Sandskallen – Sørøya nord (Category A area)
300 MW Development Zone Norway

"4C provides regular updates of in-depth data relative to our needs."

Reef Subsea

  • All Projects
  • Followed Projects
Please LogIn to follow projects
Search for Projects or Companies

Latest Windfarm News
Baltic 2 platform on the move
Recharge
The platform will bundle electricity from the offshore wind turbines and transform 33kV power into 150kV electricity that will be transported via subsea cables to land from the wind farm 32km north of the island of Rügen. EnBW in late August had started ...
Source: news.google.com
17/09/2014 14:29:16

Dong energy secures temp personnel for offshore wind projects
Renewable Energy Magazine (press release)
"Offshore wind energy has huge potential and I am pleased that our professionals will assist DONG Energy with their UK projects and in turn further increase their aim to successfully develop, construct and operate offshore wind farms in Northern Europe," ...
Source: news.google.com
17/09/2014 13:49:27

Atlas Professionals enters framework agreement for provision of offshore wind ...
Renewable Energy Magazine (press release)
“This Framework Agreement will further help Atlas enhance its position as a market leader in supplying experienced and qualified personnel to the offshore wind sector” said Laura Smith, Atlas Business Manager Offshore Wind. “Offshore wind energy has ...
Source: news.google.com
17/09/2014 11:23:18

RWE talks shop on Triton grid
reNews
RWE has unwrapped the blueprint for community consultations on the onshore electrical works for its proposed up to 900MW Triton Knoll offshore wind farm in the east of England. Adverts have been placed in local newspapers in Lincolnshire containing the ...
Source: news.google.com
17/09/2014 06:04:32

Canada falls behind global growth of offshore wind power: report
The Globe and Mail
Currently, Britain has the most offshore wind farms of any country, with about half of the worldwide capacity. While it will see more installed in the next few years – reaching 11 GW by 2020 – Britain's worldwide share will decrease to less than 30 per cent, the ...
Source: news.google.com
16/09/2014 22:06:18

Harnessing the wind
Sequim Gazette
William Shaw, atmospheric chemistry and meteorology scientist for Pacific Northwest National Laboratory, explains the technologically advanced and distinct instruments each buoy is equipped with to gather unique off-shore wind energy data in the open ...
Source: news.google.com
16/09/2014 23:51:34

A Million-Dollar Buoy Will Spot the Best Sites for Wind Farms
Gizmodo India
With roughly 12,383 miles of coastline, the US has plenty of potential installation sites for offshore wind farms. Floating data collection centers like the one shown above will help energy companies and government agencies alike find the windiest, and most ...
Source: news.google.com
16/09/2014 19:55:23

New Series: Brave Tern - Working on the edge (episode 1)
Deutsche Welle
Do German offshore wind farms have a future? 03.04.2013. Often hailed as the showpiece of German efforts to promote renewable energy, until recently there was general approval for the country's offshore wind farms. Now, however, the policy is falling out of ...
Source: news.google.com
16/09/2014 17:56:05

Cape Wind Signs Lease For New Bedford Staging Area
Banker & Tradesman
Announcing a lease deal with Cape Wind, state officials expect the offshore wind farm developers, who are still fighting lawsuits and assembling financing, to begin operations at the South Coast Marine Terminal in New Bedford in January 2015. The Mass ...
Source: news.google.com
16/09/2014 15:52:57

Volvo Penta Turns the Tide for Njord Offshore
The Maritime Executive
After initially being designed to accommodate a different propulsion system, Njord Offshore's four new windfarm crew vessels are all fitted with Volvo Penta IPS900 and will be in the water by early 2015. Volvo Penta exhibited its offshore windfarm solutions at ...
Source: news.google.com
16/09/2014 15:37:32



map not available
Developers/Owners/Operators
Project Details for Sandskallen – Sørøya nord (Category A area)
General Information Name Sandskallen – Sørøya nord (Category A area) correct
Other names Offshore wind - study area correct
Country name Norway correct
Region Finnmark correct
Comments NVE has divided the considered zones into three categories-

Category A: Wind power development within the zone

is technically and economically feasible, and will have

relatively few negative impacts. Grid connection is possible

before 2025.

Category B: Wind power development within the zone will

have challenges related to either technical aspects or conflict of interests/negative impacts. The challenges might

be resolved in the future through technology development,

grid measures and/or mitigation measures. NVE considers

that zones in this category can be opened when technology

matures, or when existing use of the areas changes.

Category C: Wind power development within the zone represents greater challenges than in the other two categories.

Conflicts of interest in the areas are not easily resolved.

Foreseen negative impacts are still considered acceptable. Zones in this category should not be opened at the

expense of zones in the two other categories.
correct
Round (or category) correct
Development status Development Zone correct
Comments on the status After a strategic impact assessment this area is one of five that is seen as having good factors and it is recommended that these areas are prioritised for potential offshore wind farms.

According to the ocean act of 01/07/2010 the establishment of renewable energy production at sea can in principle take place only after the state has opened the specified geographical areas for applications for licenses. This is one area being investigated for suitability.
correct
Power & Turbines Notice any Errors? You can keep this an open resource by submitting corrections!
Project Capacity 100 MW - 300 MW correct
Turbine Model Not Decided correct
Turbine Capacity correct
Number of Turbines correct
Total Turbine Height correct
Hub Height correct
Rotor Diameter correct
Foundation Not Decided (Grounded) correct
Windspeed 10 Year Mean Wind Speed (2000-2009) Available online now
Detailed wind speed data 6 hr/day/month historic data
Costs Stated Project Cost correct
Location & Environment Sea name Barents Sea correct
Centre latitude 70.943° correct
Centre longitude 22.551° correct
Area 260 km2 correct
Depth range (Chart Datum) 45 m - 224 m correct
Depth range stated by developer 27 m - 70 m correct
Distance From Shore (reported) 14 km correct
Distance From Shore (computed from centre) 22.6 km correct
Ports Installation base correct
Ops and maintenance correct
Grid Converter platforms correct
Offshore transformers correct
Grid connection point Hammerfest or planned Hyggevatn transformatorstasjon correct
Cable landing point correct
Export Cables
Please note that export cables connect the offshore transformer (substation) to either; shore or an offshore HVAC-HVDC converter station for onward transmission via HVDC cabling. Please see the converters page for planned converter stations and transmission cables.

The export cable length does not generally include the onshore component. The exception is when the onshore substation is close to shore.
Number of Export Cables correct
Average length per cable correct
Transmission type (e.g. HVAC) correct
Nominal voltage correct
Maximum voltage correct
Power rating correct
Number of cores correct
Conductor type correct
Section Area correct
Insulation correct
Number fibre optics correct
Export minimum bend radius (MBR) correct
Burial depth correct
Comments correct
Onshore Cables Number of onshore cables correct
Average length per cable correct
Comments correct
Array Cables Array cable length correct
Estimated cable length LogIn
Transmission type (e.g. MVAC) correct
Nominal voltage correct
Maximum voltage correct
Burial depth correct
Number of cores correct
Conductor type correct
Section correct
Insulation correct
Power rating correct
Number of fibre optics correct
Minimum bend radius (MBR) correct
Comments correct
Benefits Homes powered annually 195702 correct
CO2 reduced per year 395514 tonnes correct
SO2 reduced per year 9198 tonnes correct
Expected life correct