Longyuan Rudong Intertidal Trial Wind Farm
32 MW Fully Commissioned China

"The team at 4C Offshore offer an excellent service - The team are very approachable and deal with any queries quickly and efficiently"

Barry Stolp, Marketing Manager IHC Hydrohammer

  • All Projects
  • Followed Projects
Filter :
1234
StatusName
Fully Commissioned Dafeng (Shanghai Electric) Intertidal Demonstration Turbine
Fully Commissioned Datang Laizhou Wind Farm Phase III
Fully Commissioned DDHI Composite Bucket Foundation Test Project
Fully Commissioned Donghai Bridge 100 MW offshore wind power demonstration project
Fully Commissioned Guodian United Power 6MW Prototype
Fully Commissioned Huaneng Rongcheng Power Prototype Demonstration Project
Fully Commissioned Jiangsu Rudong 150MW Offshore (Intertidal) Demonstration Wind Farm - extension
Fully Commissioned Jiangsu Rudong 150MW Offshore (Intertidal) Demonstration Wind Farm - phase I
Fully Commissioned Jiangsu Rudong 150MW Offshore (Intertidal) Demonstration Wind Farm - phase II
Fully Commissioned Longyuan Rudong Intertidal Trial Wind Farm
Fully Commissioned Rudong Zhongshui ( intertidal ) 100MW demonstration project - phase 1
Fully Commissioned Suizhong 36-1 Oil Field
Fully Commissioned Xiangshui Intertidal Pilot Project - Goldwind - GW 100/2500
Fully Commissioned Xiangshui Intertidal Pilot Project - Goldwind GW3000kW + DEC FD119A
Fully Commissioned Xiangshui Intertidal Pilot Project - Shanghai Electric - SEC2000
Fully Commissioned Xiangshui Intertidal Pilot Project - Shanghai Electric - W2000M-93-70
Fully Commissioned Zhongmin Fujian XEMC Test Turbine(Nearshore)
Partial Generation/Under Construction Longyuan Rudong Intertidal Trial Wind Farm -Extension
Partial Generation/Under Construction Tianjin Dagang Binhai 33MW Intertidal wind farm
Under Construction Jiangsu Longyuan Dafeng Offshore Wind Farm -phase 1
Under Construction Binhai Offshore Concession Project
Under Construction CGN Rudong offshore demonstration project
Under Construction Changxing Floating Modular Foundation Demonstration Project
Under Construction Donghai Bridge Offshore Wind Farm Phase II (Extension) project
Under Construction Guangdong Yudean - Xuwen offshore wind power demonstration project
Under Construction Huaneng Rongcheng Power Project
Under Construction Jiangsu Dongtai Offshore Wind Farm Concession Project
Under Construction Jiangsu Rudong Intertidal Demonstration Wind Farm -Extension
Under Construction Longyuan Putian Nanri Island 400MW project - Phase 1 - 16 MW Prototype
Under Construction Rudong Zhongshui ( intertidal ) 100MW demonstration project - phase 2
Under Construction Shanghai Lingang offshore wind farm demonstration project (phase 1)
Under Construction Zhuhai Guishan Offshore Wind Farm Demonstration Project
Consent Authorised Beibu Gulf offshore wind power project
Consent Authorised CGN Daishan 4 offshore wind farm
Consent Authorised CNOOC Weihai - phase I
Consent Authorised CNOOC Weihai - Roncheng - Northern Block
Consent Authorised CPI Jiangsu Dafeng offshore wind farm demonstration project (200MW intertidal)
Consent Authorised Fengxian
Consent Authorised Fengxian Large Scale
Consent Authorised Fuqing Haitan Strait Intertidal wind farm
1234
Please LogIn to follow projects
Search for Projects or Companies

Latest Windfarm News


4C Offshore Ltd. has achieved certification to the ISO 9001, ISO 14001 and OHSAS 18001 standards for quality, environmental, and health & safety management.
map not available
Developers/Owners/Operators
Project Details for Longyuan Rudong Intertidal Trial Wind Farm
General Information Name Longyuan Rudong Intertidal Trial Wind Farm correct
Other names 龙源电力30MW潮间带试验风电场 correct
Country name China correct
Region Jiangsu, Nantong, Rudong correct
Comments Project uses turbines from 9 domestic manufacturers as a testing ground for future developments. correct
Round (or category) correct
Development status Fully Commissioned correct
Comments on the status All turbines have been installed correct
Power & Turbines Notice any Errors? You can keep this an open resource by submitting corrections!
Project Capacity 32 MW correct
Turbine Model United Power UP82-1500 x 2 MingYang MY1.5 x 2 SEwind W2000M x 2 Envision EN-82/1.5MW x 2 Sany SE9320III-S3 x 1 Sinovel SL3000/113 x 1 Goldwind 1.5MW x 1 Goldwind 2.5MW x 1 MingYang MY3.0 SCD x 1 Haizhuang 2MW x 1 BaoNan BN82-2000 x 1 correct
Turbine Capacity correct
Number of Turbines 16 correct
Total Turbine Height correct
Hub Height correct
Rotor Diameter correct
Foundation Grounded: High-Rise Pile Cap (One of Minyang, one of UP, Envision and SE used Buried and anchored concrete base, One of UP use Pentapile base, Sinovel used Heptapile base, the other used hexapile) correct
Windspeed 10 Year Mean Wind Speed (2000-2009) Available online now
Detailed wind speed data 6 hr/day/month historic data
Costs Stated Project Cost CNY(mill) 500.00 correct
Location & Environment Sea name East China Sea correct
Centre latitude 32.563° correct
Centre longitude 121.087° correct
Area 107 km2 correct
Depth range (Chart Datum) correct
Depth range stated by developer correct
Distance From Shore (reported) 3 km correct
Distance From Shore (computed from centre) 4.2 km correct
Ports Installation base correct
Ops and maintenance correct
Grid Converter platforms None correct
Offshore transformers None correct
Grid connection point correct
Cable landing point correct
Export Cables
Please note that export cables connect the offshore transformer (substation) to either; shore or an offshore HVAC-HVDC converter station for onward transmission via HVDC cabling. Please see the converters page for planned converter stations and transmission cables.

The export cable length does not generally include the onshore component. The exception is when the onshore substation is close to shore.
Number of Export Cables correct
Average length per cable correct
Transmission type (e.g. HVAC) MVAC correct
Nominal voltage 35 kV correct
Maximum voltage correct
Power rating correct
Number of cores 3 correct
Conductor type Cu correct
Section Area 150 mm2 correct
Insulation correct
Number fibre optics correct
Export minimum bend radius (MBR) correct
Burial depth correct
Comments Turbine output of 35 kV transmitted at that voltage to onshore substation where it is stepped up to 220kV. correct
Onshore Cables Number of onshore cables correct
Average length per cable correct
Comments correct
Array Cables Array cable length correct
Estimated cable length LogIn
Transmission type (e.g. MVAC) MVAC correct
Nominal voltage 35 kV correct
Maximum voltage correct
Burial depth correct
Number of cores 3 correct
Conductor type Cu correct
Section 70 mm2 correct
Insulation correct
Power rating correct
Number of fibre optics correct
Minimum bend radius (MBR) correct
Comments correct
Benefits Homes powered annually 20875 correct
CO2 reduced per year 42188 tonnes correct
SO2 reduced per year 981 tonnes correct
Expected life 15.0 years correct
Other Website correct