Prinses Amaliawindpark
120 MW Fully Commissioned Netherlands
Updated weekly to include the latest news, your feedback and other data.
35 Countries, 1173 Windfarms, 7307 Stakeholders, 2711 Events, 161 Vessels, 131 Turbines NEW, 35 Ports,
Filter Projects by Country
Featured Ports
Featured Port
BOW Terminal Vlissingen, The Netherlands Image of <%# Eval("PortName") %> Maximum Trenched Depth: 11 m
Entrance Width: 250 m
Spring Tidal Range: 5 m
Quay Length: 1400 m
Quay Loading Capability: 15 tonnes/m2
Land for Development: 7 ha
More details...



Who is generating power
Who's Generating Power?
1.  United Kingdom - 1858.40 MW
2.  Denmark - 874.48 MW
3.  China - 351.00 MW
More...
Whose Turbines are Generating?
Whose Turbines are Generating?
1.  Siemens Wind Power A/S (Siemens AG) - 1522.00 MW
2.  Vestas Offshore A/S (Vestas Wind Systems A/S) - 1404.12 MW
3.  REpower Systems AG (Suzlon Energy Limited) - 250.00 MW
Loading Map
Vessels on Prinses Amaliawindpark
12
VesselRoleOrganisationDescriptionCorrect
CS Sovereign Vessel-Array Cable Installation(burial) Global Marine Systems Ltd Atlas ROV 1 used from CS Sovereign to bury 27km of array cabling More... correct
Pontra Maris Vessel-Array Cable Installation(cable lay) Stemat Marine Services Pontra Maris used for inter turbine cable lay - Client: Van Oord More... correct
Pontra Maris Vessel-Export Cable Installation(burial) Stemat Marine Services Pontra Maris barge used for export cable burial - Client: Van Oord More... correct
Eide Barge 32 Vessel-Export Cable Installation(cable lay) Nexans France EB 32 used for cable lay of export cable - Client: Van Oord More... correct
SEA JACK (formally Jumping Jack) Vessel-Foundation Installation(met mast) Mammoet van Oord BV Installation of 60 x turbine monopiles, 1x substation foundation and 1x Metmast foundation - Client:Van Oord More... correct
SEA JACK (formally Jumping Jack) Vessel-Foundation Installation(substation) Mammoet van Oord BV Period: 22-Sep-2006 to 26-Mar-2007
Installation of 60 x turbine monopiles, 1x substation foundation and 1x Metmast foundation - Client:Van Oord More...
correct
SEA JACK (formally Jumping Jack) Vessel-Foundation Installation(turbine) Mammoet van Oord BV Installation of 60 x turbine monopiles, 1x substation foundation and 1x Metmast foundation - Client:Van Oord More... correct
SEA JACK (formally Jumping Jack) Vessel-Substation Installation Mammoet van Oord BV Period: 03-May-2007 to 04-May-2007
Installation of substation topside - Client:Van Oord More...
correct
Dancing Water Vessel-Support K and W Trans Period: 25-Aug-2011 to 26-Aug-2011
The Dancing Water provided 3-point mooring on the pile for diving and cleaning activities. Client: Ballast Nedam
correct
SEA JACK (formally Jumping Jack) Vessel-Transition Piece Installation(met mast) Mammoet van Oord BV Installation of the 60 turbine, 1 substation and 1 Met Mast transition pieces - Client:Van Oord More... correct
12
Vessels & Equipment Available for Immediate Charter
Statistics for Prinses Amaliawindpark
Wind Farm Name Prinses Amaliawindpark (also known as Q7) correct
CountryNetherlands
Region Noord-Holland correct
SeaName North Sea correct
Centre Latitude 52.588°
Centre Longitude 4.223°
Did you know? Its easy to add a map with this windfarm to your website! More...
Round, tender or callRound 1 (NL)
Development Status Fully Commissioned correct
Comments on the StatusOperational
Status Documentation
Capacity 120 MW correct
Turbine Capacity 2 MW correct
Number of Turbines 60 correct
Turbine Model V80-2.0 MW (Vestas) correct
10 Year Mean Wind Speed (2000-2009) Available online now
Other wind speed data at this location: 6 hr/day/month historic data..., BERR, NERL
(Now incorporating NERL models for USA Projects!)
Weather Forecast Services Weather Solutions For Offshore Wind Power
Rotor Diameter 80 m correct
Total Turbine Height 99 m correct
Hub Height 59 m correct
Other comments Formally called the Q7.
The coordinates in decimal degrees were calculated based on ED50 figures.
Construction phase started in October 2006. correct
Foundation Grounded: Monopile correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Area 17 km2
Water Depth Min (Chart Datum) 19 m correct
Water Depth Max (Chart Datum) 24 m correct
Depth range stated by developer 19 m - 24 m correct
Distance From Shore (reported) 23 km correct
Distance From Shore (computed from wind farm centre) 26.4 km
Export Cable Length 28 km correct
Infield Cable Length 45 km correct
Estimated Infield Cable Length This information is available in the purchased database - please enquire.
Export Cable Capacity 150 kV correct
Infield Cable Capacity 22 kV correct
Number of Export Cables 1 correct
Export Cable Type 3 phase export cable in the sea (150 kV) correct
Cable Description 3 phase inter-turbine cable at sea (22 kV) correct
Number of Offshore Substations 1 correct
Grid Connection Point Velsen correct
Cable Landing Point Ijmuiden (Wijk aan Zee) correct
Annual Capacity Factor correct
Expected Life correct
Estimated Capital Cost (CapEx) This information is available in the purchased database - please enquire.
Stated Project Cost EUR(mill) 350.00 correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Port For Installation Base Ijmuiden correct
Port For Ops and Maintenance correct
Number of homes powered annually: 67,098 homes
CO2 Reduced Per Year 135,605 tonnes
SO2 Reduced Per Year 3,154 tonnes
Website Visit correct

Events on Prinses Amaliawindpark
12
DateTypeDescriptionSourceCorrect
24-Jul-2008
Event Type: Operation - Generating Power                                                                                                                                                                                                                                   Operation - Generating Power
The wind farm officially opened Other correct
Nov-2007
Event Type: Installation - Turbine Installation                                                                                                                                                                                                                            Installation - Turbine Installation
Turbine installation finishes. Visit correct
Sep-2007
Event Type: Installation - Cable installation                                                                                                                                                                                                                              Installation - Cable installation
Infield cables installation finishes. Visit correct
Sep-2007
Event Type: Installation - Cable installation                                                                                                                                                                                                                              Installation - Cable installation
Export cables installation finishes. Visit correct
Jul-2007
Event Type: Installation - Cable installation                                                                                                                                                                                                                              Installation - Cable installation
Export cables installation starts. Visit correct
May-2007
Event Type: Installation - Turbine Installation                                                                                                                                                                                                                            Installation - Turbine Installation
Turbine installation starts. Visit correct
May-2007
Event Type: Installation - Offshore Substation                                                                                                                                                                                                                             Installation - Offshore Substation
Installation of the offshore substation. Visit correct
May-2007
Event Type: Installation - Cable installation                                                                                                                                                                                                                              Installation - Cable installation
Infield cables installation starts. Visit correct
26-Mar-2007
Event Type: Installation - Foundation Installation                                                                                                                                                                                                                         Installation - Foundation Installation
Foundation installation finishes. Visit correct
22-Sep-2006
Event Type: Installation - Foundation Installation                                                                                                                                                                                                                         Installation - Foundation Installation
Foundation installation started. Visit correct
12

Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.

Be the first to comment on Prinses Amaliawindpark offshore wind farm Please note, your comment will take 1 hour to appear.

Your Name * :  
Web Site (optional) : http://  
Comment * :  
* required


Weather Forecast for Prinses Amaliawindpark More weather tools available on 4C Interactive Map. More weather forecast tools