03 Jan 2024: Enefit Green has received approval from Estonia's Ministry of Climate for their Environmental Impact Assessment (EIA) for the Hiiumaa wind farm, giving their opinion for the building permit procedure to go ahead. After reviewing the submitted EIA, the Ministry had decided to select the fourth turbine configuration alternative provided which, after mitigation measures are implemented, would mean a total capacity of 960 MW from 48 turbines. This is 140 MW less than Enefit Green had applied for. This implies the use of 20 MW turbines, which may rule out Enefit Greens preferred suppliers Siemens Gamesa or Vestas as these are not currently available and currently (as of January 2024) being produced by Mingyang. The building permit procedure will be carried out by Estonia's Technical Regulation Authority, TTJA, and is estimated to be granted over the coming weeks.
Location:
Estonia
Status:
Concept/Early Planning
Capacity:
960 MW
4C Offshore | Location Map: Lat(59.149) Lon(22.467)

Subscribers can track wind farms on their dashboard.

General Information
Name
Hiiumaa
Other Names
Hiiu meretuulepark; Hiiu Offshore Wind Park; Hiiumaa avamere tuulepark; Loode-Eesti tuulepargi; Vindkovi madal; Apollo madal; Loode-Eesti Meretuulepark
Country
Estonia
Development Status
Concept/Early Planning
Category or Round
Unlock with a freemium account
Region
Unlock with a freemium account
Comments
Unlock with a freemium account
Website
Unlock with a freemium account

Developers/Owners/Operators
Type
Organisation

Developer

Hiiumaa Offshore Tuulepark OU

Hiiumaa Offshore Tuulepark OU

Owner

Enefit Green (formerly Nelja Energia AS)

Enefit Green (formerly Nelja Energia AS)


Offshore Construction Starts
Submitted For Consent
Consent Authorised
Financial Close
First Power
Full Commissioning
Unlock with a freemium account

Revenue Mechanism
Revenue Details
Revenue
/MWh (EUR /MWh)

How does the database work?

4C Offshore marine intelligence software provides you with exclusive access to a range of specialised services including the Global Offshore Wind Farm Database. 4C Offshore grants you exclusive access to online and offline databases, reports, newsletters, online tools and more.

There are three levels of access: Free, Freemium and Full. Freemium allows you to personalise notifications, use the search function and access more data.

You will need Full access to use the 4C Offshore interactive system, access reports, updates, news, downloads and more. To find out more about how 4C Offshore software works and the benefits of Full access, enquire below.

Sign up to Freemium Enquire about 4C Offshore
Power & Turbines
Windfarm Capacity
960 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
Baltic Sea
Latitude
59.148539°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
3
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life