NearshoreLAB
36 MW Consent Authorised Denmark
Updated weekly to include the latest news, your feedback and other data.
35 Countries, 1173 Windfarms, 7307 Stakeholders, 2711 Events, 161 Vessels, 131 Turbines NEW, 35 Ports,
Filter Projects by Country
Featured Ports
Featured Port
Port of Wilhelmshaven, Germany Image of <%# Eval("PortName") %> Maximum Trenched Depth: 18 m
Entrance Width: 60 m
Spring Tidal Range: 3.5 m
Quay Length: 5377 m
Quay Loading Capability: 84 tonnes/m2
Land for Development: 59 ha
More details...



Who is generating power
Who's Generating Power?
1.  United Kingdom - 1858.40 MW
2.  Denmark - 874.48 MW
3.  China - 351.00 MW
More...
Whose Turbines are Generating?
Whose Turbines are Generating?
1.  Siemens Wind Power A/S (Siemens AG) - 1522.00 MW
2.  Vestas Offshore A/S (Vestas Wind Systems A/S) - 1404.12 MW
3.  REpower Systems AG (Suzlon Energy Limited) - 250.00 MW
Loading Map
RoleOrganisationDescription 
Developer NearshoreLAB A/S correct
Owner DONG energy
Value: Subscribe
Percentage: Subscribe
correct
Vessels & Equipment Available for Immediate Charter
Statistics for NearshoreLAB
Wind Farm Name NearshoreLAB (also known as Frederikshavn II) correct
CountryDenmark
Region Frederikshavn correct
SeaName Kattegat correct
Centre Latitude 57.457°
Centre Longitude 10.628°
Did you know? Its easy to add a map with this windfarm to your website! More...
Round, tender or callOpen Door (DK)
Development Status Consent Authorised correct
Comments on the Status 
Status Documentation Latest status information from the DEA
Capacity 36 MW correct
Turbine Capacity 6 MW correct
Number of Turbines 6 correct
Turbine Model Various correct
10 Year Mean Wind Speed (2000-2009) Available online now
Other wind speed data at this location: 6 hr/day/month historic data..., BERR, NERL
(Now incorporating NERL models for USA Projects!)
Weather Forecast Services Weather Solutions For Offshore Wind Power
Rotor Diameter 152 m correct
Total Turbine Height 182 m correct
Hub Height 106 m correct
Other comments DEA assigned test area for the erection of six demonstration offshore windmills of different make/MW and height placed on different types of foundation. correct
Foundation Various correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Area 2 km2
Water Depth Min (Chart Datum) 18 m correct
Water Depth Max (Chart Datum) 19 m correct
Depth range stated by developer 10 m - 20 m correct
Distance From Shore (reported) correct
Distance From Shore (computed from wind farm centre) 7.3 km
Export Cable Length correct
Infield Cable Length correct
Estimated Infield Cable Length This information is available in the purchased database - please enquire.
Export Cable Capacity correct
Infield Cable Capacity correct
Number of Export Cables correct
Export Cable Type correct
Cable Description correct
Number of Offshore Substations correct
Grid Connection Point correct
Cable Landing Point Frederikshavn correct
Annual Capacity Factor correct
Expected Life correct
Estimated Capital Cost (CapEx) This information is available in the purchased database - please enquire.
Stated Project Cost DKK(mill) 240.00 correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Port For Installation Base correct
Port For Ops and Maintenance correct
Number of homes powered annually: 20,129 homes
CO2 Reduced Per Year 40,681 tonnes
SO2 Reduced Per Year 946 tonnes
Website Visit correct

Events on NearshoreLAB
DateTypeDescriptionSourceCorrect
2013
Event Type: Installation - Turbine Installation                                                                                                                                                                                                                            Installation - Turbine Installation
A Vestas V164-7.0MW test turbine will be installed in 2013. Scope includes design, manufacture, delivery, transport, installation and commissioning of one (1) 7.0 MW offshore wind turbine for research and development purposes at Frederikshavn, and subsequent service and maintenance of the wind turbine. Visit correct
2013
Event Type: Installation - Turbine Installation                                                                                                                                                                                                                            Installation - Turbine Installation
Test turbines will be installed between 2012 and 2015 Visit correct
03-Nov-2010
Event Type: Planning - Consent Authorised                                                                                                                                                                                                                                  Planning - Consent Authorised
The permit was obtained. Visit correct
06-Jun-2007
Event Type: PrePlanning - Feasibility Study                                                                                                                                                                                                                                PrePlanning - Feasibility Study
DEA allowed for the NearshoreLAB to undertake feasibility studies Visit correct

Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.

Be the first to comment on NearshoreLAB offshore wind farm Please note, your comment will take 1 hour to appear.

Your Name * :  
Web Site (optional) : http://  
Comment * :  
* required


Weather Forecast for NearshoreLAB More weather tools available on 4C Interactive Map. More weather forecast tools