Laoting Bodhi Island Offshore Wind Power Demonstration 300MW Project
300 MW Consent Application Submitted China
Updated weekly to include the latest news, your feedback and other data.
35 Countries, 1173 Windfarms, 7307 Stakeholders, 2711 Events, 161 Vessels, 131 Turbines NEW, 35 Ports,
Filter Projects by Country
123
StatusName
Fully Commissioned Chenjiagang Xiangshui intertidal Project
Fully Commissioned Dafeng Intertidal Demonstration
Fully Commissioned Donghai Bridge 100 MW offshore wind power demonstration project
Fully Commissioned Huaneng Rongcheng Power Prototype Demonstration Project
Fully Commissioned Longyuan Rudong Intertidal Demonstration Project
Fully Commissioned Suizhong 36-1 Oil Field
Fully Commissioned Xiangshui Intertidal Pilot Project - Goldwind
Fully Commissioned Xiangshui Intertidal Pilot Project - Turbine 3
Fully Commissioned Xiangshui Intertidal Pilot Project- Shanghai Electric
Partial Generation/Under Construction Rudong Intertidal I Development Zone
Partial Generation/Under Construction Rudong Intertidal III Development Zone
Under Construction Bin Hai Offshore Concession Project
Under Construction Da Feng Intertidal Concession Project
Under Construction Datang Laizhou Wind Farm Phase III
Under Construction Dong Tai Intertidal Concession Project
Under Construction Donghai Bridge Offshore Wind Farm Phase II (Extension) project
Under Construction GD Leizhou East 49.5MW Wind Farm Project
Under Construction Guangdong Yudean - Xuwen offshore wind power demonstration project
Under Construction Huaneng Rongcheng Power Project
Under Construction Nuhai
Under Construction Sheyang Offshore Concession Project
Under Construction Xiangshui Offshore Demonstation Project
Under Construction Zhuhai Guishan Hai Demonstration Project
Consent Authorised Beibu Gulf offshore wind power project Beibu Gulf offshore wind power project
Consent Authorised Binhai Offshore Phase I - 300MW
Consent Authorised China Guangdong Nuclear Power Daishan 4 offshore wind farm
Consent Authorised China Guangdong Nuclear Power East China Sea
Consent Authorised CNOOC Weihai - phase I
Consent Authorised CNOOC Weihai - Roncheng - Northern Block
Consent Authorised CPI Jiangsu Dafeng offshore wind farm demonstration project (200MW intertidal)
Consent Authorised Dagang Intertidal
Consent Authorised Dongtai wind farm stage 3
Consent Authorised Fuqing Haitan Strait Intertidal wind farm
Consent Authorised Ganyu
Consent Authorised HEC Offshore Wind Farm
Consent Authorised Hong Kong Offshore Wind Farm
Consent Authorised Huadian Yuhuan Offshore Wind Farm - Phase 1
Consent Authorised Huaneng Dafeng Intertidal C4 Wind Power Demonstration Project
Consent Authorised Kaomen Haitang
Consent Authorised Linhai Offshore Wind Farm
123
Featured Ports
Featured Port
Port of Wilhelmshaven, Germany Image of <%# Eval("PortName") %> Maximum Trenched Depth: 18 m
Entrance Width: 60 m
Spring Tidal Range: 3.5 m
Quay Length: 5377 m
Quay Loading Capability: 84 tonnes/m2
Land for Development: 59 ha
More details...



Who is generating power
Who's Generating Power?
1.  United Kingdom - 1858.40 MW
2.  Denmark - 874.48 MW
3.  China - 351.00 MW
More...
Whose Turbines are Generating?
Whose Turbines are Generating?
1.  Siemens Wind Power A/S (Siemens AG) - 1522.00 MW
2.  Vestas Offshore A/S (Vestas Wind Systems A/S) - 1404.12 MW
3.  REpower Systems AG (Suzlon Energy Limited) - 250.00 MW
Loading Map
Vessels on Laoting Bodhi Island Offshore Wind Power Demonstration 300MW Project
Vessels & Equipment Available for Immediate Charter
Statistics for Laoting Bodhi Island Offshore Wind Power Demonstration 300MW Project
Wind Farm Name Laoting Bodhi Island Offshore Wind Power Demonstration 300MW Project (also known as Leting Offshore Wind Power Demonstration Project 乐亭海上风电示范) correct
CountryChina
Region Hebei correct
SeaName Bohai Sea correct
Centre Latitude 39.101° (Note: Estimated/Illustrative Location)
Centre Longitude 118.870° (Note: Estimated/Illustrative Location)
Did you know? Its easy to add a map with this windfarm to your website! More...
Round, tender or call 
Development Status Consent Application Submitted correct
Comments on the Status 
Status Documentation
Capacity 300 MW correct
Turbine Capacity 3 MW correct
Number of Turbines 100 correct
Turbine Model Unknown, possible Tianwei whose prototype was installed in 2011 and will be manufactured in Hebei correct
10 Year Mean Wind Speed (2000-2009) Available online now
Other wind speed data at this location: 6 hr/day/month historic data..., BERR, NERL
(Now incorporating NERL models for USA Projects!)
Weather Forecast Services Weather Solutions For Offshore Wind Power
Rotor Diameter correct
Total Turbine Height correct
Hub Height correct
Other comments correct
Foundation Unknown correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Area
Water Depth Min (Chart Datum) correct
Water Depth Max (Chart Datum) correct
Depth range stated by developer 10 m - 30 m correct
Distance From Shore (reported) 18 km correct
Distance From Shore (computed from wind farm centre)
Export Cable Length correct
Infield Cable Length correct
Estimated Infield Cable Length This information is available in the purchased database - please enquire.
Export Cable Capacity correct
Infield Cable Capacity correct
Number of Export Cables correct
Export Cable Type correct
Cable Description correct
Number of Offshore Substations correct
Grid Connection Point correct
Cable Landing Point correct
Annual Capacity Factor correct
Expected Life correct
Estimated Capital Cost (CapEx) This information is available in the purchased database - please enquire.
Stated Project Cost CNY(mill) 5762.00 correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Port For Installation Base correct
Port For Ops and Maintenance Leting Puti correct
Number of homes powered annually: 167,745 homes
CO2 Reduced Per Year 339,012 tonnes
SO2 Reduced Per Year 7,884 tonnes
Website No Website correct

Events on Laoting Bodhi Island Offshore Wind Power Demonstration 300MW Project
DateTypeDescriptionSourceCorrect
Subscribe
Event Type: Operation - Generating Power                                                                                                                                                                                                                                   Operation - Generating Power
The project will be fully commissionedby the end of Subscribe Subscribe correct
Subscribe
Event Type: Installation - Offshore Construction Starts                                                                                                                                                                                                                    Installation - Offshore Construction Starts
Construction expected to start first half of Subscribe Subscribe correct
31-Dec-2012
Event Type: Planning - Consent Authorised                                                                                                                                                                                                                                  Planning - Consent Authorised
The approving authority will complete the approval procedure. Visit correct
18-Nov-2011
Event Type: PrePlanning - Feasibility Study                                                                                                                                                                                                                                PrePlanning - Feasibility Study
A feasibility report was passed. Commissioned by National Energy Bureau (NEB). Visit correct
24-Jul-2011
Event Type: Planning - Site Investigation                                                                                                                                                                                                                                  Planning - Site Investigation
Geotechnical survey Visit correct
06-Sep-2010
Event Type: Installation - Met Mast                                                                                                                                                                                                                                        Installation - Met Mast
Met Mast installed Visit correct

Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.

Be the first to comment on Laoting Bodhi Island Offshore Wind Power Demonstration 300MW Project offshore wind farm Please note, your comment will take 1 hour to appear.