Rødsand 2
207 MW Fully Commissioned Denmark
Updated weekly to include the latest news, your feedback and other data.
38 Countries, 1317 Windfarms, 9090 Stakeholders, 4282 Events, 824 Vessels, 153 Turbines NEW, 42 Ports,
Filter Projects by Country
Featured Ports
Featured Port
Aalborg Port, Denmark Image of <%# Eval("PortName") %> Maximum Trenched Depth: 9.3 m
Entrance Width: 110 m
Spring Tidal Range: 0.3 m
Quay Length: 200 m
Quay Loading Capability: 42 tonnes/m2
Land for Development: 300 ha
More details...



Who is generating power
Who's Generating Power?
1.  United Kingdom - 3321.2000 MW
2.  Denmark - 871.4800 MW
3.  China - 559.5000 MW
More...
Whose Turbines are Generating?
Whose Turbines are Generating?
1.  Siemens Wind Power A/S (Siemens AG) - 3084.8000 MW
2.  Vestas Offshore A/S (Vestas Wind Systems A/S) - 1401.1200 MW
3.  REpower Systems AG (Suzlon Energy Limited) - 434.5000 MW
Loading Map
Equipment Available for Charter
Statistics for Rødsand 2
General Information Name Rødsand 2 correct
Other names Nysted II correct
Country name Denmark correct
Region Holeby correct
Comments correct
Round (or category) Tender (DK) correct
Development status Fully Commissioned correct
Comments on the status correct
Power & Turbines Notice any Errors? You can keep this an open resource by submitting corrections!
Project Capacity 207 MW correct
Turbine Model SWT-2.3-93 (Siemens) correct
Turbine Capacity 2.3 MW correct
Number of Turbines 90 correct
Total Turbine Height 115 m correct
Hub Height 68.50 m correct
Rotor Diameter 93 m correct
Foundation Grounded: Gravity-Base correct
Windspeed 10 Year Mean Wind Speed (2000-2009) Available online now
Detailed wind speed data 6 hr/day/month historic data
Costs Stated Project Cost EUR(mill) 400.00 correct
Location & Environment Sea name Baltic Sea correct
Centre latitude 54.555° correct
Centre longitude 11.548° correct
Area 34 km2 correct
Depth range (Chart Datum) 6 m - 12 m correct
Depth range stated by developer 4 m - 10 m correct
Distance From Shore (reported) 8.8 km correct
Distance From Shore (computed from centre) 9 km correct
Ports Installation base Nyborg, Denmark correct
Ops and maintenance correct
Grid Converter platforms None correct
Offshore transformers Rødsand 2 Substation correct
Grid connection point Radsted 132 kV switching station correct
Cable landing point Saksfjed inddæmning correct
Export Cables
Please note that export cables connect the offshore transformer (substation) to either; shore or an offshore HVAC-HVDC converter station for onward transmission via HVDC cabling. Please see the converters page for planned converter stations and transmission cables.

The export cable length does not generally include the onshore component. The exception is when the onshore substation is close to shore.
Number of Export Cables 1 correct
Average length per cable 9.2 km correct
Transmission type (e.g. HVAC) HVAC correct
Nominal voltage 132 kV correct
Maximum voltage 145 kV correct
Power rating correct
Number of cores correct
Conductor type correct
Section correct
Insulation correct
Number fibre optics correct
Minimum bend radius (MBR) correct
Burial depth correct
Comments Total of 56km of 145kV submarine cable correct
Onshore Cables (new) Number of onshore cables correct
Average length per cable 28 km correct
Comments 132kV correct
Array Cables Array cable length 80 km correct
Estimated cable length In purchased database
Transmission type (e.g. MVAC) MVAC correct
Nominal voltage 33 kV correct
Maximum voltage 36 kV correct
Burial depth correct
Number of cores 3 correct
Conductor type Cu correct
Section 120/240 mm2 correct
Insulation correct
Power rating correct
Number of fibre optics correct
Minimum bend radius (MBR) correct
Comments correct
Benefits Homes powered annually 115744 correct
CO2 reduced per year 233918 tonnes correct
SO2 reduced per year 5440 tonnes correct
Expected life correct
Other Website Visit correct

Events on Rødsand 2
12
DateTypeDescriptionSourceCorrect
12-Oct-2010
Event Type: Operation - Fully Commissioned                                                                                                                                                                                                                                 Operation - Fully Commissioned
The wind farm was officially inaugurated by Danish Climate and Energy Minister Lykke Friis. Visit correct
15-Aug-2010
Event Type: Operation - Generating Power                                                                                                                                                                                                                                   Operation - Generating Power
The wind farm will be fully operational ahead of schedule. The original estimate was for October. Visit correct
15-Jul-2010
Event Type: Installation - Turbine Installation                                                                                                                                                                                                                            Installation - Turbine Installation
The final turbine was installed. Visit correct
14-Jul-2010
Event Type: Installation - Other                                                                                                                                                                                                                                           Installation - Other
Construction finishes. Visit correct
Mar-2010
Event Type: Installation - Turbine Installation                                                                                                                                                                                                                            Installation - Turbine Installation
Turbine installation is scheduled to start in March 2010. Visit correct
Feb-2010
Event Type: Installation - Foundation Installation                                                                                                                                                                                                                         Installation - Foundation Installation
Foundation work scheduled to finish. Visit correct
Dec-2009
Event Type: Installation - Offshore Substation                                                                                                                                                                                                                             Installation - Offshore Substation
Offshore substation was installed. Visit correct
Aug-2009
Event Type: Installation - Cable installation                                                                                                                                                                                                                              Installation - Cable installation
The installation of the 145 kV export cable took place. Visit correct
Apr-2009
Event Type: Installation - Offshore Construction Starts                                                                                                                                                                                                                    Installation - Offshore Construction Starts
Offshore construction commenced in April 2009. Visit correct
Feb-2009
Event Type: Installation - Foundation Installation                                                                                                                                                                                                                         Installation - Foundation Installation
Foundation work scheduled to start. Visit correct
12

Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.
Comments on Rødsand 2 offshore wind farm Please note, your comment will take 1 hour to appear.

Your Name * :  
Web Site (optional) : http://  
Comment * :  
* required

Added: Thu, 02 Aug 2012 04:24:00 GMT
We are International Ship Sales-Purchase-Charter brokers, in business for over 36 years and operating out of our office here in St. John's, Newfoundland. We have the following units described below, which we feel, may be of interest to you. Please see attached information on the Canadian heavy-lift barge "Marine Link Explorer" with 2 x 214 mt derrecks and the twin-screw 3,470 hp Canadian tug. I have more information and a series of photos on these units which I can send as attachments to following e-mails. Please advise if you want this. We feel that you may have a need for this marine equipment for use in installation of offshore turbines. Please note that the Canadian owner of the heavy-lift barge & tug would like to get US$5 million for both en bloc but I understand that he might well consider an offer in the range of US$3.75 - $4.25 million, if the deal could be closed cleanly and quickly. While he would prefer to sell both en bloc, he might consider selling them seperately. Can guide on the price of the units seperately. Units are in Eastern Canada. Please advise if you have any interest in these units and I will send along addition information and series of photos, etc. Thank you, success and regards, John A. Andrews Fogo Boat Brokerage Neptune International Shipping Inc. 120 LeMarchant Road, P.O. Box 6211 (Station "C") St. John's, Newfoundland,> Canada. A1C 5X8 Tel (office): 1 (709) 754-1003 Tel (mobile): 1 (709) 727-9616 Facsimile: 1 (709) 754-1015
John Andrews