Sprogø
21 MW Fully Commissioned Denmark
Updated weekly to include the latest news, your feedback and other data.
38 Countries, 1325 Windfarms, 9264 Stakeholders, 4395 Events, 844 Vessels, 160 Turbines NEW, 42 Ports,
Filter Projects by Country
Featured Ports
Featured Port
Newhaven - Fendercare Marine, United Kingdom Image of <%# Eval("PortName") %> Maximum Trenched Depth:
Entrance Width: 55 m
Spring Tidal Range: 6.6 m
Quay Length: 330 m
Quay Loading Capability: 90 tonnes/m2
Land for Development: 14 ha
More details...



Who is generating power
Who's Generating Power?
1.  United Kingdom - 3321.2000 MW
2.  Denmark - 871.4800 MW
3.  China - 559.5000 MW
More...
Whose Turbines are Generating?
Whose Turbines are Generating?
1.  Siemens Wind Power A/S (Siemens AG) - 3084.8000 MW
2.  Vestas Offshore A/S (Vestas Wind Systems A/S) - 1401.1200 MW
3.  REpower Systems AG (Suzlon Energy Limited) - 434.5000 MW
Loading Map
RoleOrganisationDescription 
Developer Sund & Baelt Holding A/S correct
Operator Sund & Baelt Holding A/S correct
Owner Sund & Baelt Holding A/S 100% stake
Percentage: Subscribe
correct
Equipment Available for Charter
Statistics for Sprogø
General Information Name Sprogø correct
Other names Storebaelt correct
Country name Denmark correct
Region Korsør correct
Comments correct
Round (or category) Open Door (DK) correct
Development status Fully Commissioned correct
Comments on the status correct
Power & Turbines Notice any Errors? You can keep this an open resource by submitting corrections!
Project Capacity 21 MW correct
Turbine Model V90-3.0 MW Offshore (Vestas) correct
Turbine Capacity 3 MW correct
Number of Turbines 7 correct
Total Turbine Height 115 m correct
Hub Height 70.00 m correct
Rotor Diameter 90 m correct
Foundation Grounded: Gravity-Base correct
Windspeed 10 Year Mean Wind Speed (2000-2009) Available online now
Detailed wind speed data 6 hr/day/month historic data
Costs Stated Project Cost correct
Location & Environment Sea name Kattegat correct
Centre latitude 55.343° correct
Centre longitude 10.958° correct
Area 0 km2 correct
Depth range (Chart Datum) 6 m - 16 m correct
Depth range stated by developer 6 m - 16 m correct
Distance From Shore (reported) 10.6 km correct
Distance From Shore (computed from centre) 9.3 km correct
Ports Installation base Port of Kalundborg correct
Ops and maintenance Sprogø correct
Grid Converter platforms None correct
Offshore transformers None correct
Grid connection point Sprogø, Nyborg correct
Cable landing point Sprogø, Nyborg correct
Export Cables
Please note that export cables connect the offshore transformer (substation) to either; shore or an offshore HVAC-HVDC converter station for onward transmission via HVDC cabling. Please see the converters page for planned converter stations and transmission cables.

The export cable length does not generally include the onshore component. The exception is when the onshore substation is close to shore.
Number of Export Cables 2 correct
Average length per cable 0.7 km correct
Transmission type (e.g. HVAC) MVAC correct
Nominal voltage 10 kV correct
Maximum voltage correct
Power rating correct
Number of cores correct
Conductor type correct
Section correct
Insulation correct
Number fibre optics correct
Minimum bend radius (MBR) correct
Burial depth correct
Comments 10KV cables come ashore to a transformer on Sprogø. Then power is transferred to network on island of Funen, down existing 60KV cable. correct
Onshore Cables (new) Number of onshore cables correct
Average length per cable correct
Comments 10kV correct
Array Cables Array cable length 3 km correct
Estimated cable length In purchased database
Transmission type (e.g. MVAC) MVAC correct
Nominal voltage 10 kV correct
Maximum voltage correct
Burial depth correct
Number of cores correct
Conductor type correct
Section correct
Insulation correct
Power rating correct
Number of fibre optics correct
Minimum bend radius (MBR) correct
Comments correct
Benefits Homes powered annually 11742 correct
CO2 reduced per year 23731 tonnes correct
SO2 reduced per year 552 tonnes correct
Expected life correct
Other Website Visit correct

Events on Sprogø
12
DateTypeDescriptionSourceCorrect
Dec-2009
Event Type: Operation - Fully Commissioned Operation - Fully Commissioned
Full power generation in early December. Visit correct
Nov-2009
Event Type: Operation - Generating Power Operation - Generating Power
First power generation. Visit correct
Nov-2009
Event Type: Installation - Turbine Installation Installation - Turbine Installation
Installation of turbines finished around early November. Visit correct
15-Oct-2009
Event Type: Installation - Foundation Installation Installation - Foundation Installation
Installation of foundation started on this date. Visit correct
15-Oct-2009
Event Type: Installation - Foundation Installation Installation - Foundation Installation
Installation of foundations finished around mid October. Visit correct
15-Oct-2009
Event Type: Installation - Cable installation Installation - Cable installation
Installation of cable finished around mid October. Visit correct
Oct-2009
Event Type: Installation - Turbine Installation Installation - Turbine Installation
Installation of turbines started in October. Visit correct
15-Sep-2009
Event Type: Installation - Cable installation Installation - Cable installation
Installation of cable started in mid September. Visit correct
Sep-2009
Event Type: Installation - Offshore Construction Starts Installation - Offshore Construction Starts
Offshore construction work started. Visit correct
2009
Event Type: Planning - Consent Authorised Planning - Consent Authorised
Estimated year for planning consent to be authorised. Visit correct
12

Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.
Be the first to comment on Sprogø offshore wind farm Please note, your comment will take 1 hour to appear.

Your Name * :  
Web Site (optional) : http://  
Comment * :  
* required