commissioned correct
Comments on the StatusFully operational 2008. The total capacity of Kemi Ajos I and II is 30 MW (two turbines are installed onshore)
Status Documentation
Capacity 15 MW correct
Turbine Capacity 3 MW correct
Number of Turbines 5 correct
Turbine Model WWD-3-100 (WinWinD) correct
10 Year Mean Wind Speed (2000-2009) Available online now
Other wind speed data at this location: 6 hr/day/month historic data..., BERR, NERL
(Now incorporating NERL models for USA Projects!)
Weather Forecast Services Weather Solutions For Offshore Wind Power
Rotor Diameter 100 m correct
Total Turbine Height 138 m correct
Hub Height 88 m correct
Other comments correct
Foundation Grounded: Gravity-Base correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Area 1 km2
Water Depth Min (Chart Datum) 0 m correct
Water Depth Max (Chart Datum) 8 m correct
Depth range stated by developer correct
Distance From Shore (reported) 2.6 km correct
Distance From Shore (computed from wind farm centre) 6 km
Export Cable Length correct
Infield Cable Length correct
Estimated Infield Cable Length This information is available in the purchased database - please enquire.
Export Cable Capacity correct
Infield Cable Capacity 20 kV correct
Number of Export Cables correct
Export Cable Type correct
Cable Description correct
Number of Offshore Substations correct
Grid Connection Point correct
Cable Landing Point correct
Annual Capacity Factor 30.00 correct
Expected Life correct
Estimated Capital Cost (CapEx) This information is available in the purchased database - please enquire.
Stated Project Cost correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Port For Installation Base Ajos correct
Port For Ops and Maintenance correct
Number of homes powered annually: 8,387 homes
CO2 Reduced Per Year 16,951 tonnes
SO2 Reduced Per Year 394 tonnes
Website Visit correct

Events on Kemi Ajos II
DateTypeDescriptionSourceCorrect
31-Dec-2008
Event Type: Operation - Generating Power                                                                                                                                                                                                                                   Operation - Generating Power
Fully operational by end of 2008 Other correct
Aug-2008
Event Type: Installation - Turbine Installation                                                                                                                                                                                                                            Installation - Turbine Installation
Second phase of turbines erected late summer 2008 Other correct

Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.

Be the first to comment on Kemi Ajos II offshore wind farm Please note, your comment will take 1 hour to appear.

Your Name * :
Web Site (optional) : http://
Comment * :
* required


Weather Forecast for Kemi Ajos II More weather tools available on 4C Interactive Map. More weather forecast tools