Sprogø
21 MW Fully Commissioned Denmark
Updated weekly to include the latest news, your feedback and other data.
35 Countries, 1173 Windfarms, 7307 Stakeholders, 2711 Events, 161 Vessels, 131 Turbines NEW, 35 Ports,
Filter Projects by Country
Featured Ports
Featured Port
Harwich Navyard, United Kingdom Image of <%# Eval("PortName") %> Maximum Trenched Depth: 8.5 m
Entrance Width:
Spring Tidal Range: 4.8 m
Quay Length: 175 m
Quay Loading Capability:
Land for Development:
More details...



Who is generating power
Who's Generating Power?
1.  United Kingdom - 1858.40 MW
2.  Denmark - 874.48 MW
3.  China - 351.00 MW
More...
Whose Turbines are Generating?
Whose Turbines are Generating?
1.  Siemens Wind Power A/S (Siemens AG) - 1522.00 MW
2.  Vestas Offshore A/S (Vestas Wind Systems A/S) - 1404.12 MW
3.  REpower Systems AG (Suzlon Energy Limited) - 250.00 MW
Loading Map
RoleOrganisationDescription 
Developer Sund & Baelt Holding A/S correct
Operator Sund & Baelt Holding A/S correct
Owner Sund & Baelt Holding A/S
Percentage: Subscribe
correct
VesselRoleOrganisationDescriptionCorrect
EIDE Barge 5 Vessel-Foundation Installation(turbine) Eide Contracting AS Installation of 7 concrete gravity based foundations - Client: ABJV - (Aarsleff Bilfinger Berger JV) More... correct
SEA ENERGY (Formally Ocean Ady) Vessel-Transportation A2SEA Period: Oct-2009 to 31-Oct-2009
Transportation and installation of 7 Vestas 3.0 MW turbines - Client: Vestas More...
correct
SEA ENERGY (Formally Ocean Ady) Vessel-Turbine Installation A2SEA Period: Oct-2009 to 31-Oct-2009
Transportation and installation of 7 Vestas 3.0 MW turbines - Client: Vestas More...
correct
Vessels & Equipment Available for Immediate Charter
Statistics for Sprogø
Wind Farm Name Sprogø (also known as Storebaelt) correct
CountryDenmark
Region Korsør correct
SeaName Kattegat correct
Centre Latitude 55.343°
Centre Longitude 10.958°
Did you know? Its easy to add a map with this windfarm to your website! More...
Round, tender or callOpen Door (DK)
Development Status Fully Commissioned correct
Comments on the Status 
Status Documentation
Capacity 21 MW correct
Turbine Capacity 3 MW correct
Number of Turbines 7 correct
Turbine Model V90-3.0 MW Offshore (Vestas) correct
10 Year Mean Wind Speed (2000-2009) Available online now
Other wind speed data at this location: 6 hr/day/month historic data..., BERR, NERL
(Now incorporating NERL models for USA Projects!)
Weather Forecast Services Weather Solutions For Offshore Wind Power
Rotor Diameter 90 m correct
Total Turbine Height 115 m correct
Hub Height 70 m correct
Other comments correct
Foundation Grounded: Gravity-Base correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Area 0 km2
Water Depth Min (Chart Datum) 6 m correct
Water Depth Max (Chart Datum) 16 m correct
Depth range stated by developer 6 m - 16 m correct
Distance From Shore (reported) 10.6 km correct
Distance From Shore (computed from wind farm centre) 9.3 km
Export Cable Length 0.6 km correct
Infield Cable Length correct
Estimated Infield Cable Length This information is available in the purchased database - please enquire.
Export Cable Capacity correct
Infield Cable Capacity 10 kV correct
Number of Export Cables correct
Export Cable Type correct
Cable Description 10KV cables come ashore to a transformer on Sprogø. Then power is transferred to network on island of Funen, down existing 60KV cable. correct
Number of Offshore Substations 0 correct
Grid Connection Point Funen correct
Cable Landing Point Sprogo correct
Annual Capacity Factor correct
Expected Life correct
Estimated Capital Cost (CapEx) This information is available in the purchased database - please enquire.
Stated Project Cost correct
Notice any Errors? Please help keep this an open and free resource by submitting corrections.
Port For Installation Base correct
Port For Ops and Maintenance correct
Number of homes powered annually: 11,742 homes
CO2 Reduced Per Year 23,731 tonnes
SO2 Reduced Per Year 552 tonnes
Website Visit correct

Events on Sprogø
DateTypeDescriptionSourceCorrect
Dec-2009
Event Type: Operation - Generating Power                                                                                                                                                                                                                                   Operation - Generating Power
Generating power in early December. Visit correct
Nov-2009
Event Type: Installation - Turbine Installation                                                                                                                                                                                                                            Installation - Turbine Installation
Installation of turbines due to finish in early November. Visit correct
15-Oct-2009
Event Type: Installation - Foundation Installation                                                                                                                                                                                                                         Installation - Foundation Installation
Installation of foundations is scheduled to finish in mid October Visit correct
15-Oct-2009
Event Type: Installation - Cable installation                                                                                                                                                                                                                              Installation - Cable installation
Installation of cable is due to finish in mid October. Visit correct
15-Oct-2009
Event Type: Installation - Foundation Installation                                                                                                                                                                                                                         Installation - Foundation Installation
Installation of foundation started on 10/08/2009. Visit correct
Oct-2009
Event Type: Installation - Turbine Installation                                                                                                                                                                                                                            Installation - Turbine Installation
Installation of turbines due to start in early October. Visit correct
15-Sep-2009
Event Type: Installation - Cable installation                                                                                                                                                                                                                              Installation - Cable installation
Installation of cable is due to start in mid September. Visit correct

Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.

Be the first to comment on Sprogø offshore wind farm Please note, your comment will take 1 hour to appear.

Your Name * :  
Web Site (optional) : http://  
Comment * :  
* required


Weather Forecast for Sprogø More weather tools available on 4C Interactive Map. More weather forecast tools