Leamington Extension
100 MW Consent Application Submitted Canada
Updated weekly to include the latest news, your feedback and other data.
35 Countries, 1173 Windfarms, 7307 Stakeholders, 2711 Events, 161 Vessels, 131 Turbines NEW, 35 Ports,
Filter Projects by Country
Featured Ports
Featured Port
Port of Aalborg, Denmark Image of <%# Eval("PortName") %> Maximum Trenched Depth: 9.3 m
Entrance Width: 110 m
Spring Tidal Range: 0.3 m
Quay Length: 200 m
Quay Loading Capability: 42 tonnes/m2
Land for Development: 300 ha
More details...



Who is generating power
Who's Generating Power?
1.  United Kingdom - 1858.40 MW
2.  Denmark - 874.48 MW
3.  China - 351.00 MW
More...
Whose Turbines are Generating?
Whose Turbines are Generating?
1.  Siemens Wind Power A/S (Siemens AG) - 1522.00 MW
2.  Vestas Offshore A/S (Vestas Wind Systems A/S) - 1404.12 MW
3.  REpower Systems AG (Suzlon Energy Limited) - 250.00 MW
Loading Map
RoleOrganisationDescription 
Developer Southpoint Wind correct
Owner Southpoint Wind
Percentage: Subscribe
correct
Vessels on Leamington Extension
Vessels & Equipment Available for Immediate Charter
Statistics for Leamington Extension
Wind Farm Name Leamington Extension correct
CountryCanada
Region Ontario correct
SeaName Lake Erie correct
Centre Latitude 41.986°
Centre Longitude -82.590°
Did you know? Its easy to add a map with this windfarm to your website! More...
Round, tender or call 
Development Status Consent Application Submitted (Note: Project on hold) correct
Comments on the StatusOntario is not proceeding with offshore wind projects until further scientific research has been conducted on freshwater offshore wind farms. Current applications for FiT's are suspended and new applications are suspended. Project halted until a review of the use of the lake floor has been completed. Original plans were to start construction in 2012.
Status Documentation The Requirements For Offshore Wind
Capacity 100 MW correct
Turbine Capacity 2 MW correct
Number of Turbines 50 correct
Turbine Model DeWind D8.2 2000KW (DeWind) correct
10 Year Mean Wind Speed (2000-2009) Available online now
Other wind speed data at this location: 6 hr/day/month historic data..., BERR, NERL
(Now incorporating NERL models for USA Projects!)
Weather Forecast Services Weather Solutions For Offshore Wind Power
Rotor Diameter 80 m correct
Total Turbine Height 120 m correct
Hub Height 80 m correct
Other comments Extension to earlier proposed pilot applications, see Leamington Pilot. They are three projects with a pilot and an extension and 10 that will have 2 phases. Although if any get permission, they will work in the same manner. Namely, a 1st phase of 5 turbines then a 2nd phase of 50 turbines. correct
Foundation Not Decided correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Area 5 km2
Water Depth Min (Chart Datum) 8 m correct
Water Depth Max (Chart Datum) 10 m correct
Depth range stated by developer correct
Distance From Shore (reported) 1.5 km correct
Distance From Shore (computed from wind farm centre) 2.6 km
Export Cable Length correct
Infield Cable Length correct
Estimated Infield Cable Length This information is available in the purchased database - please enquire.
Export Cable Capacity 27 kV correct
Infield Cable Capacity correct
Number of Export Cables 1 correct
Export Cable Type correct
Cable Description correct
Number of Offshore Substations correct
Grid Connection Point correct
Cable Landing Point correct
Annual Capacity Factor correct
Expected Life correct
Estimated Capital Cost (CapEx) This information is available in the purchased database - please enquire.
Stated Project Cost correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Port For Installation Base correct
Port For Ops and Maintenance correct
Number of homes powered annually: 55,915 homes
CO2 Reduced Per Year 113,004 tonnes
SO2 Reduced Per Year 2,628 tonnes
Website Visit correct

Events on Leamington Extension
No Life Cycle Events for this wind farm. Possible events include consent submission, approval, installation, generating power etc.

Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc. Challenges experienced on Leamington Extension
Be the first to comment on Leamington Extension offshore wind farm Please note, your comment will take 1 hour to appear.

Your Name * :  
Web Site (optional) : http://  
Comment * :  
* required


Weather Forecast for Leamington Extension More weather tools available on 4C Interactive Map. More weather forecast tools