TGS | Powered by 4C Offshore

4C is now TGS

We are excited to announce a significant milestone in 4C Offshore's journey. Our integration into the TGS family marks the beginning of a new era in offshore wind market intelligence.


Learn what this means for you!

Succesful first loadout for Gode Wind 01

4C Offshore | Lewis Holdsworth
By: Lewis Holdsworth 23/03/2015 Bladt Indsutries (Edited by 4C Offshore)
Friday night (20th March 2015) was full of heavy activity at Bladt’s site in Aalborg. At 04.40 am Saturday morning, the first loadout of four anode cages and transition pieces for Gode Wind Offshore Wind Farm was finished in approximately 16 hours making it a great success.

Before its arrival in Aalborg, the barge had visited Rostock in order to pick up the four monopoles for the transition pieces.

Completed installation of the 55 transition pieces is due to be completed this year.

Gode Wind 01 consists of 55 SWT-6.0-154 Siemens turbines, the project is 40km from the German coastline. Total expected cost is €1247million (£908million) ($1354million).

You can visit Gode Wind 01 on our site HERE.

Premium

4C Offshore Premium, our most popular subscription, gives you full access to use the 4C Offshore WebApp which includes exclusive offshore wind, transmission and vessel reports, news and downloads.

Request a 30 minute Demo

Trending News!