Poseidon
0.03 MW Fully Commissioned Denmark
Updated weekly to include the latest news, your feedback and other data.
35 Countries, 1173 Windfarms, 7307 Stakeholders, 2711 Events, 161 Vessels, 131 Turbines NEW, 35 Ports,
Filter Projects by Country
Featured Ports
Featured Port
Able Seaton Port, United Kingdom Image of <%# Eval("PortName") %> Maximum Trenched Depth: 15 m
Entrance Width: 125 m
Spring Tidal Range: 4.6 m
Quay Length: 791 m
Quay Loading Capability: 60 tonnes/m2
Land for Development: 45 ha
More details...



Who is generating power
Who's Generating Power?
1.  United Kingdom - 1858.40 MW
2.  Denmark - 874.48 MW
3.  China - 351.00 MW
More...
Whose Turbines are Generating?
Whose Turbines are Generating?
1.  Siemens Wind Power A/S (Siemens AG) - 1522.00 MW
2.  Vestas Offshore A/S (Vestas Wind Systems A/S) - 1404.12 MW
3.  REpower Systems AG (Suzlon Energy Limited) - 250.00 MW
Loading Map
Vessels & Equipment Available for Immediate Charter
Statistics for Poseidon
Wind Farm Name Poseidon (also known as Floating Power Plant) correct
CountryDenmark
Region Lolland correct
SeaName Kattegat correct
Centre Latitude 54.956° (Note: Estimated/Illustrative Location)
Centre Longitude 11.099° (Note: Estimated/Illustrative Location)
Did you know? Its easy to add a map with this windfarm to your website! More...
Round, tender or call 
Development Status Fully Commissioned correct
Comments on the Status 
Status Documentation
Capacity 0.03 MW correct
Turbine Capacity 0.01 MW correct
Number of Turbines 3 correct
Turbine Model GAIA 0.011MW (GAIA-Wind) correct
10 Year Mean Wind Speed (2000-2009) Available online now
Other wind speed data at this location: 6 hr/day/month historic data..., BERR, NERL
(Now incorporating NERL models for USA Projects!)
Weather Forecast Services Weather Solutions For Offshore Wind Power
Rotor Diameter 13 m correct
Total Turbine Height correct
Hub Height correct
Other comments This floating platform has both offshore wind turbines and wave energy technology. It is in the test phase looking to collect data for the first commercial design. correct
Foundation Unknown correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Area
Water Depth Min (Chart Datum) correct
Water Depth Max (Chart Datum) correct
Depth range stated by developer correct
Distance From Shore (reported) correct
Distance From Shore (computed from wind farm centre)
Export Cable Length correct
Infield Cable Length correct
Estimated Infield Cable Length This information is available in the purchased database - please enquire.
Export Cable Capacity correct
Infield Cable Capacity correct
Number of Export Cables correct
Export Cable Type correct
Cable Description correct
Number of Offshore Substations correct
Grid Connection Point correct
Cable Landing Point correct
Annual Capacity Factor correct
Expected Life correct
Estimated Capital Cost (CapEx) This information is available in the purchased database - please enquire.
Stated Project Cost correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Port For Installation Base correct
Port For Ops and Maintenance correct
Number of homes powered annually: 17 homes
CO2 Reduced Per Year 34 tonnes
SO2 Reduced Per Year 1 tonnes
Website Visit correct

Events on Poseidon
DateTypeDescriptionSourceCorrect
Jul-2010
Event Type: Operation - Generating Power                                                                                                                                                                                                                                   Operation - Generating Power
The demonstration wind and wave site became operational in the first half of 2010. Visit correct
14-Jun-2010
Event Type: Installation - Other                                                                                                                                                                                                                                           Installation - Other
Started test phase 2 which is an offshore test in Danish waters. Visit correct

Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.

Be the first to comment on Poseidon offshore wind farm Please note, your comment will take 1 hour to appear.

Your Name * :  
Web Site (optional) : http://  
Comment * :  
* required


Weather Forecast for Poseidon More weather tools available on 4C Interactive Map. More weather forecast tools