Image of Humber Gateway Substation


Substation Name Humber Gateway Substation correct
Substation Status Operational correct
Latitude 53.66 ° correct
Longitude 0.25 ° correct
Comments Fabricom put in a total of 44,000 man hours. correct
Cost of the Substation correct
Cost Description correct
Foundation Type Jacket correct
Foundation Weight 1250 t correct
Foundation Comments MPI installed a total of 2,508 T. Broken down as: jacket foundation (570T), 8 piles (680T), module support frame (320T), 2 topside modules (430T each) sling laydown platform (20T) and 2 stairs. correct
Topside Weight 1258 t correct
Topside Dimensions (LxWxH) correct
Helideck No correct
Number of Transformers 2 correct
Transformer Power 140 MVA correct
Transformer Ratio 33/132 kV correct
Switchgear 132kV and 33 kV GIS correct
Other Equipment correct

Call +44 (0)1502 307 037 for more information

Keep on top of the market. Perform analysis. Make informed decisions.

CONTACT US

This page is intended to be viewed online and may not be printed without a valid subscription.

Please view this page at http://www.4coffshore.com/windfarms/substationdetails.aspx?sid=36.