Theoretical Power Production for 16 May 2013 09:00 (GMT)
Updated weekly to include the latest news, your feedback and other data.
38 Countries, 1317 Windfarms, 9090 Stakeholders, 4282 Events, 824 Vessels, 153 Turbines NEW, 42 Ports,
Featured Ports
Featured Port
Port of Wilhelmshaven, Germany Image of <%# Eval("PortName") %> Maximum Trenched Depth: 18 m
Entrance Width: 60 m
Spring Tidal Range: 3.5 m
Quay Length: 5377 m
Quay Loading Capability: 84 tonnes/m2
Land for Development: 59 ha
More details...



Who is generating power
Who's Generating Power?
1.  United Kingdom - 3321.2000 MW
2.  Denmark - 871.4800 MW
3.  China - 559.5000 MW
More...
Whose Turbines are Generating?
Whose Turbines are Generating?
1.  Siemens Wind Power A/S (Siemens AG) - 3084.8000 MW
2.  Vestas Offshore A/S (Vestas Wind Systems A/S) - 1401.1200 MW
3.  REpower Systems AG (Suzlon Energy Limited) - 434.5000 MW
MeteoGroup

Using nowcasts of wind speed at hub height supplied by MeteoGroup it is possible to calculate theoretical energy production at the UK's offshore wind projects. The theoretical production figures below assume all turbines are installed and operating efficiently.

Currently (16 May 2013 09:00) the average load factor is 3.2% for the projects shown below. With a total nameplate capacity of 3579.2 MW, power output when these projects are complete would be 86.9 MW. Current output for fully commissioned projects is 86.9 MW, a load factor of 3.3%.

Project Load Factor Instantaneous Power Production Power Forecast
Barrow status is Fully Commissioned Barrow (90 MW) 5.43% 4.89 MW Power Forecast...
Beatrice Demonstration status is Fully Commissioned Beatrice Demonstration (10 MW) 3.4% 0.35 MW Power Forecast...
Blyth status is Fully Commissioned Blyth (4 MW) 0% 0 MW Power Forecast...
Burbo Bank status is Fully Commissioned Burbo Bank (90 MW) 2.27% 2.05 MW Power Forecast...
Greater Gabbard status is Fully Commissioned Greater Gabbard (504 MW) 0% 0 MW Power Forecast...
Gunfleet Sands I + II status is Fully Commissioned Gunfleet Sands I + II (172.8 MW) 2.34% 4.04 MW Power Forecast...
Inner Dowsing status is Fully Commissioned Inner Dowsing (97.2 MW) 0% 0 MW Power Forecast...
Kentish Flats status is Fully Commissioned Kentish Flats (90 MW) 0.86% 0.78 MW Power Forecast...
Lincs status is Partial Generation/Under Construction Lincs (270 MW) 0% 0 MW Power Forecast...
London Array Phase 1 status is Fully Commissioned London Array Phase 1 (630 MW) 0% 0 MW Power Forecast...
Lynn status is Fully Commissioned Lynn (97.2 MW) 0% 0 MW Power Forecast...
North Hoyle status is Fully Commissioned North Hoyle (60 MW) 0% 0 MW Power Forecast...
Ormonde status is Fully Commissioned Ormonde (150 MW) 8.15% 12.41 MW Power Forecast...
Rhyl Flats status is Fully Commissioned Rhyl Flats (90 MW) 0% 0 MW Power Forecast...
Robin Rigg status is Fully Commissioned Robin Rigg (180 MW) 5.34% 9.62 MW Power Forecast...
Scroby Sands status is Fully Commissioned Scroby Sands (60 MW) 17.28% 10.37 MW Power Forecast...
Sheringham Shoal status is Fully Commissioned Sheringham Shoal (316.8 MW) 6.77% 21.46 MW Power Forecast...
Thanet status is Fully Commissioned Thanet (300 MW) 0% 0 MW Power Forecast...
Walney Phase 1 status is Fully Commissioned Walney Phase 1 (183.6 MW) 4.4% 8.08 MW Power Forecast...
Walney Phase 2 status is Fully Commissioned Walney Phase 2 (183.6 MW) 6.99% 12.83 MW Power Forecast...