Lincs
270 MW
Updated weekly to include the latest news, your feedback and other data.
35
Countries,
1173
Windfarms
,
7307
Stakeholders,
2711
Events,
161
Vessels
,
131
Turbines
NEW
,
35
Ports
,
Subscribe!
Filter Projects by Country
Albania
Azerbaijan
Bangladesh
Belgium
Brazil
Canada
China
Croatia
Denmark
Estonia
Finland
France
Germany
Greece
India
Ireland
Italy
Japan
Latvia
Lithuania
Maldives
Malta
Netherlands
Norway
Poland
Portugal
Romania
Russia
South Korea
Spain
Sweden
Taiwan
Tunisia
United Kingdom
United States
1
2
3
4
Status
Name
Barrow
Beatrice Demonstration
Blyth
Burbo Bank
Gunfleet Sands I + II
Inner Dowsing
Kentish Flats
Lynn
North Hoyle
Ormonde
Rhyl Flats
Robin Rigg
Scroby Sands
Thanet
Walney Phase 1
Walney Phase 2
Greater Gabbard
Sheringham Shoal
Gwynt y Môr
Lincs
London Array Phase 1
Teesside
2-B Energy Test Site
Gunfleet Sands 3 - Demonstration Project
Humber Gateway
Hunterston Test Site
London Array Phase 2
West of Duddon Sands
Westermost Rough
Beatrice
Docking Shoal
Dudgeon
European Offshore Wind Deployment Centre - EOWDC
Galloper Wind Farm
Kentish Flats Extension
NaREC Offshore Wind Demonstration Project
Race Bank
Triton Knoll Phase One
Triton Knoll Phase Three
Triton Knoll Phase Two
1
2
3
4
Featured Port
Vlissingen - Verbrugge Terminals, The Netherlands
Maximum Trenched Depth: 13.3 m
Entrance Width: 372 m
Spring Tidal Range: 5 m
Quay Length: 1200 m
Quay Loading Capability: 15 tonnes/m
2
Land for Development: 70 ha
More details...
Offshore Wind Ports
Able Humber Port
Able Middlesbrough Port
Able Seaton Port
BOW Terminal Vlissingen
EastPort UK
Harwich Navyard
Port of Aalborg
Port of Wilhelmshaven
Vlissingen - Verbrugge Terminals
More ports...
Who's Generating Power?
1.
United Kingdom
-
1858.40 MW
2.
Denmark
-
874.48 MW
3.
China
-
351.00 MW
More...
Whose Turbines are Generating?
1.
Siemens Wind Power A/S (Siemens AG)
-
1522.00 MW
2.
Vestas Offshore A/S (Vestas Wind Systems A/S)
-
1404.12 MW
3.
REpower Systems AG (Suzlon Energy Limited)
-
250.00 MW
Subscribe!
This is the 1st latest news item.
This is the 2nd latest news item.
This is the 3rd latest news item.
This is the 4th latest news item.
Developers/Owners/Operators
Database as Excel
|
Add Your Organisation
|
Check Your 4C Entries
Role
Organisation
Description
Developer
Renewable Energy Systems (RES) Ltd
Centrica retained RESs services under the buy out agreement.
Developer
Lincs Wind Farm Limited
Development company owned by centrica,DONG and Siemens, through the their subsiduaries "Centrica (Lincs) Wind Farm Limited" and "Lincs Renewable Energy Holdings Limited". Centrica will continue to lead development and operation
Owner
Siemens Project Ventures GmbH
(Siemens AG)
25% Stakeholder after purchasing 50% holding in wind farm with partner DONG Energy, from Centrica. "Lincs Renewable Energy Holdings Limited" set up by DONG and Siemens for stake joint holding.
Value:
Subscribe
Percentage:
Subscribe
Owner
Centrica Renewable Energy Limited
(Centrica Renewable Energy Limited)
50% Stakeholder after selling 50% to DONG energy and Siemens Project Ventures. Centrica acquired the Lincs project in 2003 from wind farm developer Renewable Energy Systems. "Centrica (Lincs) Wind Farm Limited" company set for centrica's share of project
Percentage:
Subscribe
Owner
DONG Wind (UK) Limited
(DONG energy)
25% Stakeholder after purchasing 50% holding in wind farm with partner Siemens Project Ventures, from Centrica. "Lincs Renewable Energy Holdings Limited" set up by DONG and Siemens for stake joint holding.
Value:
Subscribe
Percentage:
Subscribe
Owner-Offshore Transmission
Transmission Capital Limited
The preferred bidder to own and operate the offshore links.
Value:
Subscribe
Click here to view the Supply Chain!
Vessels on Lincs
Database as Excel
|
Add Your Vessels
|
Check Your Vessels
1
2
3
Vessel
Role
Organisation
Description
Correct
CLV SIA (formally the Claymore)
Vessel-Array Cable Installation
CT Offshore
The Sia performed array cable installation.
More...
UR101
Vessel-Array Cable Installation(burial)
Ugland Construction AS
Period: 10-Oct-2011 to 31-Dec-2012
UR101 used with plough to install 5 array cables(as of 15/02/12) - Client: Technip
More...
UR101
Vessel-Array Cable Installation(cable lay)
Ugland Construction AS
Period: 10-Oct-2011 to 31-Dec-2012
UR101 used with plough to install 4 array cables(as of 15/02/12) - Client: Technip
More...
Fastnet Swift
Vessel-Crew Transfer
Fastnet Shipping Limited
The Fasnet Swift is providing crew transfers.
Fastnet Skua
Vessel-Crew Transfer
Fastnet Shipping Limited
The Fasnet Skua is providing crew transfers.
JB-114
Vessel-Engineering
Jack Up Barges B.V.
The JB 114 performed drilling at the site.
More...
CLV NICO
Vessel-Export Cable Installation(burial)
CT Offshore
Period: 19-Dec-2011
Post-lay burial at exposed points on export cables, as part of contract with - Client: Technip
More...
Nessie V
Vessel-Export Cable Installation(burial)
CHRISTOFFERS Onshore and Subsea GmbH
Nessie V trencher used to bury cable from Sea defence to 1km out
More...
Nessie III
Vessel-Export Cable Installation(burial)
CHRISTOFFERS Onshore and Subsea GmbH
Nessie III trencher used for cable burial from kp1 to kp8
More...
AMT Discoverer
Vessel-Export Cable Installation(burial)
Anchor Marine Transportation Limited
AMT Discoverer used for cable lay and burial with plough of the two 48km export cables from substation to point 8km from shore - Client: Technip
More...
1
2
3
Vessels & Equipment Available for Immediate Charter
Statistics for Lincs
Database in Excel
Wind Farm Name
Lincs
Country
United Kingdom
Region
Greater Wash
SeaName
North Sea
Centre Latitude
53.191°
Centre Longitude
0.491°
Did you know?
Its easy to add a map with this windfarm to your website! More...
Round, tender or call
Round 2
Development Status
Under Construction
Comments on the Status
See events table for latest status
Status Documentation
Capacity
270 MW
Turbine Capacity
3.6 MW
Number of Turbines
75
Turbine Model
SWT-3.6-120 (Siemens)
10 Year Mean Wind Speed (2000-2009)
Available online now
Other wind speed data at this location:
6 hr/day/month historic data..., BERR, NERL
(Now incorporating NERL models for USA Projects!)
Weather Forecast Services
Weather Solutions For Offshore Wind Power
Rotor Diameter
120 m
Total Turbine Height
160 m
Hub Height
100 m
Other comments
Hub height is estimated after turbine model upgrade
Foundation
Grounded: Monopile
Notice any Errors?
Please help keep this an open and free resource by submitting corrections.
Area
41 km
2
Water Depth Min (Chart Datum)
7 m
Water Depth Max (Chart Datum)
12 m
Depth range stated by developer
10 m - 15 m
Distance From Shore (reported)
8 km
Distance From Shore (computed from wind farm centre)
9.1 km
Export Cable Length
47.5 km
Infield Cable Length
85.3 km
Estimated Infield Cable Length
This information is available in the purchased database - please enquire.
Export Cable Capacity
132 kV
Infield Cable Capacity
33 kV
Number of Export Cables
2
Export Cable Type
2 x 145 kV XLPE subsea power cables
Cable Description
64km of 3core 185mm² and 20.5km of 3 core 630mm²
Number of Offshore Substations
1
Grid Connection Point
Walpole
Cable Landing Point
Sutton Bridge
Annual Capacity Factor
Expected Life
20 years
Estimated Capital Cost (CapEx)
This information is available in the purchased database - please enquire.
Stated Project Cost
GBP(mill) 725.00
Notice any Errors?
Please help keep this an open and free resource by submitting corrections.
Port For Installation Base
Great Yarmouth and Hull
Port For Ops and Maintenance
Grimsby
Number of homes powered annually:
150,970 homes
CO2 Reduced Per Year
305,111 tonnes
SO2 Reduced Per Year
7,096 tonnes
Website
Visit
Events on Lincs
Database in Excel
1
2
Date
Type
Description
Source
Correct
Subscribe
Operation - Generating Power
Originally expected
Subscribe
but the project is expected to see delays.
Subscribe
Oct-2012
Installation - Cable installation
The array cabling installation was scheduled to finish in Q1 2012. However the installation started later in the year therefore the finish date has been delayed.
Visit
30-Sep-2012
Installation - Turbine Installation
The turbine installation is scheduled to end in Q3 2012.
Visit
31-Mar-2012
Installation - Foundation Installation
The foundation installation is scheduled to finish in Q1 2012.
Visit
22-Feb-2012
Planning - Financial Close
Reach financial close.
Visit
15-Jan-2012
Installation - Foundation Installation
48 of the foundations have been installed.
Visit
2012
Installation - Turbine Installation
The turbine installation is scheduled to start in Q1 2012.
Visit
31-Dec-2011
Installation - Cable installation
The export cabling installation is scheduled to finish in Q4 2011.
Visit
19-Dec-2011
Installation - Cable installation
As of this date: 2 x export cables installed (but with some extra burial needed, to be performed by CT Offshore's Nico)
Other
19-Dec-2011
Installation - Foundation Installation
As of this date: 41 foundations and transition pieces installed. Works ongoing around offshore substation.
Other
1
2
Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.
Challenges experienced on Lincs
Date
Problem
Category
31-Mar-09
Astronomical cost hold up Lincs wind farm
Be the first to comment on Lincs offshore wind farm
Please note,
your comment will take 1 hour to appear
.
Your Name *
:
Please provide your name
Web Site (optional)
:
http://
Invalid website (omit http://)
Comment *
:
Please provide a comment
* required
<< Newer Comments
Older Comments >>
Weather Forecast for Lincs
More weather tools available on 4C Interactive Map.