Nysted
165.6 MW Fully Commissioned Denmark
Updated weekly to include the latest news, your feedback and other data.
38 Countries, 1323 Windfarms, 9111 Stakeholders, 4314 Events, 824 Vessels, 154 Turbines NEW, 42 Ports,
Filter Projects by Country
Featured Ports
Featured Port
Able Middlesbrough Port, United Kingdom Image of <%# Eval("PortName") %> Maximum Trenched Depth: 8.5 m
Entrance Width: 84 m
Spring Tidal Range: 4.6 m
Quay Length: 250 m
Quay Loading Capability: 25 tonnes/m2
Land for Development: 16 ha
More details...



Who is generating power
Who's Generating Power?
1.  United Kingdom - 3321.2000 MW
2.  Denmark - 871.4800 MW
3.  China - 559.5000 MW
More...
Whose Turbines are Generating?
Whose Turbines are Generating?
1.  Siemens Wind Power A/S (Siemens AG) - 3084.8000 MW
2.  Vestas Offshore A/S (Vestas Wind Systems A/S) - 1401.1200 MW
3.  REpower Systems AG (Suzlon Energy Limited) - 434.5000 MW
Loading Map
Equipment Available for Charter
Statistics for Nysted
General Information Name Nysted correct
Other names Rødsand I correct
Country name Denmark correct
Region Sydfalster correct
Comments Also known as Rodsand I correct
Round (or category) correct
Development status Fully Commissioned correct
Comments on the status correct
Power & Turbines Notice any Errors? You can keep this an open resource by submitting corrections!
Project Capacity 165.6 MW correct
Turbine Model B82/2300 (Bonus), SWT-2.3-82 correct
Turbine Capacity 2.3 MW correct
Number of Turbines 72 correct
Total Turbine Height 110 m correct
Hub Height 69.00 m correct
Rotor Diameter 82 m correct
Foundation Grounded: Gravity-Base correct
Windspeed 10 Year Mean Wind Speed (2000-2009) Available online now
Detailed wind speed data 6 hr/day/month historic data
Costs Stated Project Cost EUR(mill) 200.00 correct
Location & Environment Sea name Baltic Sea correct
Centre latitude 54.549° correct
Centre longitude 11.714° correct
Area 26 km2 correct
Depth range (Chart Datum) 6 m - 9 m correct
Depth range stated by developer 6 m - 10 m correct
Distance From Shore (reported) 10.8 km correct
Distance From Shore (computed from centre) 10.7 km correct
Ports Installation base Nyborg, Denmark correct
Ops and maintenance Port of Rødby correct
Grid Converter platforms None correct
Offshore transformers Nysted Substation correct
Grid connection point Radsted 132 kV switching station correct
Cable landing point Vantore Strand correct
Export Cables
Please note that export cables connect the offshore transformer (substation) to either; shore or an offshore HVAC-HVDC converter station for onward transmission via HVDC cabling. Please see the converters page for planned converter stations and transmission cables.

The export cable length does not generally include the onshore component. The exception is when the onshore substation is close to shore.
Number of Export Cables 2 correct
Average length per cable 11 km correct
Transmission type (e.g. HVAC) HVAC correct
Nominal voltage 132 kV correct
Maximum voltage correct
Power rating correct
Number of cores 3 correct
Conductor type XLPE correct
Section 760 mm2 correct
Insulation correct
Number fibre optics 48 correct
Minimum bend radius (MBR) correct
Burial depth correct
Comments correct
Onshore Cables (new) Number of onshore cables 1 correct
Average length per cable 18 km correct
Comments Supplied by ABB correct
Array Cables Array cable length 55 km correct
Estimated cable length In purchased database
Transmission type (e.g. MVAC) MVAC correct
Nominal voltage 33 kV correct
Maximum voltage 36 kV correct
Burial depth 1 m correct
Number of cores correct
Conductor type correct
Section correct
Insulation correct
Power rating correct
Number of fibre optics correct
Minimum bend radius (MBR) correct
Comments correct
Benefits Homes powered annually 92595 correct
CO2 reduced per year 187135 tonnes correct
SO2 reduced per year 4352 tonnes correct
Expected life correct
Other Website Visit correct

Events on Nysted
12
DateTypeDescriptionSourceCorrect
09-Jan-2004
Event Type: Operation - Generating Power                                                                                                                                                                                                                                   Operation - Generating Power
Handed over to owners. Visit correct
Dec-2003
Event Type: Operation - Fully Commissioned                                                                                                                                                                                                                                 Operation - Fully Commissioned
The entire wind farm was in operation. Visit correct
27-Jul-2003
Event Type: Installation - Turbine Installation                                                                                                                                                                                                                            Installation - Turbine Installation
Turbine installation finished. Visit correct
Jul-2003
Event Type: Installation - Foundation Installation                                                                                                                                                                                                                         Installation - Foundation Installation
Foundation installation finished Visit correct
Jun-2003
Event Type: Operation - Generating Power                                                                                                                                                                                                                                   Operation - Generating Power
Estimated date for the start of first power generation. Visit correct
10-May-2003
Event Type: Installation - Turbine Installation                                                                                                                                                                                                                            Installation - Turbine Installation
Turbine installation began. Visit correct
2003
Event Type: Installation - Met Mast                                                                                                                                                                                                                                        Installation - Met Mast
Met mast installed. Between 1997 and 2005 one mast was used to collect information, however in 2003 a further 4 masts were erected. Visit correct
Jun-2002
Event Type: Installation - Foundation Installation                                                                                                                                                                                                                         Installation - Foundation Installation
Offshore construction starts with foundations Visit correct
Jun-2002
Event Type: Installation - Offshore Construction Starts                                                                                                                                                                                                                    Installation - Offshore Construction Starts
The project started construction. Visit correct
2002
Event Type: Planning - Financial Close                                                                                                                                                                                                                                     Planning - Financial Close
Estimated year for financial close. Visit correct
12

Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.
Be the first to comment on Nysted offshore wind farm Please note, your comment will take 1 hour to appear.

Your Name * :  
Web Site (optional) : http://  
Comment * :  
* required