Nordergründe
110.7 MW Consent Authorised Germany
Updated weekly to include the latest news, your feedback and other data.
35 Countries, 1173 Windfarms, 7307 Stakeholders, 2711 Events, 161 Vessels, 131 Turbines NEW, 35 Ports,
Filter Projects by Country
Featured Ports
Featured Port
BOW Terminal Vlissingen, The Netherlands Image of <%# Eval("PortName") %> Maximum Trenched Depth: 11 m
Entrance Width: 250 m
Spring Tidal Range: 5 m
Quay Length: 1400 m
Quay Loading Capability: 15 tonnes/m2
Land for Development: 7 ha
More details...



Who is generating power
Who's Generating Power?
1.  United Kingdom - 1858.40 MW
2.  Denmark - 874.48 MW
3.  China - 351.00 MW
More...
Whose Turbines are Generating?
Whose Turbines are Generating?
1.  Siemens Wind Power A/S (Siemens AG) - 1522.00 MW
2.  Vestas Offshore A/S (Vestas Wind Systems A/S) - 1404.12 MW
3.  REpower Systems AG (Suzlon Energy Limited) - 250.00 MW
Loading Map
RoleOrganisationDescription 
Developer Energiekontor AG correct
Owner Energiekontor AG
Percentage: Subscribe
correct
Vessels & Equipment Available for Immediate Charter
Statistics for Nordergründe
Wind Farm Name Nordergründe (also known as OWP Nordergründe, Nordergrunde) correct
CountryGermany
Region 12nm zone (Lower Saxony Niedersachsen) correct
SeaName North Sea correct
Centre Latitude 53.838°
Centre Longitude 8.166°
Did you know? Its easy to add a map with this windfarm to your website! More...
Round, tender or call 
Development Status Consent Authorised correct
Comments on the Status 
Status Documentation
Capacity 110.7 MW correct
Turbine Capacity 6.15 MW correct
Number of Turbines 18 correct
Turbine Model 6M (REpower) correct
10 Year Mean Wind Speed (2000-2009) Available online now
Other wind speed data at this location: 6 hr/day/month historic data..., BERR, NERL
(Now incorporating NERL models for USA Projects!)
Weather Forecast Services Weather Solutions For Offshore Wind Power
Rotor Diameter 126 m correct
Total Turbine Height 147 m correct
Hub Height 84 m correct
Other comments correct
Foundation Grounded: Monopile correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Area 6 km2
Water Depth Min (Chart Datum) 3 m correct
Water Depth Max (Chart Datum) 11 m correct
Depth range stated by developer 4 m - 14 m correct
Distance From Shore (reported) 16 km correct
Distance From Shore (computed from wind farm centre) 17.6 km
Export Cable Length 27 km correct
Infield Cable Length 13.5 km correct
Estimated Infield Cable Length This information is available in the purchased database - please enquire.
Export Cable Capacity correct
Infield Cable Capacity 33 kV correct
Number of Export Cables correct
Export Cable Type correct
Cable Description correct
Number of Offshore Substations 1 correct
Grid Connection Point Inhausen correct
Cable Landing Point Hooksieler Binnentief correct
Annual Capacity Factor correct
Expected Life correct
Estimated Capital Cost (CapEx) This information is available in the purchased database - please enquire.
Stated Project Cost EUR(mill) 300.00 correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Port For Installation Base correct
Port For Ops and Maintenance correct
Number of homes powered annually: 61,898 homes
CO2 Reduced Per Year 125,095 tonnes
SO2 Reduced Per Year 2,909 tonnes
Website Visit correct

Events on Nordergründe
DateTypeDescriptionSourceCorrect
Jul-2014
Event Type: Installation - Grid Connection Available                                                                                                                                                                                                                       Installation - Grid Connection Available
The grid connection will be available from this date. Visit correct
2014
Event Type: Installation - Turbine Installation                                                                                                                                                                                                                            Installation - Turbine Installation
Turbine installation will begin in this year. Visit correct
Subscribe
Event Type: Operation - Generating Power                                                                                                                                                                                                                                   Operation - Generating Power
Estimated Construction Finish and start of Generation at the earliest. Subscribe correct
Subscribe
Event Type: Installation - Offshore Construction Starts                                                                                                                                                                                                                    Installation - Offshore Construction Starts
Estimated Construction Start Subscribe correct
2013
Event Type: Installation - Cable installation                                                                                                                                                                                                                              Installation - Cable installation
The export cable is planned to be commissioned in 2013. Visit correct
31-Jul-2012
Event Type: Planning - Financial Close                                                                                                                                                                                                                                     Planning - Financial Close
Expected second half of 2012. Visit correct
02-Apr-2012
Event Type: Planning - Grid Connection Agreement                                                                                                                                                                                                                           Planning - Grid Connection Agreement
TenneT offered an unconditional offer of a grid connection. Visit correct
Oct-2011
Event Type: Planning - Consent Authorised                                                                                                                                                                                                                                  Planning - Consent Authorised
Consent authorised with 6.15MW turbines. Visit correct
31-Oct-2008
Event Type: Planning - Consent Authorised                                                                                                                                                                                                                                  Planning - Consent Authorised
Approval for construction and operation of wind farm given Visit correct
10-May-2006
Event Type: Planning - Consent Application Submitted                                                                                                                                                                                                                       Planning - Consent Application Submitted
Consent Application Submitted Visit correct

Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.

Be the first to comment on Nordergründe offshore wind farm Please note, your comment will take 1 hour to appear.

Your Name * :
Web Site (optional) : http://
Comment * :
* required


Weather Forecast for Nordergründe More weather tools available on 4C Interactive Map. More weather forecast tools