Stadthavet
1,500 MW Development Zone Norway
Updated weekly to include the latest news, your feedback and other data.
38 Countries, 1323 Windfarms, 9111 Stakeholders, 4314 Events, 824 Vessels, 154 Turbines NEW, 42 Ports,
Filter Projects by Country
Featured Ports
Featured Port
EastPort UK, United Kingdom Image of <%# Eval("PortName") %> Maximum Trenched Depth: 11 m
Entrance Width: 210 m
Spring Tidal Range: 1.96 m
Quay Length: 1400 m
Quay Loading Capability: 3 tonnes/m2
Land for Development: 12 ha
More details...



Who is generating power
Who's Generating Power?
1.  United Kingdom - 3321.2000 MW
2.  Denmark - 871.4800 MW
3.  China - 559.5000 MW
More...
Whose Turbines are Generating?
Whose Turbines are Generating?
1.  Siemens Wind Power A/S (Siemens AG) - 3084.8000 MW
2.  Vestas Offshore A/S (Vestas Wind Systems A/S) - 1401.1200 MW
3.  REpower Systems AG (Suzlon Energy Limited) - 434.5000 MW
Loading Map
Equipment Available for Charter
Statistics for Stadthavet
General Information Name Stadthavet correct
Other names Offshore wind - proposed study area correct
Country name Norway correct
Region Sogn og Fjordane correct
Comments correct
Round (or category) correct
Development status Development Zone correct
Comments on the status After a strategic impact assessment this is one of 8 areas that would be considered only if all of the conditions allowed.
According to the ocean act of 01/07/2010 the establishment of renewable energy production at sea can in principle take place only after the state has opened the specified geographical areas for applications for licenses. This is one area being investigated for suitability.
correct
Power & Turbines Notice any Errors? You can keep this an open resource by submitting corrections!
Project Capacity 500 MW - 1,500 MW correct
Turbine Model Not Decided correct
Turbine Capacity correct
Number of Turbines correct
Total Turbine Height correct
Hub Height correct
Rotor Diameter correct
Foundation Not Decided (Floating) correct
Windspeed 10 Year Mean Wind Speed (2000-2009) Available online now
Detailed wind speed data 6 hr/day/month historic data
Costs Stated Project Cost correct
Location & Environment Sea name North Sea correct
Centre latitude 62.281° correct
Centre longitude 3.732° correct
Area 516 km2 correct
Depth range (Chart Datum) 183 m - 250 m correct
Depth range stated by developer 168 m - 264 m correct
Distance From Shore (reported) 58 km correct
Distance From Shore (computed from centre) 71.1 km correct
Ports Installation base correct
Ops and maintenance correct
Grid Converter platforms correct
Offshore transformers correct
Grid connection point Ålfoten correct
Cable landing point correct
Export Cables
Please note that export cables connect the offshore transformer (substation) to either; shore or an offshore HVAC-HVDC converter station for onward transmission via HVDC cabling. Please see the converters page for planned converter stations and transmission cables.

The export cable length does not generally include the onshore component. The exception is when the onshore substation is close to shore.
Number of Export Cables correct
Average length per cable correct
Transmission type (e.g. HVAC) correct
Nominal voltage correct
Maximum voltage correct
Power rating correct
Number of cores correct
Conductor type correct
Section correct
Insulation correct
Number fibre optics correct
Minimum bend radius (MBR) correct
Burial depth correct
Comments correct
Onshore Cables (new) Number of onshore cables correct
Average length per cable correct
Comments correct
Array Cables Array cable length correct
Estimated cable length In purchased database
Transmission type (e.g. MVAC) correct
Nominal voltage correct
Maximum voltage correct
Burial depth correct
Number of cores correct
Conductor type correct
Section correct
Insulation correct
Power rating correct
Number of fibre optics correct
Minimum bend radius (MBR) correct
Comments correct
Benefits Homes powered annually 838723 correct
CO2 reduced per year 1695060 tonnes correct
SO2 reduced per year 39420 tonnes correct
Expected life correct
Other Website Visit correct

Events on Stadthavet
DateTypeDescriptionSourceCorrect
04-Jan-2013
Event Type: PrePlanning - Feasibility Study                                                                                                                                                                                                                                PrePlanning - Feasibility Study
A report on impacts of 15 potential wind farm areas with consideration to technical-economic and environmental factors was published. The conclusions showed that 5 areas had good technical-economic conditions and the overall consequences were considered acceptable, 8 other areas areas could be considered if the conditions warranted and 2 of the areas will never be opened due to issues with land use and environmental conditions. Visit correct

Please click to add windfarm events via this link, providing approximate date etc. Possible events include consent submission, approval, installation, generating power etc.
Be the first to comment on Stadthavet offshore wind farm Please note, your comment will take 1 hour to appear.

Your Name * :  
Web Site (optional) : http://  
Comment * :  
* required