San Michele
162 MW Consent Authorised Italy
Updated weekly to include the latest news, your feedback and other data.
35 Countries, 1173 Windfarms, 7307 Stakeholders, 2711 Events, 161 Vessels, 131 Turbines NEW, 35 Ports,
Filter Projects by Country
Featured Ports
Featured Port
Able Middlesbrough Port, United Kingdom Image of <%# Eval("PortName") %> Maximum Trenched Depth: 8.5 m
Entrance Width: 84 m
Spring Tidal Range: 4.6 m
Quay Length: 250 m
Quay Loading Capability: 25 tonnes/m2
Land for Development: 16 ha
More details...



Who is generating power
Who's Generating Power?
1.  United Kingdom - 1858.40 MW
2.  Denmark - 874.48 MW
3.  China - 351.00 MW
More...
Whose Turbines are Generating?
Whose Turbines are Generating?
1.  Siemens Wind Power A/S (Siemens AG) - 1522.00 MW
2.  Vestas Offshore A/S (Vestas Wind Systems A/S) - 1404.12 MW
3.  REpower Systems AG (Suzlon Energy Limited) - 250.00 MW
Loading Map
RoleOrganisationDescription 
Developer Effeventi S.r.l. correct
Owner Effeventi S.r.l.
Percentage: Subscribe
correct
Vessels & Equipment Available for Immediate Charter
Statistics for San Michele
Wind Farm Name San Michele (also known as Molise) correct
CountryItaly
Region Molise correct
SeaName Adriatic Sea correct
Centre Latitude 42.087°
Centre Longitude 14.883°
Did you know? Its easy to add a map with this windfarm to your website! More...
Round, tender or call 
Development Status Consent Authorised correct
Comments on the StatusProject has faced severe opposition from local authorities.
Status Documentation
Capacity 162 MW correct
Turbine Capacity 3 MW correct
Number of Turbines 54 correct
Turbine Model Not Decided correct
10 Year Mean Wind Speed (2000-2009) Available online now
Other wind speed data at this location: 6 hr/day/month historic data..., BERR, NERL
(Now incorporating NERL models for USA Projects!)
Weather Forecast Services Weather Solutions For Offshore Wind Power
Rotor Diameter 90 m correct
Total Turbine Height correct
Hub Height correct
Other comments Turbine likely to be Vestas V90-3.0 MW correct
Foundation Grounded: Monopile correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Area 21 km2
Water Depth Min (Chart Datum) 12 m correct
Water Depth Max (Chart Datum) 20 m correct
Depth range stated by developer correct
Distance From Shore (reported) 4.5 km correct
Distance From Shore (computed from wind farm centre) 6.4 km
Export Cable Length correct
Infield Cable Length correct
Estimated Infield Cable Length This information is available in the purchased database - please enquire.
Export Cable Capacity 33 kV correct
Infield Cable Capacity 33 kV correct
Number of Export Cables 3 correct
Export Cable Type correct
Cable Description correct
Number of Offshore Substations 0 correct
Grid Connection Point Larino correct
Cable Landing Point Petacciato correct
Annual Capacity Factor correct
Expected Life 25 years correct
Estimated Capital Cost (CapEx) This information is available in the purchased database - please enquire.
Stated Project Cost correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Port For Installation Base correct
Port For Ops and Maintenance correct
Number of homes powered annually: 90,582 homes
CO2 Reduced Per Year 183,066 tonnes
SO2 Reduced Per Year 4,257 tonnes
Website No Website correct

Events on San Michele
DateTypeDescriptionSourceCorrect
Subscribe
Event Type: Installation - Offshore Construction Starts                                                                                                                                                                                                                    Installation - Offshore Construction Starts
Construction expected to start early Subscribe Subscribe correct
Oct-2010
Event Type: Planning - Other Approval                                                                                                                                                                                                                                      Planning - Other Approval
Completion of the layout design changes required by the Ministry of Environment; Other correct
Oct-2009
Event Type: Planning - Consent Authorised                                                                                                                                                                                                                                  Planning - Consent Authorised
Environment Minister and Culture Minister signed the approval of the project (VIA), the first Italian and Mediterranean offshore wind farm; Visit correct
Jun-2008
Event Type: Planning - Other Approval                                                                                                                                                                                                                                      Planning - Other Approval
Effeventi obtained the positive opinion from the Ministry of Environment EIA Committee in June 2008, received the Civil Aviation authorization from ENAC, ENAV, CIGA, the navigation authorization from the region coast guard, all military authorizations and the Electrical Grid connection from TERNA. Other correct
Nov-2005
Event Type: Planning - Consent Application Submitted                                                                                                                                                                                                                       Planning - Consent Application Submitted
Effeventi completed and submitted the Environmental Impact Assessment and related electrical projects (162MW) to the Ministry of Environment at the beginning of November 2005. Other correct

Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.

Comments on San Michele offshore wind farm Please note, your comment will take 1 hour to appear.

Your Name * :  
Web Site (optional) : http://  
Comment * :  
* required

Added: Fri, 14 Oct 2011 10:29:00 GMT
Effeventi completed and submitted the Environmental Impact Assessment and related electrical projects (162MW) to the Ministry of Environment at the beginning of November 2005. Since then, it went trough an intensive engineering and administrative process to comply with the all required permits. This phase has involved the Ministry of Environment, Ministry of Culture, Ministry of Economic Development, Ministry of Infrastructure and Transports. The offshore wind farm will be located in Molise water and will have 54 x 3MW turbines; estimated net yearly energy production: 445000 MWh. The company obtained the positive opinion from the Ministry of Environment EIA Committee in June 2008, received the Civil Aviation authorization from ENAC, ENAV, CIGA, the navigation authorization from the region coast guard, all military authorizations and the Electrical Grid connection from TERNA. October 2009: Environment Minister and Culture Minister signed the approval of the project (VIA), the first Italian and Mediterranean offshore wind farm; October 2010: completion of the layout design changes required by the Ministry of Environment; December 2010: "Conferenza dei Servizi" at the Ministry of Infrastructure and Transports. Link to the Ministry of Environment website where the Effeventi EIA Decree is reported (serial number 651): http://www.minambiente.it/home_it/menu.html?mp=/menu/menu_attivita/&m=Valutazione_di_Impatto_Ambientale__VIA_.html| Decreti_VIA_a.html|Tabella_Anni_2010_2007.html