Grand Léjon – Baie de Saint-Brieuc
500 MW Failed Proposal France
Updated weekly to include the latest news, your feedback and other data.
35 Countries, 1173 Windfarms, 7307 Stakeholders, 2711 Events, 161 Vessels, 131 Turbines NEW, 35 Ports,
Filter Projects by Country
Featured Ports
Featured Port
Vlissingen - Verbrugge Terminals, The Netherlands Image of <%# Eval("PortName") %> Maximum Trenched Depth: 13.3 m
Entrance Width: 372 m
Spring Tidal Range: 5 m
Quay Length: 1200 m
Quay Loading Capability: 15 tonnes/m2
Land for Development: 70 ha
More details...



Who is generating power
Who's Generating Power?
1.  United Kingdom - 1858.40 MW
2.  Denmark - 874.48 MW
3.  China - 351.00 MW
More...
Whose Turbines are Generating?
Whose Turbines are Generating?
1.  Siemens Wind Power A/S (Siemens AG) - 1522.00 MW
2.  Vestas Offshore A/S (Vestas Wind Systems A/S) - 1404.12 MW
3.  REpower Systems AG (Suzlon Energy Limited) - 250.00 MW
Loading Map
RoleOrganisationDescription 
Developer Nass&Wind Offshore (Groupe Nass&Wind) correct
Owner Groupe Nass&Wind
Percentage: Subscribe
correct
Vessels on Grand Léjon – Baie de Saint-Brieuc
Vessels & Equipment Available for Immediate Charter
Statistics for Grand Léjon – Baie de Saint-Brieuc
Wind Farm Name Grand Léjon – Baie de Saint-Brieuc (also known as Baie de Saint-Brieuc) correct
CountryFrance
Region Bretagne correct
SeaName English Channel correct
Centre Latitude 48.768° (Note: Estimated/Illustrative Location)
Centre Longitude -2.515° (Note: Estimated/Illustrative Location)
Did you know? Its easy to add a map with this windfarm to your website! More...
Round, tender or call2011 Tender
Development Status Failed Proposal correct
Comments on the StatusThe project was reconfigured as a 500MW project from original capacity of 240MW.
Status Documentation
Capacity 500 MW correct
Turbine Capacity 6 MW correct
Number of Turbines 40 correct
Turbine Model Not Decided correct
10 Year Mean Wind Speed (2000-2009) Available online now
Other wind speed data at this location: 6 hr/day/month historic data..., BERR, NERL
(Now incorporating NERL models for USA Projects!)
Weather Forecast Services Weather Solutions For Offshore Wind Power
Rotor Diameter correct
Total Turbine Height correct
Hub Height correct
Other comments Water Depth Min 26m (LAT) High 41m (HAT) correct
Foundation Not Decided correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Area
Water Depth Min (Chart Datum) 26 m correct
Water Depth Max (Chart Datum) 41 m correct
Depth range stated by developer 17 m - 27 m correct
Distance From Shore (reported) 11 km correct
Distance From Shore (computed from wind farm centre)
Export Cable Length correct
Infield Cable Length correct
Estimated Infield Cable Length This information is available in the purchased database - please enquire.
Export Cable Capacity 225 kV correct
Infield Cable Capacity correct
Number of Export Cables correct
Export Cable Type correct
Cable Description correct
Number of Offshore Substations correct
Grid Connection Point Doberie correct
Cable Landing Point correct
Annual Capacity Factor correct
Expected Life correct
Estimated Capital Cost (CapEx) This information is available in the purchased database - please enquire.
Stated Project Cost EUR(mill) 840.00 correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Port For Installation Base correct
Port For Ops and Maintenance correct
Number of homes powered annually: 279,574 homes
CO2 Reduced Per Year 565,020 tonnes
SO2 Reduced Per Year 13,140 tonnes
Website Visit correct

Events on Grand Léjon – Baie de Saint-Brieuc
DateTypeDescriptionSourceCorrect
Apr-2015
Event Type: Planning - Consent Authorised                                                                                                                                                                                                                                  Planning - Consent Authorised
Authorities to grant concession to enable the operator to use the States property ("Concession d’utilisation du domaine public maritime") Visit correct
Subscribe
Event Type: Installation - Offshore Construction Starts                                                                                                                                                                                                                    Installation - Offshore Construction Starts
Construction to start from Subscribe Subscribe correct
Oct-2014
Event Type: Planning - Consent Application Submitted                                                                                                                                                                                                                       Planning - Consent Application Submitted
Must submit request to authorities for authorization to occupy the maritime public domain in accordance with article L.2124-3 of the Code général de la propriété des personnes publiques Visit correct
06-Apr-2012
Event Type: Cancellation -                                                                                                                                                                                                                                                 Cancellation -
The project was not included in the winning tender for the the Saint Brieuc region. Visit correct
Nov-2010
Event Type: Planning - Site Investigation                                                                                                                                                                                                                                  Planning - Site Investigation
LIDAR scheduled to be installed on top of lighthouse Grand Lejon. Other environmental studies are also under way. Visit correct

Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.

Be the first to comment on Grand Léjon – Baie de Saint-Brieuc offshore wind farm Please note, your comment will take 1 hour to appear.