Meerwind Ost
144 MW Consent Authorised Germany
Updated weekly to include the latest news, your feedback and other data.
35 Countries, 1173 Windfarms, 7307 Stakeholders, 2711 Events, 161 Vessels, 131 Turbines NEW, 35 Ports,
Filter Projects by Country
Featured Ports
Featured Port
Port of Wilhelmshaven, Germany Image of <%# Eval("PortName") %> Maximum Trenched Depth: 18 m
Entrance Width: 60 m
Spring Tidal Range: 3.5 m
Quay Length: 5377 m
Quay Loading Capability: 84 tonnes/m2
Land for Development: 59 ha
More details...



Who is generating power
Who's Generating Power?
1.  United Kingdom - 1858.40 MW
2.  Denmark - 874.48 MW
3.  China - 351.00 MW
More...
Whose Turbines are Generating?
Whose Turbines are Generating?
1.  Siemens Wind Power A/S (Siemens AG) - 1522.00 MW
2.  Vestas Offshore A/S (Vestas Wind Systems A/S) - 1404.12 MW
3.  REpower Systems AG (Suzlon Energy Limited) - 250.00 MW
Loading Map
VesselRoleOrganisationDescriptionCorrect
NOSTAG 10 Vessel-Array Cable Installation(burial) NSW, Hans Schramm & Sohn GmbH & Co. KG and Tiefbau-GmbH "Unterweser" (TAGU) Period: Jul-2012 to 31-Dec-2013
NOSTAG 10 to lay and bury 88 (108km) array cables over the two Meerwind sites using a vertical injector - Client: NSW More...
correct
NOSTAG 10 Vessel-Array Cable Installation(cable lay) NSW, Hans Schramm & Sohn GmbH & Co. KG and Tiefbau-GmbH "Unterweser" (TAGU) Period: Jul-2012 to 31-Dec-2013
NOSTAG 10 to lay and bury 88 (108km) array cables over the two Meerwind sites using a vertical injector - Client: NSW More...
correct
Zaratan Vessel-Foundation Installation(turbine) Seajacks International Ltd Period: Sep-2012 to Sep-2013
The Zaratan will install the foundations and the turbines - Client: WindMW More...
correct
Seajacks Leviathan Vessel-Transition Piece Installation(turbine) Seajacks International Ltd Period: Sep-2012 to Sep-2013
The Leviathan will install the transition pieces and the turbines - Client: WindMW More...
correct
Seajacks Leviathan Vessel-Turbine Installation Seajacks International Ltd Period: Sep-2012 to Sep-2013
The Leviathan will install the transition pieces and the turbines - Client: WindMW More...
correct
Zaratan Vessel-Turbine Installation Seajacks International Ltd Period: Sep-2012 to Sep-2013
The Zaratan will install the foundations and the turbines - Client: WindMW More...
correct
Vessels & Equipment Available for Immediate Charter
Statistics for Meerwind Ost
Wind Farm Name Meerwind Ost (also known as Meerwind) correct
CountryGermany
Region Exclusive Economic Zone (HelWin) correct
SeaName North Sea correct
Centre Latitude 54.402°
Centre Longitude 7.731°
Did you know? Its easy to add a map with this windfarm to your website! More...
Round, tender or call 
Development Status Consent Authorised correct
Comments on the Status 
Status Documentation This is the Approval Document
Capacity 144 MW correct
Turbine Capacity 3.6 MW correct
Number of Turbines 40 correct
Turbine Model SWT-3.6-120 (Siemens) correct
10 Year Mean Wind Speed (2000-2009) Available online now
Other wind speed data at this location: 6 hr/day/month historic data..., BERR, NERL
(Now incorporating NERL models for USA Projects!)
Weather Forecast Services Weather Solutions For Offshore Wind Power
Rotor Diameter 120 m correct
Total Turbine Height 145 m correct
Hub Height 85 m correct
Other comments Rotor Diameter (m) 90-126, Hub height (m)67-85, Overall height (m) 112-148. Will be connected to the HelWin transmission link. correct
Foundation Grounded: Monopile correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Area 22 km2
Water Depth Min (Chart Datum) 22 m correct
Water Depth Max (Chart Datum) 26 m correct
Depth range stated by developer 22 m - 26 m correct
Distance From Shore (reported) 53 km correct
Distance From Shore (computed from wind farm centre) 52.4 km
Export Cable Length 81 km correct
Infield Cable Length 33.5 km correct
Estimated Infield Cable Length This information is available in the purchased database - please enquire.
Export Cable Capacity 155 kV correct
Infield Cable Capacity 33 kV correct
Number of Export Cables correct
Export Cable Type correct
Cable Description correct
Number of Offshore Substations 1 correct
Grid Connection Point HelWin1 (alpha) offshore substation - Büttel (onshore) substation correct
Cable Landing Point Büsum correct
Annual Capacity Factor correct
Expected Life correct
Estimated Capital Cost (CapEx) This information is available in the purchased database - please enquire.
Stated Project Cost EUR(mill) 600.00 correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Port For Installation Base Helgoland correct
Port For Ops and Maintenance Helgoland correct
Number of homes powered annually: 80,517 homes
CO2 Reduced Per Year 162,726 tonnes
SO2 Reduced Per Year 3,784 tonnes
Website Visit correct

Events on Meerwind Ost
DateTypeDescriptionSourceCorrect
Subscribe
Event Type: Operation - Generating Power                                                                                                                                                                                                                                   Operation - Generating Power
Full commercial operation is planned by the end of Subscribe. This could be put back to Subscribe over concerns from TenneT. Subscribe correct
Sep-2012
Event Type: Installation - Foundation Installation                                                                                                                                                                                                                         Installation - Foundation Installation
Foundation installation will begin. Visit correct
2012
Event Type: Installation - Offshore Construction Starts                                                                                                                                                                                                                    Installation - Offshore Construction Starts
Construction is expected to start in 2012 Visit correct
05-Aug-2011
Event Type: Planning - Financial Close                                                                                                                                                                                                                                     Planning - Financial Close
The project has reached financial close. This is the first wind farm to financially close under the KfW programme. Visit correct
16-May-2007
Event Type: Planning - Consent Authorised                                                                                                                                                                                                                                  Planning - Consent Authorised
Consent to build given Visit correct
22-Sep-2006
Event Type: Planning - Consent Application Submitted                                                                                                                                                                                                                       Planning - Consent Application Submitted
Date of application Visit correct
2001
Event Type: Planning - Site Investigation                                                                                                                                                                                                                                  Planning - Site Investigation
Start of Environmental investigations Visit correct
2001
Event Type: Planning - Site Investigation                                                                                                                                                                                                                                  Planning - Site Investigation
Start of geotechnical investigations Visit correct

Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.

Be the first to comment on Meerwind Ost offshore wind farm Please note, your comment will take 1 hour to appear.

Your Name * :  
Web Site (optional) : http://  
Comment * :  
* required


Weather Forecast for Meerwind Ost More weather tools available on 4C Interactive Map. More weather forecast tools