NW3 - Medium Term Option for Offshore Wind Development
Cancelled United Kingdom
Updated weekly to include the latest news, your feedback and other data.
35 Countries, 1173 Windfarms, 7307 Stakeholders, 2711 Events, 161 Vessels, 131 Turbines NEW, 35 Ports,
Filter Projects by Country
Featured Ports
Featured Port
BOW Terminal Vlissingen, The Netherlands Image of <%# Eval("PortName") %> Maximum Trenched Depth: 11 m
Entrance Width: 250 m
Spring Tidal Range: 5 m
Quay Length: 1400 m
Quay Loading Capability: 15 tonnes/m2
Land for Development: 7 ha
More details...



Who is generating power
Who's Generating Power?
1.  United Kingdom - 1858.40 MW
2.  Denmark - 874.48 MW
3.  China - 351.00 MW
More...
Whose Turbines are Generating?
Whose Turbines are Generating?
1.  Siemens Wind Power A/S (Siemens AG) - 1522.00 MW
2.  Vestas Offshore A/S (Vestas Wind Systems A/S) - 1404.12 MW
3.  REpower Systems AG (Suzlon Energy Limited) - 250.00 MW
Loading Map
Vessels on NW3 - Medium Term Option for Offshore Wind Development
Vessels & Equipment Available for Immediate Charter
Statistics for NW3 - Medium Term Option for Offshore Wind Development
Wind Farm Name NW3 - Medium Term Option for Offshore Wind Development correct
CountryUnited Kingdom
Region Scotland correct
SeaName Atlantic Ocean correct
Centre Latitude 57.891°
Centre Longitude -7.524°
Did you know? Its easy to add a map with this windfarm to your website! More...
Round, tender or call 
Development Status Cancelled correct
Comments on the StatusExcluded from the Draft Plan as a result of its potential impact on the inter-relationship between St. Kilda and the Western Isles.
Status Documentation
Capacity correct
Turbine Capacity correct
Number of Turbines correct
Turbine Model Not Decided correct
10 Year Mean Wind Speed (2000-2009) Available online now
Other wind speed data at this location: 6 hr/day/month historic data..., BERR, NERL
(Now incorporating NERL models for USA Projects!)
Weather Forecast Services Weather Solutions For Offshore Wind Power
Rotor Diameter correct
Total Turbine Height correct
Hub Height correct
Other comments correct
Foundation Not Decided correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Area 278 km2
Water Depth Min (Chart Datum) 25 m correct
Water Depth Max (Chart Datum) 109 m correct
Depth range stated by developer correct
Distance From Shore (reported) correct
Distance From Shore (computed from wind farm centre) 24.6 km
Export Cable Length correct
Infield Cable Length correct
Estimated Infield Cable Length This information is available in the purchased database - please enquire.
Export Cable Capacity correct
Infield Cable Capacity correct
Number of Export Cables correct
Export Cable Type correct
Cable Description correct
Number of Offshore Substations correct
Grid Connection Point correct
Cable Landing Point correct
Annual Capacity Factor correct
Expected Life correct
Estimated Capital Cost (CapEx) This information is available in the purchased database - please enquire.
Stated Project Cost correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Port For Installation Base correct
Port For Ops and Maintenance correct
Number of homes powered annually:
CO2 Reduced Per Year
SO2 Reduced Per Year
Website Visit correct

Events on NW3 - Medium Term Option for Offshore Wind Development
DateTypeDescriptionSourceCorrect
Subscribe
Event Type: Operation - Generating Power                                                                                                                                                                                                                                   Operation - Generating Power
Medium term Development Areas are scheduled for development in the period Subscribe-2030 Subscribe correct
30-Nov-2011
Event Type: Cancellation -                                                                                                                                                                                                                                                 Cancellation -
Not included in the Scoping study. Visit correct

Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.

Be the first to comment on NW3 - Medium Term Option for Offshore Wind Development offshore wind farm Please note, your comment will take 1 hour to appear.

Your Name * :  
Web Site (optional) : http://  
Comment * :  
* required


Weather Forecast for NW3 - Medium Term Option for Offshore Wind Development More weather tools available on 4C Interactive Map. More weather forecast tools